Bao Qian

Dr. Bao Qian


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 October 2020 in Stochastic Environmental Research and Risk Assessment
Verified
Journal Article
Closed access
PDF file
FHFeng Huang
Feng Huang
Carlos OchoaCarlos Ochoa
Carlos Ochoa
LGLidan Guo
Lidan Guo
YWYao Wu
Yao Wu
BQBao Qian
Bao Qian

10 February 2017 in Entropy
Verified
Journal Article
Open access
PDF file
FHFeng Huang
Feng Huang
XCXunzhou Chunyu
Xunzhou Chunyu
YWYuankun Wang
Yuankun Wang
YWYao Wu
Yao Wu
BQBao Qian
Bao Qian
ZXZiqiang Xia
Ziqiang Xia
The streamflow and water level complexity of the Poyang Lake basin has been investigated over multiple time-scales using daily observations of the water level and streamflow spanning from 1954 through 2013. The composite multiscale sample entropy was applied to measure the complexity and the Mann-Kendall algorithm was applied to detect the temporal changes in the complexity. The results show that the streamflow and water level complexity increases as the time-scale increases. The sample entropy of the streamflow increases when the timescale increases from a daily to a seasonal scale, also the sample entropy of the water level increases when the time-scale increases from a daily to a monthly scale. The water outflows of Poyang Lake, which is impacted mainly by the inflow processes, lake regulation, and the streamflow processes of the Yangtze River, is more complex than the water inflows. The streamflow and water level complexity over most of the time-scales, between the daily and monthly scales, is dominated by the increasing trend. This indicates the enhanced randomness, disorderliness, and irregularity of the streamflows and water levels. This investigation can help provide a better understanding to the hydrological features of large freshwater lakes. Ongoing research will be made to analyze and understand the mechanisms of the streamflow and water level complexity changes within the context of climate change and anthropogenic activities.

30 September 2025 in Water
Verified
Journal Article
Open access
PDF file
HYHaitao Yan
Haitao Yan
BWBaocheng Wang
Baocheng Wang
KZKaikai Zheng
Kaikai Zheng
CPChulan Peng
Chulan Peng
JYJinbo Yan
Jinbo Yan
BQBao Qian
Bao Qian
The Three Gorges Reservoir, serving as a crucial ecological barrier for the middle-lower Yangtze River basin, faces substantial threats to watershed ecosystems from sediment-associated heavy metal, threatening aquatic ecosystems and human health via bioaccumulation. Leveraging the legislative framework of the Yangtze River Protection Law, this study analyzed sediment cores (0–65 cm) collected from 12 representative sites in the Three Gorges Reservoir using 2020 Air–Space–Ground integrated monitoring data from the Changjiang Water Resources Commission. Concentrations of nine heavy metals (Cd, Cu, Pb, Fe, Mn, Cr, As, Hg, and Zn) were quantified to characterize spatial and vertical distribution patterns. Source apportionment was conducted through correlation analysis and principal component analysis (PCA). Contamination severity and ecological risks were assessed via geo-accumulation index (Igeo), potential ecological risk index (RI), and acute toxicity metrics. The findings indicated substantial spatial heterogeneity in sediment heavy-metal concentrations, with the coefficients of variation (CV) for Hg and Cd reaching 214.46% and 116.76%, respectively. Cu and Pb showed surface enrichment, while Cd exhibited distinct vertical accumulation. Source apportionment indicated geogenic dominance for most metals, with anthropogenic contributions specifically linked to Cd and Hg enrichment. Among the metals assessed, Cd emerged as the primary ecological risk driver, with localized strong risk levels (Ei > 320), particularly at FP and SS sites. These findings establish a scientific foundation for precision pollution control and ecological restoration strategies targeting reservoir sediments.

16 September 2020 in Proceedings of IAHS
Verified
Journal Article
Open access
PDF file
BQBao Qian
Bao Qian
XXXiao Xiao
Xiao Xiao
HWHefan Wang
Hefan Wang
JWJincheng Wang
Jincheng Wang
In the middle and lower reaches of the Hanjiang River in February 2018, another serious diatom bloom occurred. The Changjiang Water Resources Commission promptly initiated an emergency plan to use the cascade reservoirs at the middle and lower reaches of the Hanjiang River to carry out water scheduling. At the same time, six monitoring sections were set up to daily monitor in the middle and lower reaches of the Hanjiang River. From 9 February to 18 March, this bloom had lasted more than 30 d. It is the longest since the record was recorded. The emergency dispatch measures adopted during the outbreak of the diatom bloom have stopped the further development of diatom bloom and played a good role. Analysing the causes of diatom bloom can provide a more comprehensive basis for further optimizing emergency dispatch. This paper analyzes the key hydrological factors that occur in this diatom bloom and proposes a water dispatching optimization plan and specific countermeasures. However, to permanently solve the diatom bloom problem, it is necessary for local environmental protection departments to work actively under the current requirements of the river chief system. Comprehensive protection of the Hanjiang River water ecological environment, completely solve the watershed problem of non-point source pollution.

16 September 2020 in Proceedings of IAHS
Verified
Journal Article
Open access
PDF file
XXXiao Xiao
Xiao Xiao
BMBeiping Mao
Beiping Mao
BQBao Qian
Bao Qian
The 2017 Hanjiang autumn flood appeared to have higher surface water levels at the same discharge rate than previously at the Huangzhuang gauging station. It is seriously impacted the flood control. This paper analyses the 2000–2017 data from the Huangzhuang reach in the Hanjiang River, including surface water levels, the surface water fall, erosion-deposition variation and the engineering activities. A comparison of the 2016–2017 data with the 2000–2015 data in the Huangzhuang reach, revealed that the surface water levels were about 1.47 and 0.13 m higher in the high and intermediate discharge ranges, respectively. In the low discharge range, the 2016–2017 and 2010–2015 surface water levels were similar. However, a comparison of the 2016–2017 with the 2000–2009 data in the low discharge range, shows that the surface water levels were 0.28–0.4 m lower. The surface water fall in the Zhuandouwan–Huangzhuang's reach decreased in 2016–2017 for discharges above 5000 m3 s−1, whereas in the Huangzhuang–Datong reach the opposite was found. For other time periods and discharge ranges the fall decreased. In the Datong-Shayang reach the fall reduced in 2014–2015 relative to other periods in 2000–2017 in the discharge range above 5000 m3 s−1. The erosion-silting analysis for the Huangzhuang reach showed scouring of local river deposits due to bridge engineering. However, near the bridge the substantial silting was found. The collated surface water level and scouring-silting data suggest that reduced surface water levels during low discharge are mainly due to the overall river erosion. The increased surface levels in the high discharge range are due to local river siltation, especially because of the increased water resistance as response to bridge engineering.