Fei Ye

Prof. Fei Ye

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 June 2022 in Engineering Failure Analysis
Verified
Journal Article
Closed access
HFHaolan Feng
Haolan Feng
FYFei Ye
Fei Ye
YJYin Jiang
Yin Jiang
JWJian Wang
Jian Wang
XWXiaobao Wen
Xiaobao Wen
QFQing Fang
Qing Fang

8 April 2022 in Engineering Failure Analysis
Verified
Journal Article
Closed access
XHXingbo Han
Xingbo Han
XLXiaoming Liang
Xiaoming Liang
FYFei Ye
Fei Ye
XWXin Wang
Xin Wang
ZCZiming Chen
Ziming Chen

15 April 2023 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
ESEnjie Su
Enjie Su
XZXingbing Zhang
Xingbing Zhang
XWXiaobao Wen
Xiaobao Wen
JLJia Liu
Jia Liu
FYFei Ye
Fei Ye
PLPengfei Lei
Pengfei Lei

10 March 2020 in European Journal of Environmental and Civil Engineering
Verified
Journal Article
Closed access
FYFei Ye
Fei Ye
NQNan Qin
Nan Qin
XHXin Han
Xin Han
XLXing Liang
Xing Liang
XGXiang Gao
Xiang Gao
KYKaichen Ying
Kaichen Ying
Shield tunnel is widely adopted in the metro construction, and backfill grouting is the significant part. With power-law fluid grouts as the study object, a cylindrical infiltration diffusion model and spherical infiltration diffusion model are developed by applying the generalized Darcy law and theories of seepage mechanics based on the displacement effect of grout on groundwater. Through examples, the impact of factors including grouting pressure and formation permeability coefficient in the spherical displacement infiltration diffusion model on diffusion radius, flow rate, total pressure of grout in segments, and uniform equivalent pressure in grout diffusion area (grout pressure per unit area in a segment) is analyzed. The result shows that, the diffusion speed, injection flow rate and the pressure received in segments increase with an increase of the grouting pressure. Meanwhile, as the injection time increases, the flow rate of grout under conditions of different grouting pressure all decreases, and a sharp decrease exists. The diffusion speed and grouting pressure are positively correlated to the permeability coefficient, and with the increasement of the injection time, the diffusion displacement of grout in different permeability coefficient varies increasingly, the increase amplitude of the pressure acting on the segment by grout increases gradually.

1 April 2024 in Underground Space
Verified
Journal Article
Open access
CTChongming Tian
Chongming Tian
YTYueping Tong
Yueping Tong
JZJunyuan Zhang
Junyuan Zhang
FYFei Ye
Fei Ye
GSGuifeng Song
Guifeng Song
MZMeng Zhao
Meng Zhao

8 January 2019 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
FYFei Ye
Fei Ye
NQNan Qin
Nan Qin
XGXiang Gao
Xiang Gao
XQXue-Yong Quan
Xue-Yong Quan
XQXian-Zhuo Qin
Xian-Zhuo Qin
BDBing Dai
Bing Dai
The Lanzhou Yellow River Tunnel is the first metro shield tunnel that undercrosses the Yellow River in China. It was completed after successfully overcoming several construction challenges, including strata with a high proportion of large‐sized sandy cobble stratum being saturated, large‐scale sand pits along the bank of the Yellow River, and a combination of boulders and erratic blocks of rock. Given the difficulties in constructing the tunnel, this paper summarizes the scheme employed to transform the cutter and cutter head design to be applicable to sandy cobble stratum and the key technology used to form the slurry film to facilitate crossing the sand pits in a systematic way. The transformation scheme primarily involved the addition of an adjusting device to control the aperture ratio of the shield on the cutter head, a protective device for the hob hub, and a protective device for the piston rod in the oil cylinder of the crusher. The implementation of measures mentioned above guarantees the safe completion of the tunnel, which can provide a reference for similar projects.