Dingli Zhang

Dr. Dingli Zhang


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2013 in Journal of Geotechnical and Geoenvironmental Engineering
Verified
Journal Article
Closed access
DZDingli Zhang
Dingli Zhang
Qian FangQian Fang
Qian Fang
Yanjuan HouYanjuan Hou
Yanjuan Hou
PLPengfei Li
Pengfei Li
LWLouis Ngai Yuen Wong
Louis Ngai Yuen Wong
Lot JC3 of the Xianmen Airport Highway Project in China involved building a twin-tube tunnel with each tube serving three-lane one-way traffic. The existence of 79 overlying buildings brought great challenges to the tunnel construction. To safeguard these buildings, two building blocks located above the nearby tunnel portal were approved by the owner of the project to be the trial blocks. Compensation grouting was adopted for ground settlement compensation at this lot. Free-field compensation grouting tests were conducted to derive the suitable grouting parameters. Pretreatment to reinforce the ground prior to the tunneling passage, concurrent grouting to compensate the excessive settlements during the tunneling passage, and regrouting to uplift the distorted buildings after the tunneling passage were designed to protect the trial blocks. According to the monitoring data of the trial blocks and the ground, the characteristics of the soil-structure interaction were studied and the criteria for the ...

30 July 2022 in Science China Technological Sciences
Verified
Journal Article
Closed access
PDF file
ZSZhenYu Sun
ZhenYu Sun
DZDingli Zhang
Dingli Zhang
QFQian Fang
Qian Fang
GDGuanSuo Dui
GuanSuo Dui
ZCZhaoFei Chu
ZhaoFei Chu

25 December 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DLDaoping Liu
Daoping Liu
DZDingli Zhang
Dingli Zhang
Qian FangQian Fang
Qian Fang
ZSZhenyu Sun
Zhenyu Sun
Liqiang CaoLiqiang Cao
Liqiang Cao
ALAo Li
Ao Li
Three-bench seven-step excavation method (TSEM) has been widely used in large-section loess tunnels for high-speed railway in China. As the most commonly applied pre-supports, pipe roofs and leading ductules are broadly used in the ground reinforcement of loess tunnels. Their application is to ensure face stability and prevent tunnel collapse during construction. This study focused on the impacts of the TSEM on the ground surface settlement (GSS), as well as the tunnel displacement characteristics for the high-speed railway tunnels with large cross-sections in loess ground. Furthermore, the reinforcement effects of the two kinds of pre-supports were compared in this study. In-situ tests for a total of 12 sections were conducted to reveal the GSSs and displacement characteristics for the shallow-buried large-section loess tunnels. The monitoring results showed that the excavation process plays a significant role on the GSSs and tunnel displacements. A maximum value was observed for the tunnel displacement rate at the excavation of the upper and middle benches, where the face instability or collapse were prone to occur. The GSS trough curves were deviated to the early excavation side, with no conformation to the Gauss distribution. After a series of comparisons, we concluded that the pre-reinforcement effect of the pipe roof is better than that of the leading ductule for the loess tunnels.

28 July 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DLDaoping Liu
Daoping Liu
DZDingli Zhang
Dingli Zhang
Qian FangQian Fang
Qian Fang
ZSZhenyu Sun
Zhenyu Sun
JLJiwei Luo
Jiwei Luo
ALAo Li
Ao Li
A super-span tunnel that has the characteristics of a large excavation area, a small high-span ratio and a significant spatial effect exhibits a complex mechanical response during the excavation process. In this paper, taking the Badaling Great Wall station in Beijing, China as the engineering background, a case study of field monitoring a super-span tunnel has been presented. A typical monitoring section was selected in the super-span transition section of the tunnel and the deformation and forces of both the surrounding rock and the support structures were systematically monitored. The dynamic evolution and the spatial distribution characteristics of the monitoring data, including the internal displacement of the surrounding rock, the tunnel displacement, the contact pressure between the surrounding rock and the primary supports, the contact pressure between the primary and secondary supports, the axial forces in the bolts and cables, the internal forces in both the steel arches and the secondary supports and the internal stresses of the surrounding rock, were analyzed. The results of the monitoring and the analyses have shown that the deformation and the forces acting on both the surrounding rock and the tunnel’s lining are directly related to the construction procedures, the geological conditions and the locations in the super-span tunnel. According to the results, a few suggestions to improve the construction of the tunnel have been proposed.

18 June 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XLXinyu Li
Xinyu Li
DZDingli Zhang
Dingli Zhang
Yanjuan HouYanjuan Hou
Yanjuan Hou
With the increasing intensity of underground development, the planned metro lines will inevitably pass through water-rich soft stratum. The existing research results show that shield tunneling in water-rich stratum is prone to ground settlement and segment cracking due to the large moisture content and the low soil strength, which will pose risks to the safety of construction. The prediction of ground deformation characteristics and influencing ranges caused by shield tunneling in water-rich soft stratum has been a topical issue among the tunnel research community. Based on the shield tunnel project of Tianjin Metro Line 6, supported by the monitoring data, this paper analyses the ground deformation characteristics caused by shield tunneling in water-rich soft stratum. The results suggest that the surface settlement ranges from −14.20 mm to −28.00 mm in Tianjin’s water-rich soft stratum, which is at an acceptable level of engineering. A refined 3D model addressing fluid–structure interactions is developed to consider the construction process in water-rich soft stratum. Based on this technique, this article focuses on the effect of the support pressure at the excavation surface, the friction between the shield skin and the soil, and synchronous grouting quantity on the ground settlement and structural deformation. The results show that the friction between the shield skin and the soil is the most detrimental to deformation control, whereas the synchronous grouting quantity is the most advantageous to ground and segment deformation control. In practice, timely injection of bentonite slurry reduces friction between the shield skin and the soil, and effective synchronous grouting reduces shield tunneling disruption. This technique can provide calculation support in the optimization of shield tunneling schemes in water-rich soft stratum.

24 March 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YWYazheng Wang
Yazheng Wang
DZDingli Zhang
Dingli Zhang
Qian FangQian Fang
Qian Fang
XLXiang Liu
Xiang Liu
JWjianchen wang
jianchen wang
Pipe jacking has been widely used in urban underground engineering construction in recent years. Prediction of ground deformation caused by pipe jacking is particularly important for the safety of construction. With regard to the densely arranged pipes used in the pipe roof structure method, an analytical model of stratum disturbance caused by jacking of parallel rectangular pipes is proposed on the basis of Mindlin’s displacement solution and the stochastic medium theory. The influencing factors such as soil loss, additional thrust on the excavation face, friction between pipe jacking machine and soil, friction between subsequent pipes and soil, and the grouting pressure were comprehensively considered. Then, a 3D numerical simulation and a case study were conducted. The results showed consistent agreement with the analytical solution, and the proposed method can take into account the asymmetry of surface settlement curve induced by construction. A discussion of the ground deformation law shows that the proposed approach can reasonably predict the ground deformation and provide a reference for relevant pipe jacking construction.