Quanyuan Jiang

Quanyuan Jiang


Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 January 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
RYRong Yan
Rong Yan
GGGuangchao Geng
Guangchao Geng
QJQuanyuan Jiang
Quanyuan Jiang
YLYanglin Li
Yanglin Li
Stability assessment is a regular routine in both power system planning and operation. It is computationally demanding using state-of-the-art approaches like time-domain simulation (TDS), as numerous scenarios (e.g., N-1 contingencies) have to be assessed for a large batch of contingencies. The purpose of this work is to determine stability conclusion before the simulator reaches the end of simulating time windows. Therefore, TDS can be terminated early so as to reduce the average simulation time for batch assessment without losses of accuracy. The idea is to develop a data-driven methodology to “learn” from existing TDS results in the batch and “infer” stability conclusions using current available TDS output. To achieve this goal, cascaded convolutional neural networks (CNNs) are designed to capture data from different TDS time intervals, extract features, predict stability probability and determine TDS termination. While accumulating more knowledge in batch processing, early termination criterion is refreshed continuously via feedback learning to terminate TDS increasingly earlier, with the increase of existing TDS results in the batch. Case studies in IEEE 39-bus and Polish 2383-bus system illustrate effectiveness of the proposed method.

30 March 2023 in Energy
Verified
Journal Article
Closed access
XLXining Li
Xining Li
LJLingling Ju
Lingling Ju
GGGuangchao Geng
Guangchao Geng
QJQuanyuan Jiang
Quanyuan Jiang

1 May 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
SWSiyuan Wang
Siyuan Wang
GGGuangchao Geng
Guangchao Geng
QJQuanyuan Jiang
Quanyuan Jiang
Energy storage is a potential planning option to relieve transmission congestion caused by increasing penetration of renewable energy. This paper presents a robust formulation for energy storage and transmission line co-planning, considering binary variables that represent energy storage statuses in the recourse problem. In order to solve this model, an improved nested column and constraint generation (nested C&CG) algorithm is used to cope with numerical issues caused by new binary variables, big-M constraints, and the enormous size of the problem. Case studies of a modified Garver's 6-bus system and a practical Chinese 196-bus system were used to assess the effectiveness of the proposed approach. The numerical results indicate that energy storage is more economical for relieving the transmission line congestion when the transmission distance is relatively long.

24 December 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
WLWenlong Liu
Wenlong Liu
GGGuangchao Geng
Guangchao Geng
QJQuanyuan Jiang
Quanyuan Jiang
HFHaifeng Fan
Haifeng Fan
JYJing Yu
Jing Yu
With the advantage of quick response and flexible ramp, energy storage system (ESS) offers a promising capability of fast frequency control for power systems, especially under a severe disturbance. This paper proposes an ESS control strategy using local measurement in order to provide fast frequency support right after a sufficiently severe disturbance is observed. The proposed strategy includes online frequency characteristic estimator and online optimization controller. Distinguished from existing approaches, no prior knowledge of power system model is required in this work, including generator configuration, operation condition, and frequency response of each component. Instead, the overall system frequency characteristic is approximated online by the proposed estimator. Then, the power setpoint of ESS is determined adaptively to participate in frequency control by the proposed model predictive controller. Finally, the effectiveness of the proposed method is verified via real-world data of a provincial power grid in China.

31 January 2024 in Energies
Verified
Journal Article
Open access
PDF file
WMWan Muchun
Wan Muchun
HYHeyang Yu
Heyang Yu
YHYingning Huo
Yingning Huo
KYKan Yu
Kan Yu
QJQuanyuan Jiang
Quanyuan Jiang
GGGuangchao Geng
Guangchao Geng
Electric vehicles (EVs) play a crucial role in the global transition towards decarbonization and renewable energy resources (RERs). As EVs gain popularity, this has resulted in various challenges for the power grid, such as an intensified peak-to-valley load differential, causing transformer overloading. Vehicle-to-grid (V2G) technology has emerged as a promising solution due to its controllable charging and discharging capabilities. Mature business schemes can incentivize the development of V2G technology. However, the business schemes of V2G technology are still unclear. Therefore, this paper provides a comprehensive review of the business schemes associated with V2G technology, especially focusing on its feasibility and challenges with respect to the electricity market. In this paper, several business schemes with respect to the electricity market are explored by conducting extensive literature reviews, including peak-to-valley arbitrage, the spot market, demand–response (DR), frequency regulation, voltage regulation, spinning reserve, and black start. Next, application scenarios and real-world use cases of the V2G technology’s business schemes are investigated. Furthermore, the challenges faced by the V2G technology’s business schemes are assessed by considering the technical, economical, and social aspects. By identifying these challenges, it is important to highlight the existing shortcomings and areas of interest for V2G technology’s research and development. This review contributes to a deeper understanding of V2G technology and its implications for the energy sector.

1 May 2015 in IET Renewable Power Generation
Verified
Journal Article
Open access
PDF file
HWHaijiao Wang
Haijiao Wang
Zhe ChenZhe Chen
Zhe Chen
QJQuanyuan Jiang
Quanyuan Jiang
This study proposes an optimal control method for variable speed wind turbines (VSWTs) based wind farm (WF) to support temporary primary frequency control. This control method consists of two layers: temporary frequency support control (TFSC) of the VSWT, and temporary support power optimal dispatch (TSPOD) of the WF. With TFSC, the VSWT could temporarily provide extra power to support system frequency under varying and wide‐range wind speed. In the WF control centre, TSPOD optimally dispatches the frequency support power orders to the VSWTs that operate under different wind speeds, minimises the wind energy cost of frequency support, and satisfies the support capabilities of the VSWTs. The effectiveness of the whole control method is verified in the IEEE‐RTS built in MATLAB\Simulink, and compared with a published de‐loading method.