jiu gu

jiu gu


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 September 2019 in Energies
Verified
Journal Article
Open access
PDF file
JGjiu gu
jiu gu
YWYining Wang
Yining Wang
DXDa Xie
Da Xie
YZYu Zhang
Yu Zhang
The operation prediction of wind farms will be accompanied by the need for massive data processing, especially the preprocessing of wind farm meteorological data or numerical weather prediction (NWP). Because NWP data are strongly correlated with wind farm operation, proper processing of NWP data could not only reduce data volume but also improve the correlations of wind farm operation predictions. For this purpose, this paper proposes a data preprocessing algorithm based on t-distributed stochastic neighbor embedding (t-SNE). Firstly, the data collected were normalized to eliminate the influence caused by different dimensions. The t-SNE algorithm is then used to reduce the dimensionality of the NWP data related to wind farm operation. Finally, the wind farm data visualization platform is established. In this paper, 22 index variables in NWP data were taken as objects. The t-SNE method was used to preprocess the NWP historical data of a wind farm, and the results were compared with the results of the principal component analysis (PCA) algorithm. It outperformed PCA in error precision; in addition, t-SNE dimension reduction preprocessing also had a visual effect, which could be applied to big data visualization platforms. A long short-term memory network (LSTM) was used to predict the operation of the wind farm by combining the preprocessed NWP data and the operation data. The simulation results proved that the effect of the preprocessed NWP data based on t-SNE on the wind power prediction was significantly improved.