Khojiakbar Khasanov

Mr. Khojiakbar Khasanov

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 June 2021 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
KKKhojiakbar Khasanov
Khojiakbar Khasanov
AAAzamat Ahmedov
Azamat Ahmedov
This study investigates the accuracy of various DEMs (SRTM DEM, ASTER GDEM, and ALOS PALSAR DEM) for the area of the designing Pskom water reservoir (recommended to construction in Pskom River, in Tashkent region. DEMs are compared for the study area using the Global Mapper application and selection Ground Control Points (GCP). The RMSE we calculate is the most easily interpreted statistic as the square root of the mean square error because it has the same units as the quantity drawn on the vertical axis. Results show that SRTM based measurements of ground control points (GCPs) exhibit RMSE of 15.72 m while ASTER DEM based measurements exhibits and RMSE of 18.47 m, ALOS PALSAR exhibit RMSE of 14.02 m for the Water reservoir located in the plain. There are AOS PALSAR outperforms SRTM and ASTER DEM in detecting vertical accuracy. Based on the capabilities of the Global Mapper program, we can build the longitudinal profile of the approximate location where the dam can be built in each DEM and compare. The results obtained show that the dam height is 187 m at ALOS PALSAR DEM, 168 m at ASTER GDEM, and 175 m at SRTM. The study found that using ALOS PALSAR data in the design of the proposed Pskom Reservoir for construction leads to a more accurate result. Comparing the DEMs data shows that there is more difference between the vertical accuracy; the horizontal accuracy level is almost the same. The results were obtained using ALOS PALSAR data in determining the storage volume (W=479368568 m3) and area (F=8.31 sq., km) of the water reservoir.

2 June 2021 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
KKKhojiakbar Khasanov
Khojiakbar Khasanov
KBKakhramon Babajanov
Kakhramon Babajanov
NBNodira Babajanova
Nodira Babajanova
The study of the reliability and safety of the constructed earth-fill dams and the comparison with their design and calculated data makes it possible to improve the structures and methods of the calculation substantiation of these structures. This work aims to study the filtration reliability and safety of the earth-fill dam of the Channel water reservoir of the Tuyamuyun hydroelectric complex (THC) on the Amu Darya River, which was put into exploitation in 1984. Field studies were carried out according to the traditional method using results of control and measuring equipment (CME) embedded in the body of the dam. The water levels of the upper and lower reaches, piezometers, and drainage water flow were measured. The maximum water levels upstream of 130.00 were observed in July-August and November 2017, and the minimum of 117.50 at the end of March. The water levels downstream depend on the value of the discharge through the hydrosystem. The maximum level downstream for 2017 was 112.55 m (01.06.2017) with a flow rate of 2000 m3/s. The minimum level downstream of 109.15 m was observed on November 29, 2017, when the discharge into the downstream through the hydroelectric complex was 260 m3/s. A tendency to an increase in the level of the bottom downstream was found. Filling and depletion graphs of the Channel water reservoir have been built, from which it is found that they reached 2.00 m/day, and 1.60 m/day, respectively. This is 4 and 1.6 times more than the standard 0.5 m/day and 1.0 m/day. Of the 53 piezometers, 34 are working conditions; the rest do not work, require flushing. Graphs of water level changes in piezometers show that they change with an average 15-20 day delay in the water level in the Channel water reservoir. In general, the natural depression curve is below the design one. The maximum filtration flow rate was 63.3 l/s at a water level in the upper pool of 129.00.

30 January 2023 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
OKOdiljon Kadirov
Odiljon Kadirov
KKKhojiakbar Khasanov
Khojiakbar Khasanov
The socio-economic development of the Tashkent region (Uzbekistan) depends largely on natural resources, especially water resources, as in other regions. One of the canals that supply water to the Tashkent province is the Tashkent magistral canal (TMC). In terms of size, the second of the canals receives water from the left bank of the Chirchik River. The TMC has been 82 years since its start of use. Hydrotechnical facilities on the TMC are typical of the II class. There are many hydrotechnical facilities on the canal: one main structure, four water dampening facilities, two destructive water discharges, four duckers in the canal, 45 water dischargers, one waterfall, seven under-canal duckers, two pipes under the canal, nine aqueducts, nine canal access, thirteen road bridges, one railway bridge, one pedestrian bridge. This article presents the technical condition of the TMC and its hydrotechnical facilities and recommendations developed based on the technical condition. On April 9-13, 2022, field observation work was carried out to study the technical condition of the TMC and hydrotechnical facilities. It reviewed the availability of technical documents of TMC facilities, instructions for their use, information on maintenance of mechanical equipment, working drawings, previous inspection reports, and other materials. In addition, the conclusions of the inspection carried out by the State Inspection "Davsuvkhujalikzorat" and the results of the technical inspections carried out by the employees of the TMC administration and project parameters of water facilities were studied.

30 January 2023 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
MBMasharif Bakiev
Masharif Bakiev
NBNodira Babajanova
Nodira Babajanova
KBKakhramon Babajanov
Kakhramon Babajanov
KKKhojiakbar Khasanov
Khojiakbar Khasanov
The purpose of the study was to analyze the foundation's filtration strength and the HPP building's shear stability after 38 years of operation as part of the Tuyamuyun hydroelectric complex on the Amudarya River. The analysis was carried out based on field data obtained with the help of 16 piezometers installed in two alignments within the block of the HPP building and vertical drainages in the grassland. The constructed graphs of water pressure fluctuations in piezometers coincide with the nature of the change in the water level in the upper and lower pools. The actual gradients did not exceed the allowable gradient for the shaly sand interlayer and limestone bedding fracture filler. Comparison of the maximum natural gradients and those calculated from model studies using electrohydrodynamic analogies. The stability of the HPP building block is estimated by the maximum piezometric pressure and compared with analytical calculations, and the safety factor is 2.303. In this way, the base's filtration strength and the structure's shear stability are ensured in the entire range of changes in the operating mode of the pressure front of the HPP building block.

30 January 2023 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
MBMasharif Bakiev
Masharif Bakiev
SDShakhnoza Djabbarova
Shakhnoza Djabbarova
KKKhojiakbar Khasanov
Khojiakbar Khasanov
The Republic of Uzbekistan pays great attention to the development and implementation of a program for the development of hydropower based on ensuring the share of hydropower in the energy potential and the integrated development of hydropower potential. Over the last three years, hydropower plants have been built or reconstructed in more than a dozen small and medium-sized earth dams to accomplish this task. Typically, unstable filtration is observed in the body of earth dams because of deviations from the normal filling and emptying of water reservoirs. The main goal of the research is to determine the time to lower the depression surface in the Tupalang earth dam transition zones, which characterizes the intensity of unstable filtration during a smooth and sudden drop in reservoir water level. The calculations were made according to the theoretical dependences of V.P.Nedriga for two cases of smooth and sudden lowering of the water level in the reservoir, starting from the normal backed level (NBL). In the calculations, the values of the main parameters were taken to be the coefficient of water loss of the soil (0.3), the coefficient of filtration of the transition zones (9.5 m/day), and the coefficient of laying the slope of the transition zones (0.2). Calculations showed that the time of lowering the depression surface in the transition zones with a gradual decrease in the water level in the reservoir was 84.1 days, and with an instantaneous decrease in the water level during the operation of a dam with a height of 120 m 3.86 days, and during the operation of a dam with a height of 185 m 6.82 days.