In very shallow areas, the frequency by which coastal structures (like dikes and seawalls) are directly broken by large wave forces is low because large waves are broken in deeper areas. The main cause for such destruction is ground scour in front of the structures and outflow of backfilling materials by middle-scale waves; therefore, the scour and the outflow should be considered when designing a coastal structure in a very shallow area. In this paper, a numerical model consisting of CADMAS-SURF, which can calculate fluid motion in porous media, and empirical equations for simulating the outflow phenomena are introduced; thereafter, practical calculations on field cases in Thailand and Japan are demonstrated. Additionally, since the effects of wave periods and water depth to the outflow rate have never been clarified, hydraulic model experiments, empirical calculations using an existing formula, and numerical simulations are performed in order to examine these effects on the outflow rate. The simulated results using the numerical model align well with the experimental results. Moreover, both results show that the outflow rate is proportional to the wave period and inversely proportional to water depth.
Workflow for reliability-based pump sizing, from design inputs and modelling steps to operating point, reliability, power evaluation, and final pump selection. Conventional pump sizing in building water supply systems follows Hunter's Fixture Unit (FU) method, which deterministically assigns peak demand at approximately the 99th percentile. While conservative, this approach often leads to oversizing and operation away from the best efficiency point (BEP). This study introduces a probabilistic yet closed-form framework that reframes FU as a percentile demand model and extends it into a reliability spectrum. Fixture demand is represented by normal and lognormal distributions calibrated such that FU corresponds to the 99th percentile. Pump operating points are determined by the intersection of the system curve (Darcy–Weisbach, Colebrook–White, K-method) and polynomial-fitted pump curves, with BEP identified analytically. Hydraulic reliability is then computed directly from the demand cumulative distribution function (CDF). A representative case study demonstrates how the framework quantifies trade-offs between reliability and pump power. The method offers transparency, reproducibility, and practical decision support for engineers by linking catalogue pump selection with explicit reliability targets. Future extensions may incorporate variable-speed drives, multi-pump operation, and stochastic pipe parameters.
4 June 2026 in Suranaree Journal of Science and Technology
The Precedence Diagram Method (PDM) relies on deterministic activity times to calculate the Total Project Duration (TPD), a characteristic that inherently limits its predictive accuracy. To address this limitation, the present study integrates Monte Carlo Simulation (MCS) with conventional PDM calculation to predict the TPD of a luxury housing project. Initially, the critical path was identified through the conventional PDM approach. Subsequently, MCS was applied, running 10,000 iterations under the assumption of a normal distribution for all activity durations. The choice of normal distribution is grounded in Central Limit Theorem (CLT), which is efficient for aggregate project level. The TPD for each iteration was recorded, thus generating a probability distribution for project completion time. The deterministic PDM analysis initially yielded a TPD of 420 days. In contrast, the MCS approach produced a mean TPD of 397 days (a 23-day reduction) and revealed only a 45.6% probability of meeting the original deterministic completion date. By incorporating the inherent variability of activity durations, the MCS-derived TPD provides significantly more realistic timeline projections and probabilistic insights. This study demonstrates the potential of MCS in residential construction projects, which remains underutilized in Thailand. Consequently, this research demonstrates a tangible advancement over conventional, deterministic network planning methodologies.