Equipment and workers are two important resources in the construction industry. Performance monitoring of these resources would help project managers improve the productivity rates of construction jobsites and discover potential performance issues. A typical construction workface monitoring system consists of four major levels: location tracking, activity recognition, activity tracking, and performance monitoring. These levels are employed to evaluate work sequences over time and also assess the workers’ and equipment’s well-being and abnormal edge cases. Results of an automated performance monitoring system could be used to employ preventive measures to minimize operating/repair costs and downtimes. The authors of this paper have studied the feasibility of implementing a wide range of technologies and computational techniques for automated activity recognition and tracking of construction equipment and workers. This paper provides a comprehensive review of these methods and techniques as well as describes their advantages, practical value, and limitations. Additionally, a multifaceted comparison between these methods is presented, and potential knowledge gaps and future research directions are discussed.
Manual material handling tasks have the potential to be highly unsafe from an ergonomic viewpoint. Safety inspections to monitor body postures can help mitigate ergonomic risks of material handling. However, the real effect of awkward muscle movements, strains, and excessive forces that may result in an injury may not be identified by external cues. This paper evaluates the ability of surface electromyogram (EMG)-based systems together with machine learning algorithms to automatically detect body movements that may harm muscles in material handling. The analysis utilized a lifting equation developed by the U.S. National Institute for Occupational Safety and Health (NIOSH). This equation determines a Recommended Weight Limit, which suggests the maximum acceptable weight that a healthy worker can lift and carry, as well as a Lifting Index value to assess the risk extent. Four different machine learning models, namely Decision Tree, Support Vector Machine, K-Nearest Neighbor, and Random Forest are developed to classify the risk assessments calculated based on the NIOSH lifting equation. The sensitivity of the models to various parameters is also evaluated to find the best performance using each algorithm. Results indicate that Decision Tree models have the potential to predict the risk level with close to 99.35% accuracy.
1 November 2016 in Journal of Computing in Civil Engineering
With the rapid advancement of sensing and computing technology and the wide adoption of mobile computing, the construction industry has faced a rise in the amount of information and data generated during the lifecycle of the construction project. To deal with a large variety of project data and information to support efficient and effective decision making, visualization, information modeling, and simulation (VIMS) has become critical in the development of capital facilities and infrastructures. The objective of this paper is to identify and investigate grand challenges in VIMS for the construction industry, to assist the academic and industry communities in establishing a future research agenda to solve VIMS challenges. In particular, 17 VIMS grand challenges were identified by an expert task force in the VIMS committee of the ASCE Computing and Information Technology Division, and then VIMS experts in the civil and construction areas from both academia and industry participated in a survey to assess the identified challenges, examine the relative importance of the identified challenges, and investigate current practices and future directions of VIMS. The survey results indicate that several knowledge gaps regarding VIMS challenges between academia and industry still exist, and it is the contention of this research that these particular gaps need to be addressed in future research. These research directions apply to technical issues and sociological/cultural/organizational issues in VIMS challenges. The major contribution of this paper is its claim that the provision of shared views on VIMS challenges lays a firm foundation in which collaborative actions between academia and industry can take place, which will, in turn, advance VIMS for the construction industry. By incorporating the whole project lifecycle, not only project execution but also planning, operation, and maintenance, the analysis provides meaningful hints for VIMS challenges in architecture, engineering, and facility management industries.