Risk and uncertainty analysis by mathematical and statistical methods is often used to assess systematic risks and uncertainties. This research presents the procedure and application of risk and reliability analysis to dam overtopping. Annual maximum series of peak discharges of Feitsui Reservoir in northern Taiwan are used to analyze five extreme flood events with different frequencies. The highest water levels of the five extreme flood events were computed by using reservoir routing and considering seven factors subject to uncertainty. Afterward, the overtopping risk of Feitsui Dam was assessed by five uncertainty analysis methods: Rosenblueth’s point estimation method (RPEM), Harr’s point estimation method (HPEM), Monte Carlo simulation, Latin hypercube sampling, and the mean-value first-order second-moment (MFOSM) method. The results show that values of overtopping risk computed by different methods are similar. One may apply some approximated methods (MFOSM, HPEM and RPEM) to avoid the computational ...
Since the patterns of residential buildings in the urban area are small-sized and dispersed, this study proposes a high-resolution flood loss and risk assessment model to analyze the direct loss and risk impacts caused by floods. The flood inundation simulation with a fine digital elevation model (DEM) provides detailed estimations of flood-inundated areas and their corresponding inundation depths during the 2016 Typhoon Megi and 2017 Typhoon Haitang. The flood loss assessment identifies the impacts of both events on residential areas. The depth-damage table from surveys in the impacted area was applied. Results indicated that the flood simulation with the depth-damage table is an effective way to assess the direct loss of a flood disaster. The study also showed the effects of spatial resolution on the residential loss. The results indicated that the low-resolution model easily caused the estimated error of loss in dispersed residential areas when compared with the high-resolution model. The analytic hierarchy process (AHP), as a multi-criteria decision-making method, was used to identify the weight factor for each vulnerability factor. The flood-vulnerable area was mapped using natural and social vulnerability factors, such as high-resolution DEM, distance to river, distance to fire station, and population density. Eventually, the flood risk map was derived from the vulnerability and flood hazard maps to present the risk level of the flood disaster in the residential areas.
17 September 2010 in Stochastic Environmental Research and Risk Assessment
The mean-value first-order second-moment (MFOSM) method is the main method for estimating the reliability of slopes in practice. It is well recognized that the method occasionally underestimates the probability of failure for inhomogeneous soil slopes, but there is as of yet no commonly accepted procedure to identify this problem. This study presents a solution by projecting MFOSM results to obtain an equivalent most probable failure point in the material space as defined by Hasofer and Lind. A stability analysis using this material point then provides a check for the validity of the MFOSM solution. If the resulting critical factor of safety is one, the MFOSM results are valid; whereas, if a factor of safety of less than one is obtained, the reliability index is overestimated and the failure probability underestimated.
This study proposed a two-phase risk analysis scheme for flood management considering flood inundation losses, including: (1) simplified qualitative-based risk analysis incorporating the principles of failure mode and effect analysis (FMEA) to identify all potential failure modes associated with candidate flood control measures, to formulate a remedial action plan aiming for mitigating the inundation risk within an engineering system; and (2) detailed quantitative-based risk analysis to employ numerical models to specify the consequences including flood extent and resulting losses. Conventional qualitative-based risk analysis methods have shown to be time-efficient but without quantitative information for decision making. However, quantitative-based risk analysis methods have shown to be time- and cost- consuming for a full spectrum investigation. The proposed scheme takes the advantages of both qualitative-based and quantitative-based approaches of time-efficient, cost-saving, objective and quantitative features for better flood management in term of expected loss. The proposed scheme was applied to evaluate the Chiang-Yuan Drainage system located on Lin-Bien River in southern Taiwan, as a case study. The remedial action plan given by the proposed scheme has shown to greatly reduce the inundation area in both highlands and lowlands. These measures was investigated to reduce the water volume in the inundation area by 0.2 million cubic meters, even in the scenario that the flood recurrence interval exceeded the normal (10-year) design standard. Our results showed that the high downstream water stage in the downstream boundary may increase the inundation area both in downstream and upstream and along the original drainage channel in the vicinity of the diversion. The selected measures given by the proposed scheme have shown to substantially reduce the flood risk and resulting loss, taking account of various scenarios: short duration precipitation, decreased channel conveyance, pump station failure and so forth.