Battery Energy Storage System (BESS) can be utilized to shave the peak load in power systems and thus defer the need to upgrade the power grid. Based on a rolling load forecasting method, along with the peak load reduction requirements in reality, at the planning level, we propose a BESS capacity planning model for peak and load shaving problem. At the operational level, we consider the optimal control policy towards charging and discharging power with two different optimization objectives: one is to diminish the difference between the peak load and the valley load, the other is to minimize the daily load variance. Particularly, the constraint of charging and discharging cycles, which is an important issue in practice, is taken into consideration. Finally, based on real load data, we provide simulation results that validate the proposed optimization models and control strategies.
Intermittent renewable energy resources like wind and solar introduce uncertainty across multiple time scales, from minutes to years, on the design and operation of power systems. Energy system optimization models have been developed to find the least-cost solution that manages the multi-timescale variability using an optimal portfolio of flexible resources. However, input data that capture such multi-timescale uncertainty are characterized with a long time horizon and high resolution, which brings great difficulty to solving the optimization model. Here we propose a model-adaptive time aggregation method based on clustering to alleviate the computational complexity, in which the energy system is solved over selected representative time periods instead of the full time horizon. The proposed clustering method is adaptive to various energy system optimization models or settings, because it extracts features from the optimization models to inform the clustering process. Results show that the proposed adaptive method can significantly lower the error in approximating the solution of the optimization model with the full time horizon, compared to traditional time aggregation methods.
Smart grid is a typical application of industrial cyber-physical systems (ICPS) in the electric power industry. Due to the exposure to different kinds of uncertainties and unpredictable faults, how to reliably assess the short-term voltage stability (SVS) of smart grids to prevent the occurrence of large-scale blackouts is still of primary concern. To tackle this challenging problem, this article develops a novel machine learning scheme to achieve accurate and interpretable online SVS assessment in two steps. First, it utilizes time-series shapelet transform to extract key dynamics and convert the postfault time series into flat features. Second, it designs a graph convolutional network (GCN) to incorporate these features with topology information for SVS assessment. The GCN explores the spatial-temporal dynamics of power system via graph convolution and introduces a system layer to derive the final assessment result. Compared with conventional methods, this novel scheme makes full use of the spatial-temporal information in SVS dynamics, resulting in higher assessment accuracy and stronger adaptability. Besides, it is capable of discovering certain valuable underlying rules and patterns related to SVS. Test results on the IEEE 39-bus system and real-world Guangdong Power Grid in South China verify the effectiveness of the proposed scheme.
5 November 2021 in IEEE Transactions on Neural Networks and Learning Systems
We introduce an innovative solution approach to the challenging dynamic load-shedding problem which directly affects the stability of large power grid. Our proposed deep Q-network for load-shedding (DQN-LS) determines optimal load-shedding strategy to maintain power system stability by taking into account both spatial and temporal information of a dynamically operating power system, using a convolutional long-short-term memory (ConvLSTM) network to automatically capture dynamic features that are translation-invariant in short-term voltage instability, and by introducing a new design of the reward function. The overall goal for the proposed DQN-LS is to provide real-time, fast, and accurate load-shedding decisions to increase the quality and probability of voltage recovery. To demonstrate the efficacy of our proposed approach and its scalability to large-scale, complex dynamic problems, we utilize the China Southern Grid (CSG) to obtain our test results, which clearly show superior voltage recovery performance by employing the proposed DQN-LS under different and uncertain power system fault conditions. What we have developed and demonstrated in this study, in terms of the scale of the problem, the load-shedding performance obtained, and the DQN-LS approach, have not been demonstrated previously.