Arto Kiviniemi

Prof. Dr. Arto Kiviniemi

School of Architecture, University of Liverpool, Leverhulme Building, Liverpool L69 7ZN, UK

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 March 2019 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
Mustapha MunirMustapha Munir
Mustapha Munir
AKArto Kiviniemi
Arto Kiviniemi
SJSteve Jones
Steve Jones
Purpose: Currently, building information modelling (BIM) is largely seen as a 3D model, not as an information model or information management tool. This wrong perception of BIM and low interest in 3D asset management (AM) is one of the major reasons for the slow adoption by clients in the architectural, engineering and construction (AEC) industry. The purpose of this paper is to identify the techniques and strategies of streamlining AM systems for BIM-based integration, and how the information is captured from physical assets towards BIM-based integration for clients to derive value from BIM investments. Design/methodology/approach: A qualitative case study strategy was used to study the strategic implementation process of integrating BIM with AM systems and the business value of BIM in AM by a large asset owner in the UK. Findings: The paper identifies key strategies in the adoption of BIM-based processes by an asset owner, the implementation process, the challenges and the benefits attained. Several barriers were identified as the challenges of adopting BIM-based processes in AM: complexity and cost associated with BIM; irrelevance of 3D geometric data in AM processes; nature of asset ownership structure; managing the asset handover process; managing change within the organisation. Organisations will have to consider the following issues in streaming asset information with BIM: the development for a clear strategy prior to adoption; connecting the strategy to the business goals; and conducting the discovery exercise to identify organisational information needs. Originality/value: The research addresses a significant gap in the development of techniques and strategies for asset owners to streamline BIM with AM systems and derive business value from such integration. The research context is a case study involving a large owner-operator in the UK that has been able to derive value from BIM systems in their AM processes. The key value of the paper is improving asset owners’ understanding of BIM in AM by demonstrating the implementation strategies, linkage to organisational objectives, challenges, value management process and business value of BIM in AM. Another contribution of the paper is improving the understanding of BIM, which is usually viewed as 3D models and that 3D geometric data do not have much value for AM tasks.

17 June 2014
Verified
Conference Paper
Closed access
AKArto Kiviniemi
Arto Kiviniemi
RCRicardo Codinhoto
Ricardo Codinhoto
An often-introduced claim is that BIM can be a powerful tool for facility managers to improve buildings' performance and manage operations more efficiently throughout the life-cycle of buildings. Although this claim has been common since the early introduction of BIM, there is relatively little information about the real use on BIM in the operation and maintenance of buildings. Even most large public owners who have been early adopters of BIM (such as GSA, USACE or Senate Properties) have used BIM more in managing their construction projects than implementing it into their FM activities. The benefits of BIM for design and construction are relatively well studied and documented, but there is little evidence of the benefits of BIM in the operational phase. In addition, the challenges involved in shifting from traditional FM processes to new BIM-based processes are not well-known. In this paper, we document some of the issues involved in the adoption of BIM in FM and identify some of the enablers and barriers to BIM implementation in FM. The findings are based on a case study carried out during the final design and construction phase of Manchester Town Hall Complex, a major re-development project in the UK. Results confirm the lack of awareness of the potential of BIM in the operation phase and the need for clear guidelines for the implementation of BIM in FM defining required level of integration, standard BIM protocols and the key deliverables for FM purposes.

1 April 2013 in International Journal of 3-D Information Modeling
Verified
Journal Article
Closed access
PDF file
RCRicardo Codinhoto
Ricardo Codinhoto
AKArto Kiviniemi
Arto Kiviniemi
SKSergio Kemmer
Sergio Kemmer
CRCecilia Da Rocha
Cecilia Da Rocha
Considerable amount of research has been developed that investigate the benefits of Building Information Modelling (BIM) for design and construction. However, as suggested in the UK Government Strategy, the relevant gains and difficulties related to the adoption of BIM in the operational stages of the project life cycle are considerably less explored in the available literature. In this respect, a gap of knowledge exists in relation to the value that design and construction information modelling can generate after construction is finished. Moreover, the difficulties involved in shifting from traditional to BIM-Based FM processes are not known. In this article a discussion is proposed that address some of the issues involved in the adoption of BIM from an owners' perspective. In addition, enablers and barriers to BIM implementation in FM are identified. The discussion is drawn from the results of a case study carried out during the design and construction stage of a major re-development project in Manchester, UK. Data was gathered through interviews with designers, contractors and client’s representatives, real-time observation of BIM development and use and documental analysis. Results indicate a lack of awareness related to the benefits that BIM can offer to FM processes. It also suggests that guidance is necessary for the establishment of the necessary steps for the implementation of BIM for FM purposes such as the identification of key deliverables (capabilities), the establishment of the level of integration, the definition of the maturity level and the standard BIM protocols.

