The efficient calibration of hydrologic models allows experts to evaluate past events in river basins, as well as to describe new scenarios and predict possible future floodings. A difficulty in this context is the need to adjust a large number of parameters in the model to reduce prediction errors. In this work, we address this issue with two complementary contributions. First, we propose a new lumped rainfall-runoff hydrologic model—called Qom—which is featured by a limited set of continuous decision variables associated with soil moisture and direct runoff. Qom allows to separate and quantify the volume of losses and excesses of the rainwater falling in a hydrographic basin, while a Clark’s model is used to determine output hydrograms. Second, we apply a multi-objective optimization approach to find accurate calibrations of the model in a systematic and automatic way. The idea is to formulate the process as a bi-objective optimization problem where the Nash-Sutcliffe Efficiency coefficient and percent bias have to be minimized, and to combine the results found by a set of metaheuristics used to solve it. For validation purposes, we apply our proposal in six hydrographic scenarios, comprising river basins located in Spain, USA, Brazil and Argentina. The proposed approach is shown to minimize prediction errors of simulated streamflows with regards to those observed in these real-world basins.
This paper addresses a real-world optimization problem in civil engineering. It lies in the dimensioning of a 162m long bridge composed of 1584 bars so that both its weight and its deformation are to be minimized. Evaluating each possible configuration of the bridge takes several seconds and, as a consequence, running a metaheuristic for several thousands of evaluations would require many days on one single processor. Our approach has been to develop a distributed master/worker version of SMS-EMOA, an indicator-based multiobjective algorithm. By combining the Java implementation of the algorithm in jMetal with the Condor distributed scheduler, we have been able to use more than 350 cores to obtain accurate results in a reasonable amount of time.