junghun lee

Mr. junghun lee

Korea Electric Power Corporation (South Korea), Naju, Jeonnam, Republic of Korea
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 November 2021 in Energies
Verified
Journal Article
Open access
PDF file
WCWookyu Chae
Wookyu Chae
JLjunghun lee
junghun lee
WKWoo-Hyun Kim
Woo-Hyun Kim
SHSungwook Hwang
Sungwook Hwang
JKJun-Oh Kim
Jun-Oh Kim
JKJae-Eon Kim
Jae-Eon Kim
Generally, the fault current supplied by inverter-based renewable energy sources (IBRES) and electrical storage systems (ESS) is about 1.2 to 2 times their rated current and much lower than synchronous generators because the former acts as a current source and the latter acts as a voltage source. A conventional power system in a small island is composed of only synchronous generators and protected from short circuit faults using an overcurrent relay (OCR). However, in the remote microgrid with IBRES, ESS, and synchronous generators, the fault current varies depending on the configuration of generation sources. Namely, the fixed OCR protection method cannot protect microgrids from short circuit faults. This paper proposes an adaptive protection method to protect the microgrid from faults by actively changing the OCR setting according to the state of the generator source combination. A microgrid with ESS and a synchronous generator is modeled and simulated through PSCAD/EMTDC software to validate the proposed adaptive protection method.

25 May 2020 in Journal of Electrical Engineering & Technology
Verified
Journal Article
Closed access
PDF file
JLjunghun lee
junghun lee
MPMin-Su Park
Min-Su Park
HAHong-Seon Ahn
Hong-Seon Ahn
KPKyung-Won Park
Kyung-Won Park
JOJoon Seok Oh
Joon Seok Oh
JKJae-Eon Kim
Jae-Eon Kim

10 July 2019 in Journal of Electrical Engineering & Technology
Verified
Journal Article
Closed access
PDF file
JOJin-Hong Oh
Jin-Hong Oh
JLjunghun lee
junghun lee
JRJe-Chang Ryu
Je-Chang Ryu
HLHong-Won Lee
Hong-Won Lee
HCHong-Moon Chae
Hong-Moon Chae
JKJae-Eon Kim
Jae-Eon Kim

2 March 2020 in Energies
Verified
Journal Article
Open access
PDF file
JLjunghun lee
junghun lee
SJSEUNGGYU JEON
SEUNGGYU JEON
DKDong-Kyu Kim
Dong-Kyu Kim
JOJoon Seok Oh
Joon Seok Oh
JKJae-Eon Kim
Jae-Eon Kim
The current practice of Distributed Generation (DG) disconnection for every fault in distribution systems has an adverse effect on utility and stable power trading when the penetration level of DGs is high. That is, in the process of fault detecting and Circuit Breaker (CB) reclosing when a temporary fault occurs, DGs should be disconnected from the Point of Common Coupling (PCC) before CB reclosing. Then all DGs should wait at least 5 minutes after restoration for reconnection and cannot supply the pre-bid power in power market during that period. To solve this problem, this paper proposes a control method that can keep operating without disconnection of DG. This control method is verified through modeling and simulation by the PSCAD/EMTDC software package for distribution systems with DGs based on PCS (Power Conditioning Systems) and CB reclosing protection.

24 January 2019 in Journal of Electrical Engineering & Technology
Verified
Journal Article
Closed access
PDF file
JKJae-Hun Ko
Jae-Hun Ko
TCTae-Seong Choi
Tae-Seong Choi
JRJe-Chang Ryu
Je-Chang Ryu
HLHong-Won Lee
Hong-Won Lee
JLjunghun lee
junghun lee
JKJae-Eon Kim
Jae-Eon Kim

12 August 2021 in Energies
Verified
Journal Article
Open access
PDF file
JLjunghun lee
junghun lee
WKWoo-Hyun Kim
Woo-Hyun Kim
LHLee Hakju
Lee Hakju
JKJun-Oh Kim
Jun-Oh Kim
WCWookyu Chae
Wookyu Chae
Power utilities worldwide commonly use the radial distribution system because of its advantages of being simple in structure and having relatively inexpensive installation costs. It has a disadvantage in that its power supply reliability is low because the load side of the fault section will suffer from an outage in the event of a fault in the system. However, recently, with ICT (Information and Communication Technologies) development, system reliability is required to be high as the outage-susceptible loads increase. In addition, the increase in the connection of distributed resources such as renewable energy and electric vehicles is making it impossible to predict the power flow and reducing line utilization. Therefore, a loop power distribution system is proposed as a measure to solve this problem. Because all buses (nodes) in a loop distribution system have two or more power supply routes, they are more reliable than the radial system. It allows them to improve line utilization by connecting lines with different load peak times. However, in the case of a fault in the loop distribution system, the fault current is supplied from both directions, making it impossible to properly isolate the fault section with the protection method of the conventional distribution system. The permissive overreach transfer trip (POTT) method using communication to compensate for the limitations of conventional protection devices, and the other method using directional distance relay, is proposed. However, these methods operate by determining the direction of the fault current but have a disadvantage. It is difficult to detect a fault due to the effects of ground faults and distributed generation (DG) occurring in other lines. Therefore, in this paper, we propose a protection coordination algorithm that uses the negative-sequence component of voltage and current that occur when an unbalanced fault occurs, rather than the determination of the directionality and use of communication. To validate this, we configured a system using PSCAD/EMTDC (Manitoba Hydro International Ltd., Winnipeg, Manitoba, Canada), a system analysis program package and verified the results depending on the type of faults with the proposed algorithm.