2 April 2020 in International Journal of Building Pathology and Adaptation
Verified
Journal Article
Closed access
Mustapha MunirMustapha Munir
Mustapha Munir
AKArto Kiviniemi
Arto Kiviniemi
SJSteve Jones
Steve Jones
SFStephen Finnegan
Stephen Finnegan
Purpose: There is a need to develop the understanding of asset owners concerning the constraints of building information modelling (BIM) implementation, and its subsequent value realisation activities in asset management (AM) cannot be overstated. This is because the life cycle cost of a built asset is three times more than construction costs and five times more than the initial investment outlays. Hence, this paper investigated and identified the key issues and challenges of realising BIM business value in AM.Design/methodology/approach: The study adopted an explorative and deductive approach. A qualitative four-stage research design strategy was adopted using 10 semi-structured interviews and document analysis to collect data. These were analysed through qualitative thematic analysis.Findings: The study identified 15 key barriers and classified them from the perspective BIM governance dimensions, namely people, process and technology. Furthermore, the study identified that more process-based challenges are experienced than people or technology. Of the identified challenges, three are people-related, eight are process-related and four are technology-related.Practical implications: The analysed results focussed on the development of the understanding of asset owners, policymakers and researchers regarding the complex challenges that hinder BIM utilisation and value realisation in AM. The findings of this paper support progress towards enhanced BIM adoption in the architecture, engineering and construction (AEC) industry by highlighting the significance of the identified challenges, their nature (people-, process- or technology-based) and the resultant effect on BIM business value realisation during asset operations.Originality/value: The original contribution of this study was the exploration and identification of the current challenges experienced by asset owners in implementing BIM during asset operations and how these affect the derivation of BIM business value.

1 April 2020 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
SSSujesh Francis Sujan
Sujesh Francis Sujan
SJSteve Jones
Steve Jones
AKArto Kiviniemi
Arto Kiviniemi
JWJacqueline Mary Wheatcroft
Jacqueline Mary Wheatcroft
BMBwalimu Mwiya
Bwalimu Mwiya
The insufficient understanding and literature on people collaborating in the Architectural-Engineering-Construction (AEC) industry has prompted researchers to investigate this by conducting project-to-project comparisons. A mixed method-based comparison of two construction projects’ design teams was made in order to present factors to be considered in fostering a positive collaborative culture. Client knowledge and involvement, existing relationships between teams, stronger informal collaboration, a decentralised leadership style and the adequate monetary motivation to a firm were found to be most critical. The study also assessed whether the use of holistic analysis methods can quantitatively show the differences between the projects; in particular, which project had a more positive collaborative culture. The perception based method used correlated the variance of perception of the teamwork environment and systemic risk to the projects with a more positive collaborative culture; 80% of constructs (some postulated attribute of people assumed, to reflect in test performance) supported the qualitative data. Additionally, assessments of the personalities of respondents from the project with a more collaborative culture also showed higher collective agreeableness. Findings suggest that projects with more changes, more assumptions made and uncertainty in requirements affect the collaborative culture negatively.

1 January 2018
Verified
Book Chapter
Closed access
RCRicardo Codinhoto
Ricardo Codinhoto
VDVincenzo Donato
Vincenzo Donato
JCJulie Comlay
Julie Comlay
Kemi   AdeyeyeKemi Adeyeye
Kemi Adeyeye
AKArto Kiviniemi
Arto Kiviniemi
Despite significant progress for the adoption of BIM in AEC, currently its adoption for FM has been sparse, scarce, and extraneous. There are few cases in the world where robust adoption has taken place that are able to demonstrate success and are willing to disseminate the positive impact of BIM FM on sustainability, operational efficiency, and cost reduction. To date, there is no approach, motivation, or support in place to enable the extensive adoption of BIM for FM worldwide. In the UK, for instance, the UK BIM initiative, mandate, and the Digital Built Britain cannot count on the participation of FM stakeholders; the government has only started promoting initiatives that could trigger an extensive BIM approach, generating benefits for organizations and more importantly, society as a whole. In this chapter, data from authors' various research projects has been put together to generate an agenda for BIM FM implementation. The findings reveal that unless an intervention, such as a mandate for FM services suppliers, is put in place, very little will happen with regards to BIM FM.