Tewodros Gera Workineh

Mr. Tewodros Gera Workineh


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Cogent Engineering
Verified
Journal Article
Open access
TWTewodros Gera Workineh
Tewodros Gera Workineh
BTBiniyam Zemene Taye
Biniyam Zemene Taye
ANAbraham Nebey
Abraham Nebey
EGElias Mandefro Getie
Elias Mandefro Getie
For off-grid, standalone solar-fed water pumping has become a very viable option for small householder farmers. Appropriate configuration and control to suit this specific application are required. Buck, boost, and buck-boost converters are used to ensure impedance adaption between the solar PV generation and the load. However, these converters have switching harmonic problems. This problem is solved by the use of a single-ended primary inductor converter. Thus, a single-ended primary inductor converter is designed to overcome these drawbacks. Therefore, the objective of this paper is to design a single-ended primary inductive converter with a PI-like fuzzy controller. In this paper, synchronous SEPIC converter with PI-like fuzzy controller for PV-fed pumping system is modeled and designed. The system performance at different input conditions is evaluated. PI and PI-like fuzzy controllers have been compared using MATLAB/SIMULINK. PI-type fuzzy controller is less sensitive to input parameters variation than PI due to auto-tuning capability. Less than 2% output variation is recorded between 200 and 1000 W/m2 irradiance. This show that output voltage is less sensitive to the input solar radiation with this SEPIC converter control. The steady-state result obtained in speed and flow rate were 141.4 rpm and 1.56 l/s, respectively, and the voltage error was 1.4 V. Thus, PI-like fuzzy controller was used to reduce the steady-state error. The results obtained with PI-like fuzzy controller in speed and flow rate were 143.6 rpm and 1.624 l/s at 6 m head, respectively. The voltage error is 0.2 V which is less than the PI converter error (1.4 V).

20 July 2026 in Scientific Reports
Verified
Journal Article
Open access
PDF file
TWTewodros Gera Workineh
Tewodros Gera Workineh
GWGetachew Biru Worku
Getachew Biru Worku
TZTassew Tadiwos Zewdie
Tassew Tadiwos Zewdie
Many rural communities in Ethiopia’s Amhara region lack electricity access despite substantial urban-rural disparities. Traditional surveys are costly and inconsistent, while Nighttime Light (NTL)-population threshold methods suffer from arbitrary thresholds, off-grid detection failures, and light-access conflation. This study develops a geospatial machine learning framework using Visible Infrared Imaging Radiometer Suite—Day/Night Band (VIIRS-DNB) nighttime lights, population density, and distances to grid lines and roads. Random Forest (RF) outperforms Support Vector Machine (SVM) and Decision Tree (DT), achieving 86.8% overall accuracy and a 71.3% Kappa coefficient for operational mapping of electrification status and estimation of regional electrification rates from 2018 to 2024. Validation against GPS-recorded transformer locations demonstrates that the Random Forest model reconstructs a realistic, corridor-type electrified network and outperforms a calibrated NTL–population threshold approach, which tends to miss grid-connected rural corridors and overestimate urban brightness effects. The resulting maps reveal zone-level disparities and steady growth to 41% electrification by 2024, with population density (27.49% importance) emerging as the leading predictor among balanced variables. This framework supports SDG 7 planning and investment prioritization in underserved areas.

