Huichen Xu

Dr. Huichen Xu

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2017 in International Journal of Rock Mechanics and Mining Sciences
Verified
Journal Article
Closed access
XSXiaoming Sun
Xiaoming Sun
HXHuichen Xu
Huichen Xu
MHManchao He
Manchao He
FZFang Zhang
Fang Zhang

1 March 2017 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
XSXiao-Ming Sun
Xiao-Ming Sun
FCFeng Chen
Feng Chen
MHMan-Chao He
Man-Chao He
WGWei-Li Gong
Wei-Li Gong
HXHuichen Xu
Huichen Xu
HLHao Lu
Hao Lu

19 September 2016 in Science China Technological Sciences
Verified
Journal Article
Closed access
PDF file
XSXiaoming Sun
Xiaoming Sun
HXHuichen Xu
Huichen Xu
LZLianGe Zheng
LianGe Zheng
MHManChao He
ManChao He
WGWeiLi Gong
WeiLi Gong

18 January 2017 in International Journal of Minerals, Metallurgy and Materials
Verified
Journal Article
Closed access
PDF file
XSXiaoming Sun
Xiaoming Sun
YZYong Zhang
Yong Zhang
DWDong Wang
Dong Wang
JYJun Yang
Jun Yang
HXHuichen Xu
Huichen Xu
MHMan-Chao He
Man-Chao He

1 January 2020 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
YZYong Zhang
Yong Zhang
HXHuichen Xu
Huichen Xu
PSPeng Song
Peng Song
XSXiaoming Sun
Xiaoming Sun
MHManchao He
Manchao He
ZGZhibiao Guo
Zhibiao Guo
The stress concentration of gob‐side entry surrounding rock is a hot topic in coal mining. In this paper, through theoretical analysis and numerical simulation, the pressure relief mechanism of the gob‐side entry retaining by roof cutting and pressure release (RCPR) and the spatiotemporal development law of surrounding rock stress of the gob‐side entry were analyzed. The studies showed that the gob‐side entry retaining by RCPR shortened the length of the lateral cantilever by directional roof cutting, which weakened the stress level of the gob‐side entry. In the meantime, the goaf gangues could play a good filling role by using their breaking and swelling characteristics under the action of gangue‐blocking supports and further optimized the stress environment along the roadway. Field industrial tests verified that the gob‐side entry retaining by RCPR had a significant effect on pressure relief, and the surrounding rock stress and deformation tended to stabilize after about 160 m of lagging working face. Numerical analysis reproduced the whole process of “mining‐retention‐using” of roof cutting roadway and revealed that surrounding rocks were always in the zone of relative stress reduction during the whole process. The peak value of mining‐induced lateral stress was about 10 m away from the middle point of the gob‐side entry. The change of surrounding rock stress could be divided into three stages: significant increase, dynamic adjustment, and stable stage. However, during the second mining, the stress connected zone would appear on the leading working face, and the stress concentration in this zone was significant. Based on the above analysis, we concluded that the new technology could be applied to the medium‐thickness coal seam in the composite roof.

1 March 2015 in International Journal of Mining Science and Technology
Verified
Journal Article
Closed access
JYJun Yang
Jun Yang
DWDong Wang
Dong Wang
HSHaiyang Shi
Haiyang Shi
HXHuichen Xu
Huichen Xu