Yangkyun Kim

Dr. Yangkyun Kim

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2019 in Automation in Construction
Verified
Journal Article
Closed access
YKYangkyun Kim
Yangkyun Kim
ABAmund Bruland
Amund Bruland

14 February 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YKYangkyun Kim
Yangkyun Kim
SLSean Seungwon Lee
Sean Seungwon Lee
Subsidence at abandoned mines sometimes causes destruction of local areas and casualties. This paper proposes a mine subsidence risk index and establishes a subsidence risk grade based on two separate analyses of A and B to predict the occurrence of subsidence at an abandoned mine. For the analyses, 227 locations were ultimately selected at 15 abandoned coal mines and 22 abandoned mines of other types (i.e., gold, silver, and metal mines). Analysis A predicts whether subsidence is likely using an artificial neural network. Analysis B assesses a mine subsidence risk index that indicates the extent of risk of subsidence. Results of both analyses are utilized to assign a subsidence risk grade to each ground location investigated. To check the model’s reliability, a new dataset of 22 locations was selected from five other abandoned mines; the subsidence risk grade results were compared with those of the actual ground conditions. The resulting correct prediction percentage for 13 subsidence locations of the abandoned mines was 83–86%. To improve reliability of the subsidence risk, much more subsidence data with greater variations in ground conditions is required, and various types of analyses by numerical and empirical approaches, etc. need to be combined.

28 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YKYangkyun Kim
Yangkyun Kim
SLSean Seungwon Lee
Sean Seungwon Lee
This paper analyses the construction time and advance rate of a 3 km long drill and blast tunnel under various geological conditions using an upgraded NTNU drill and blast prediction model. The analysis was carried out for the five types of Korean tunnel supports according to the rock mass quality (from Type 1, meaning a very good rock mass quality; to Type 5, meaning a very poor rock mass quality). Four kinds of rock properties, as well as the rock mass quality, for each tunnel support type were applied to simulate different geological conditions based on previous studies and the NTNU model. The construction time was classified into five categories: basic, standard, gross, tunnel and total, according to the operation characteristics to more effectively analyse the time. In addition, to consider the actual geological conditions in tunnelling, the construction times for the three mixed geological cases were analysed. It was found that total construction time of a tunnel covering all the operations and site preparations with a very poor rock mass quality was more than twice that of a tunnel with a very good rock mass quality for the same tunnel length. It is thought that this study can be a useful approach to estimating the construction time and advance rate in the planning or design stage of a drill and blast tunnel.

31 March 2015 in Journal of the Korean society for quality management
Verified
Journal Article
Open access
PDF file
JKJune-Duk Kwon
June-Duk Kwon
CYChiho Yoon
Chiho Yoon
HOHyun-Jong Oh
Hyun-Jong Oh
BPBeom-Gyu Park
Beom-Gyu Park
YKYangkyun Kim
Yangkyun Kim
Purpose: The purpose of this study is to lay groundwork for future research on the outcomes of national quality awards for secondary-care healthcare organizations.Methods: For this study, a secondary-care hospital was selected through a convenience sampling method and all of its organizational members participated in complete enumeration survey using 109 survey questions derived from the MBNQA criteria for healthcare through structural equation modeling (SEM) Results: As a result, Leadership was shown to drive Foundation and Direction, which affect System that creates Results with 12 hypotheses supported out of 18 hypotheses established.Conclusion: The findings of this study will provide valuable implications to the top management of secondary-care hospitals for self-examining quality management and promoting sustainable competitiveness