17 November 2026 in Discover Applied Sciences
Verified
Journal Article
Open access
PDF file
TWTewodros Gera Workineh
Tewodros Gera Workineh
GWGetachew Biru Worku
Getachew Biru Worku
TYTefera Terefe Yetayew
Tefera Terefe Yetayew
FSFekadu Shewarega
Fekadu Shewarega
TZTassew Tadiwos Zewdie
Tassew Tadiwos Zewdie
Floating photovoltaic (FPV) systems present a strategic alternative to land-based PV installations that faces land scarcity, land-use conflicts and rapid electrification needs. This study develops an integrated geospatial framework that combines machine learning-based water body extraction and fuzzy GIS-based multi-criteria decision-making (MCDM) to perform a first-order techno-spatial suitability screening of floating PV locations and estimates the theoretical installed capacity of floating PV systems over verified water bodies in Amhara Region. Furthermore, FPV potential estimates were constrained using FAHP suitability analysis and bathymetric screening to provide more realistic deployment scenarios for the Amhara Region of Ethiopia. Water bodies were delineated automatically using a Random Forest (RF) classifier applied to Sentinel-2 satellite imagery on Google Earth Engine. Subsequently, a Fuzzy Analytical Hierarchy Process (FAHP) was implemented to rank candidate reservoirs using eight techno-economic and socio-environmental criteria such as Global Horizontal Irradiance (GHI), elevation, slope, proximity to transmission lines, proximity to roads, settlement distance, wind speed, and temperature. Sensitivity analysis across 10 perturbation scenarios confirmed model robustness, maintaining CR < 0.1 with 9/10 scenarios showing 100% rank stability. Results for water detection demonstrated that the random forest classifier identified 21 water bodies with OA of 0.904, recall of 0.917, F1-score of 0.906, precision of 0.894 and a Cohen’s kappa coefficient of 0.78. The framework also produced suitability maps for identified priority reservoirs for FPV development based on detected water bodies. Further this work also quantified the installed capacity potential of suitable sites using temperature-adjusted capacity estimates. The combined results showed that the total usable FPV potential in Amhara’s water bodies lies almost entirely within locations classified as suitable, with approximately 822.5 GW (96.88%) and an additional 7 GW (0.82%) in the “Most Suitable” patches, while only about 2.3% of the water-surface pixels are excluded as unsuitable. Under bathymetric constraints, the bathymetry-screened installed capacity potential of suitable pixels reaches 304.33 GW, with the most suitable patches estimated at 2.59 GW. The paper demonstrated that integrating machine learning with GIS-FAHP delivers a high-resolution FPV planning tool capable of supporting strategic renewable-energy expansion in Ethiopia’s grid-level planning decisions.

10 May 2026 in Scientific Reports
Verified
Journal Article
Open access
PDF file
TWTewodros Gera Workineh
Tewodros Gera Workineh
GWGetachew Biru Worku
Getachew Biru Worku
SSSharad Kumar Singh
Sharad Kumar Singh
LDLokesh Kumar Dewangan
Lokesh Kumar Dewangan
HMHabtamu Asresahagn Mebrat
Habtamu Asresahagn Mebrat
TZTassew Tadiwos Zewdie
Tassew Tadiwos Zewdie
Wind energy site selection requires robust frameworks that simultaneously address expert uncertainty, objective efficiency screening, and predictive capability beyond sampled locations. This study presents an integrated framework for strategic wind farm site selection in Ethiopia’s Amhara Region by combining Fuzzy Analytic Hierarchy Process (FAHP), efficiency analysis, and predictive modelling to overcome the limitations of static GIS approaches. The FAHP stage incorporates expert judgment through fuzzy triangular numbers to weight six variables such as wind speed, slope, elevation, distance to transmission lines, distance to roads, and land-use/land-cover to achieve a consistency ratio of 0.0175 with wind speed emerging as the dominant factor of 0.4211 weights in order to generate a spatial suitability surface and extract candidate high-potential areas. High-potential zones identified by FAHP are then evaluated as decision-making units using input-oriented Data Envelopment Analysis (DEA) models. DEA efficiency screening identifies North Shewa as frontier-efficient zone (CCR = BCC = SBM = 1.0), which contributes 32.25% of regional suitable land. Finally, machine learning (ML) models (Random Forest (RF), Support Vector Machine (SVM) and Extreme Gradient Boost (XGBoost)) are trained on 1.5 million sampled pixels from the 31-million-cell feature space to learn generalizable suitability functions. Random Forest achieved optimal performance with RMSE of 0.2981 and R 2 of 0.8145 in regression and F1-score of 0.9207 and accuracy of 0.9237 in classification to delineates 1,698 km 2 of high-priority corridors within North Shewa for immediate wind farm deployment. Independent validation through five different sources that includes 250 MW of Debre Birhan under Ethiopian Ministry of Finance private public project pipeline to confirm North Shewa as the highest-potential development corridor. This framework advances wind energy planning by integrating subjective weighting, objective efficiency analysis, and predictive modelling into a unified strategic decision-support system applicable for wind energy planning in data-scarce region.