Xiaoqing Liang

Dr. Xiaoqing Liang


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 March 2020 in Water
Verified
Journal Article
Open access
PDF file
CJChangming Ji
Changming Ji
XLXiaoqing Liang
Xiaoqing Liang
YPYang Peng
Yang Peng
YZYanke Zhang
Yanke Zhang
XYXiaoran Yan
Xiaoran Yan
JWJiajie Wu
Jiajie Wu
In decision-making with interval numbers, there are problems such as how to reduce the loss of decision information to improve decision accuracy and the difficulty of using interval numbers for sorting. On the basis of fully considering the subjective and objective weights of indexes, the grey entropy method (GEM) is improved by taking advantage of the Mahalanobis-Taguchi System (MTS) in which the orthogonal design has few tests but much obtained information, and the Mahalanobis distance can reflect the correlation between indexes. Then, the signal-to-noise ratio is integrated with the improved degree of balance and approach, and a multi-dimensional interval number decision model based on MTS and GEM is put forth. This model is applied to selecting the optimal scheme of controlling the Pankou reservoir’s water level in flood season. Compared with the decision results of other methods, the optimal scheme selected by the proposed model can achieve greater benefits within an acceptable risk range and thus better coordinate the balance between risk and benefit, which verifies the feasibility and validity of the model.

26 March 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
YWYueqiu Wu
Yueqiu Wu
LWLiping Wang
Liping Wang
WWang Yi
Wang Yi
YZYanke Zhang
Yanke Zhang
JWJiajie Wu
Jiajie Wu
Bin HeBin He
Bin He
In the short-term operation of the power generation of cascade reservoirs, uncertainty factors such as inflow forecast errors could cause various types of risks. The inflow to a downstream reservoir is not only affected by inflow forecast errors from upstream reservoirs but also the forecast errors associated with inflow to the stream segment between the reservoirs, such as from a tributary. The inflow forecast errors of different forecast periods may also be correlated. To address this multivariate problem, the inflow forecast error variables were jointly fitted in this study using the Gaussian mixture model (GMM) and a t-Copula function based on the analysis of the error distribution characteristics in different forecast periods. Therefore, a stochastic model that coupled with the GMM and t-Copula to calculate inflow forecast errors in multiple forecast periods was established. Furthermore, according to the simulation results of the stochastic model and the predicted runoff series, a set of simulated runoff processes were obtained. Then they were combined with the existing power generation plan to carry out the risk analysis for short-term operation of the power generation in a cascade reservoir. The approach was evaluated using the Jinguan cascade hydropower system within the Yalong River basin as a case study. For this case study, the risk analysis for short-term operation of the power generation was analyzed based on stochastic simulation of the inflow forecast errors; the results show the feasibility and effectiveness of the proposed methods.