Xiaofeng Zhao

Xiaofeng Zhao


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 April 2019 in Processes
Verified
Journal Article
Open access
PDF file
XZXiaofeng Zhao
Xiaofeng Zhao
YWYanyan Wang
Yanyan Wang
YWYunge Wang
Yunge Wang
KHKe Huang
Ke Huang
Shuttle-based storage and retrieval systems (SBS/RSs), a new type of “part-to-picker” system, have attracted public attention because of their flexibility and robustness. The systems consist of two sub-systems—shuttles and lifts—which are responsible for horizontal movements and vertical movements, respectively. SBS/RSs are categorized into tier-to-tier shuttles and tier-captive shuttles. This paper mainly researches SBS/RSs with tier-to-tier shuttles. New challenges have emerged since the commercial simulation-based optimization software has become widely applied for, for instance, task scheduling problems. Specifically, to decrease the idle time of lifts and the waiting time of shuttles, an integer programming scheduling model is proposed to minimize total task time with constraints on orders and devices. The Gurobi linear programming solver was utilized to obtain the optimal order sequence and the shortest operation time. The overall system efficiency was improved using our model. Moreover, the results are significant for reducing capital investment and operating cost.

7 January 2020 in Processes
Verified
Journal Article
Open access
PDF file
YWYanyan Wang
Yanyan Wang
RMRongjun Man
Rongjun Man
XZXiaofeng Zhao
Xiaofeng Zhao
HLHui Liu
Hui Liu
The autonomous shuttle and stacker crane (AC/SC) warehousing system, as a new automated deep-lane unit load storage/retrieval system, has been becoming more popular, especially for batch order fulfilment because of its high flexibility, low operational cost and improved storage capacity. This system consists of a shuttle sub-system that controls motion along the x-axis and a stacker crane sub-system that controls motion along the y-axis and z-axis. The combination of shuttles and a stacker crane performs storage and retrieval tasks. Modelling the parallel motion is an important design tool that can be used to calculate the optimal number of shuttles for a given configuration of the warehousing system. In this study, shuttle movements from one lane to another are inserted into the stock-keeping unit (SKU) task queue, and convert such that they are consistent with the retrieval tasks. The tasks are then grouped according to their starting lane, and converted to an assembly-line parallel job problem by analysing the operating mode with the objectives of minimising the total working time of the stacker crane and the wasted shuttle time. A time sequence mathematical model based on the motion of the shuttles and stacker crane is proposed, and an improved Pareto-optimal elitist non-dominated sorting genetic algorithm is used to solve this multi-objective optimization problem. The model is validated via a simulation study, and via a real-world warehousing case study. We go on to describe guidelines for the layout and configuration of AS/SC warehousing systems, including the optimal number of shuttles and number of x-axis storage cells of lanes, which can improve efficiency and minimise both capital investment and operating costs.

26 December 2017 in Cluster Computing
Verified
Journal Article
Closed access
PDF file
DLDebao Liu
Debao Liu
XZXiaofeng Zhao
Xiaofeng Zhao
YWYanyan Wang
Yanyan Wang