Andrej Pal

Andrej Pal


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 January 2020 in Minerals
Verified
Journal Article
Open access
PDF file
APAndrej Pal
Andrej Pal
JRJanez Rošer
Janez Rošer
MVMilivoj Vulic
Milivoj Vulic
Impacts of underground mining have been reduced by continuous environmental endeavors, scientific, and engineering research activities, whose main object is the behavior and control of the undermined rock mass and the subsequent surface subsidence. In the presented Velenje case of underground sublevel longwall mining where coal is being exploited both horizontal and vertical, backfilling processes and accompanying fracturing in the coal layer, and rock mass are causing uncontrolled subsidence of the surface above. 3D point clouds of the study were acquired in ten epochs and at excavation heights on the front were measured at the same epochs. By establishing a sectors layout in the observational area, smaller point clouds were obtained, to which planes were fitted and centroids of these planes then calculated. Centroid heights were analyzed with the FNSE model to estimate the time of consolidation and modified according to excavation parameters to determine total subsidence after a certain period. Proposed prognosis approaches for estimating consolidation of active subsidence and long term surface environmental protection measures have been proposed and presented. The C2C analysis of distances between acquired 3D point clouds was used for identification of surface subsidence, reclamation areas and sink holes, and for validation of feasibility and effectiveness of the proposed prognosis.

11 February 2020 in Minerals
Verified
Journal Article
Open access
PDF file
APAndrej Pal
Andrej Pal
DPDrago Potočnik
Drago Potočnik
MVMilivoj Vulic
Milivoj Vulic
Construction of rock-fill dams requires extensive preparatory work. The rationality of construction, ecological aspects, and flood safety must be considered. Potential catastrophic consequences of failure or collapse classify dam structures as high-risk objects which are built according to all safety regulations, and their conditions must be monitored. In this study, we focus on the settlement behavior of a cofferdam crest by analyzing the obtained monitoring data with a non-exponential modified sigmoid function, developed at the Faculty of Natural Sciences and Engineering (FNSE model). Furthermore, monitoring adjustment is introduced, and future settlement is estimated based on verification with actual values.

1 June 2020 in Acta geotechnica slovenica
Verified
Journal Article
Closed access
APAndrej Pal
Andrej Pal
MBMirko A Borisov
Mirko A Borisov
MVMilivoj Vulic
Milivoj Vulic

1 October 2019 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Open access
PDF file
MBMirko A Borisov
Mirko A Borisov
APAndrej Pal
Andrej Pal
MVMilan Vrtunski
Milan Vrtunski
DJDušan Jovanović
Dušan Jovanović
VPVladimir Petrovic
Vladimir Petrovic
MVMilivoj Vulic
Milivoj Vulic
In this paper several well-known filtering techniques were compared in the purpose of automatic line generalization. The used methods for line simplification are digital first order low-pass filter, Savitzky-Golay (SG) filter and...