Guido Guizzi

Dr. Guido Guizzi

Dipartimento di Ingegneria chimica, dei Materiali e della Produzione industriale, Università degli Studi di Napoli Federico II, 80138 Napoli, Italy
orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Giovanni ImprotaGiovanni Improta
Giovanni Improta
Guido GuizziGuido Guizzi
Guido Guizzi
Carlo RicciardiCarlo Ricciardi
Carlo Ricciardi
VGVincenzo Giordano
Vincenzo Giordano
Alfonso Maria PonsiglioneAlfonso Maria Ponsiglione
Alfonso Maria Ponsiglione
MTMaria Triassi
Maria Triassi
Healthcare is one of the most complex systems to manage. In recent years, the control of processes and the modelling of public administrations have been considered some of the main areas of interest in management. In particular, one of the most problematic issues is the management of waiting lists and the consequent absenteeism of patients. Patient no-shows imply a loss of time and resources, and in this paper, the strategy of overbooking is analysed as a solution. Here, a real waiting list process is simulated with discrete event simulation (DES) software, and the activities performed by hospital staff are reproduced. The methodology employed combines agile manufacturing and Six Sigma, focusing on a paediatric public hospital pavilion. Different scenarios show that the overbooking strategy is effective in ensuring fairness of access to services. Indeed, all patients respect the times dictated by the waiting list, without “favouritism”, which is guaranteed by the logic of replacement. In a comparison between a real sample of bookings and a simulated sample designed to improve no-shows, no statistically significant difference is found. This model will allow health managers to provide patients with faster service and to better manage their resources.

7 August 2020 in International Journal of Production Research
Verified
Journal Article
Closed access
AGAndrea Grassi
Andrea Grassi
Guido GuizziGuido Guizzi
Guido Guizzi
LSLiberatina Carmela Santillo
Liberatina Carmela Santillo
Silvestro VespoliSilvestro Vespoli
Silvestro Vespoli
The increasing globalisation process has led to a radical change in the production concept, moving from a mass production paradigm towards one of mass customisation (MC), and focusing on value creation by pursuing customers’ needs and increasing responsiveness. The rapid development of information technologies has also made it possible to create new manufacturing paradigms, such as Industry 4.0 and cloud manufacturing, in which the increased level of autonomy is one of the key concepts for tackling new market challenges. This paper proposes a decentralised scheduling approach that improves the performance of production systems while minimising the usually high work-in-progress (WIP) requirements of the classic centralised scheduling and inventory production control system. Using a semi-heterarchical Manufacturing Planning and Control (MPC) architecture and integrating the Industry 4.0 innovation in a cloud manufacturing environment, this work contributes to the design of the lower level of the MPC architecture. The resulting production controller can allocate jobs following different dispatching rules dynamically. The performances of the proposed approach were assessed for different production scenarios and control parameter settings through an exhaustive experimental campaign based on hybrid simulation tools. The results showed that the proposed low-level controller led to a productivity increase while delivering increased responsiveness.

1 January 2012
Verified
Book Chapter
Closed access
PDF file
Giovanni ImprotaGiovanni Improta
Giovanni Improta
MTMaria Triassi
Maria Triassi
Guido GuizziGuido Guizzi
Guido Guizzi
LSLiberatina Carmela Santillo
Liberatina Carmela Santillo
Roberto RevetriaRoberto Revetria
Roberto Revetria
LCLucia Cassettari
Lucia Cassettari

1 November 2019 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
Guido GuizziGuido Guizzi
Guido Guizzi
DFDomenico Falcone
Domenico Falcone
FFFabio De Felice
Fabio De Felice

Verified
Journal Article
Open access
PDF file
GCGiuseppe Converso
Giuseppe Converso
Guido GuizziGuido Guizzi
Guido Guizzi
ESEmma Salatiello
Emma Salatiello
Silvestro VespoliSilvestro Vespoli
Silvestro Vespoli
This study explores the application of Lean principles in the service sector, addressing the complexities of translating manufacturing-focused methodologies to intangible service activities. Lean Services, a relatively recent concept, lacks a standardised definition, leading to varied interpretations ranging from customer-centric approaches to waste reduction strategies. Through a comprehensive literature review and a case study of a European scooter and motorcycle manufacturer, this research identifies a consolidated list of service-specific wastes, bridging a critical gap in Lean Services research. Additionally, the study compares two prominent methodologies—DMAIC (Define–Measure–Analyse–Improve–Control) from Six Sigma and the Cost Deployment pillar from World Class Manufacturing (WCM)—in the context of Lean Services. The analysis highlights DMAIC’s strength in advanced statistical tools and targeted problem-solving, contrasting with WCM’s systemic approach, emphasising economic feasibility and broader resource integration. By examining their individual and combined applicability, this research provides actionable insights for selecting methodologies based on specific objectives, time constraints, and resources. This work contributes to the evolving understanding of Lean Services, offering a framework for practitioners to enhance efficiency and drive continuous improvement in service-based processes.

12 September 2023 in Energies
Verified
Journal Article
Open access
PDF file
Maria Grazia MarchesanoMaria Grazia Marchesano
Maria Grazia Marchesano
Guido GuizziGuido Guizzi
Guido Guizzi
Silvestro VespoliSilvestro Vespoli
Silvestro Vespoli
Gabriella FerruzziGabriella Ferruzzi
Gabriella Ferruzzi
The integration of Battery Swapping Stations (BSSs) into smart microgrids presents an opportunity to optimize energy generation, storage, and consumption. However, there exists a gap in the literature regarding the detailed analysis of the profitability of integrating a BSS within a smart microgrid, particularly utilizing second-life batteries for storage and renewable energy sources for generation. This study aims to address this gap by employing a multi-method simulation approach to thoroughly investigate the economic viability of such integration. The simulation model developed for this study is a digital twin of the microgrid, incorporating components such as the BSS, renewable energy sources (wind and photovoltaic), second-life battery storage, and utilities. By optimizing energy flows within this model, considering the cost-effectiveness of diverse generation sources and prioritizing the utilization of renewable energy, we aim to provide a comprehensive assessment of the economic benefits. Furthermore, the simulation takes into account crucial factors including battery swapping operations, warehouse management, and battery charging scheduling. The profitability analysis undertaken in this study is grounded in the objective of minimizing total costs while effectively meeting the energy demands of residential loads. Ultimately, the integration of the BSS into the smart microgrid not only targets economic efficiency but also strives to maximize the utilization of second-life batteries, contributing to the concept of a circular economy.