Federica Migliaccio

Prof. Federica Migliaccio

orcid

Research Focus & Metrics

Academic Career Length

40Years (1987-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 October 2011 in Journal of Geodesy
Verified
Journal Article
Closed access
PDF file
RPRoland Pail
Roland Pail
SBSean Bruinsma
Sean Bruinsma
FMFederica Migliaccio
Federica Migliaccio
CFChristoph Förste
Christoph Förste
HGHelmut Goiginger
Helmut Goiginger
CTCarl Christian Tscherning
Carl Christian Tscherning

28 August 2019 in Surveys in Geophysics
Verified
Journal Article
Closed access
PDF file
FMFederica Migliaccio
Federica Migliaccio
Mirko ReguzzoniMirko Reguzzoni
Mirko Reguzzoni
KBKhulan Batsukh
Khulan Batsukh
GTGuglielmo Maria Tino
Guglielmo Maria Tino
GRGabriele Rosi
Gabriele Rosi
SZSimona Zoffoli
Simona Zoffoli

1 May 2002 in Celestial Mechanics and Dynamical Astronomy
Verified
Journal Article
Closed access
PDF file
AAAlberta Albertella
Alberta Albertella
FMFederica Migliaccio
Federica Migliaccio
FSFernando Sansó
Fernando Sansó

6 November 2004 in Journal of Geodesy
Verified
Journal Article
Closed access
PDF file
FMFederica Migliaccio
Federica Migliaccio
Mirko ReguzzoniMirko Reguzzoni
Mirko Reguzzoni
FSF. Sansò
F. Sansò

27 June 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CARLO DE GAETANICARLO DE GAETANI
CARLO DE GAETANI
MMMertkan MERT
Mertkan MERT
FMFederica Migliaccio
Federica Migliaccio
It is incontrovertible that an exchange of files is essentially required at several stages of the workflow in the architecture, engineering, and construction (AEC) industry. Therefore, investigating and detecting the capabilities/inabilities of building information modeling (BIM) software packages with respect to interoperability can be informative to stakeholders who exchange data between various BIM packages. The work presented in this paper includes a discussion on the interoperability of different software platforms commonly used in the AEC industry. Although, in theory, flawless interoperability of some types of files between different BIM platforms is ensured, in practical applications, this is not always the case. Hence, this research aims to identify faults in data exchange by assessing different possible scenarios where a sample Industry Foundation Classes (IFC) four-dimensions (4D) BIM model and related Gantt charts are exchanged. Throughout the interoperability analysis of both IFC file and Gantt charts, the following checks were carried out: geometrical and nongeometrical information exchange through IFC files, 4D information correct readability, and presence of missing schedule information in Gantt charts after their import/export procedure. The results show that interoperability between the analyzed platforms is not always ensured, providing useful insight into realistic scenarios.

23 September 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MMMehrdad Mirshokraei
Mehrdad Mirshokraei
CARLO DE GAETANICARLO DE GAETANI
CARLO DE GAETANI
FMFederica Migliaccio
Federica Migliaccio
This paper investigates quality management (QM) during the execution phase of structural elements by proposing, developing, and testing a complete framework by integrating building information modeling (BIM) and augmented reality (AR) technology. QM during execution is boosted by BIM–AR integration through a dedicated web-based system aimed at reducing the occurrence of omissions and negligence. With such a system, efficiency is improved by allowing the entering of inspection data directly in a shared digital environment, where people involved in QM have permanent access to updated information and inspection results, clearly organized, and entered in real time. The system has been developed in the asp.net framework using C# language where, by generating a web-based checklist and establishing its link to AR, it can enhance the process of information extraction from industry foundation class (IFC) 4D BIM models and the recording of inspection data. A test has been performed on a real case study in Budapest, to assess the effectiveness of the system in the field. Results demonstrate the following benefits brought by such a type of QM system: improved understanding of the design, access to information, and overview of the quality status of the project, leading to reductions in defects and reworking, as well as improved and quicker response and decision-making.