Multi-train modeling and simulation plays a vital role in railway electrification during operation and planning phase. Study of peak power demand and energy consumed by each traction substation needs to be determined to verify that electrical energy flowing in its railway power feeding system is appropriate or not. Gauss–Seidel, conventional Newton–Raphson, and current injection methods are well-known and widely accepted as a tool for electrical power network solver in DC railway power supply study. In this paper, a simplified Newton–Raphson method has been proposed. The proposed method employs a set of current-balance equations at each electrical node instead of the conventional power-balance equation used in the conventional Newton–Raphson method. This concept can remarkably reduce execution time and computing complexity for multi-train simulation. To evaluate its use, Sukhumvit line of Bangkok transit system (BTS) of Thailand with 21.6-km line length and 22 passenger stopping stations is set as a test system. The multi-train simulation integrated with the proposed power network solver is developed to simulate 1-h operation service of selected 5-min headway. From the obtained results, the proposed method is more efficient with approximately 18 % faster than the conventional Newton–Raphson method and just over 6 % faster than the current injection method.
22 October 2017 in Journal of Modern Transportation
A problem of peak power in DC-electrified railway systems is mainly caused by train power demand during acceleration. If this power is reduced, substation peak power will be significantly decreased. This paper presents a study on optimal energy saving in DC-electrified railway with on-board energy storage system (OBESS) by using peak demand cutting strategy under different trip time controls. The proposed strategy uses OBESS to store recovered braking energy and find an appropriated time to deliver the stored energy back to the power network in such a way that peak power of every substations is reduced. Bangkok Mass Transit System (BTS)-Silom Line in Thailand is used to test and verify the proposed strategy. The results show that substation peak power is reduced by 63.49% and net energy consumption is reduced by 15.56% using coasting and deceleration trip time control.
This paper describes optimal power flow based on swarm intelligences in which the power transmission loss function is used as the problem objective. Although most of optimal power flow problems involve the total production cost of the entire power system, in some cases some different objective may be chosen. In this paper, to minimize the overall power transmission losses, four decision variables are participated. They are i) power generated from generating plants, ii) specified voltage magnitude at control substations, iii) tap position of tap changing transformers and iv) reactive power injection from reactive power compensators. Swarm intelligences are wellknown and widely accepted as potential intelligent search methods for solving such a problem. In this paper, Genetic Algorithms (GA), Particle Swarm Optimization (PSO), Artificial Bee Colony (ABC) and Differential Evolution (DE) are employed to solve optimal power flow problems. A 6-bus and 30-bus IEEE power systems are used for test. As a result, all swarm intelligences search algorithms can solve optimal power flow problems efficiently. The artificial bee colony and the differential evolution provide results better than other swarm intelligent techniques.
7 February 2018 in Iranian Journal of Science and Technology, Transactions of Electrical Engineering
Urban passenger mobility challenges can be sustainably eased with electric trains. However, due to the visual impact, safety and, electrification cost concerns, some routes or section(s) of a route are not electrified. In such cases, battery powered trams present a promising alternative. Rail vehicles are heavy but, they have a low coefficient of rolling friction. Consequently, they draw high power during acceleration as compared to the power demand during cruising. Thus, a high capacity high‐voltage traction battery is required to provide accelerating power. To minimise total electrified distance and traction battery size, a battery and accelerating‐contact line (BACL) hybrid tram system in which a tram accelerates from a station drawing power from a short contact line and cruises with traction battery is presented. Simulated in MATLAB, the BACL hybrid tram system with 1.8 km total electrified distance has equivalent performance to the conventional battery and contact line hybrid tram system with 12.2 km total electrified distance. Compared to independently battery powered tram, battery size is reduced by 62.5%. Suggested applications for the BACL tram system are on short, fairly flat, idle lines with few stops.