Robert Lis

Dr. Robert Lis

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 June 2020 in Energies
Verified
Journal Article
Open access
PDF file
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
Michał JasińskiMichał Jasiński
Michał Jasiński
EREdyta Ropuszyńska-Surma
Edyta Ropuszyńska-Surma
MWMagdalena Węglarz
Magdalena Węglarz
DKDominika Kaczorowska
Dominika Kaczorowska
BSBeata Solak
Beata Solak
The article presents calculations and power flow of a real virtual power plant (VPP), containing a fragment of low and medium voltage distribution network. The VPP contains a hydropower plant (HPP), a photovoltaic system (PV) and energy storage system (ESS). The purpose of this article is to summarize the requirements for connection of generating units to the grid. Paper discusses the impact of the requirements on the maximum installed capacity of distributed energy resource (DER) systems and on the parameters of the energy storage unit. Firstly, a comprehensive review of VPP definitions, aims, as well as the characteristics of the investigated case study of the VPP project is presented. Then, requirements related to the regulation, protection and integration of DER and ESS with power systems are discussed. Finally, investigations related to influence of DER and ESS on power network condition are presented. One of the outcomes of the paper is the method of identifying the maximum power capacity of DER and ESS in accordance with technical network requirements. The applied method uses analytic calculations, as well as simulations using Matlab environment, combined with real measurement data. The obtained results allow the influence of the operating conditions of particular DER and ESS on power flow and voltage condition to be identified, the maximum power capacity of ESS intended for the planed VPP to be determined, as well as the influence of power control strategies implemented in a PV power plant on resources available for the planning and control of a VPP to be specified. Technical limitations of the DER and ESS are used as input conditions for the economic simulations presented in the accompanying paper, which is focused on investigations of economic efficiency.

22 November 2019 in Energies
Verified
Journal Article
Open access
PDF file
Tomasz SikorskiTomasz Sikorski
Tomasz Sikorski
Michał JasińskiMichał Jasiński
Michał Jasiński
EREdyta Ropuszyńska-Surma
Edyta Ropuszyńska-Surma
MWMagdalena Węglarz
Magdalena Węglarz
DKDominika Kaczorowska
Dominika Kaczorowska
PJPrzemyslaw Janik
Przemyslaw Janik
This paper analyzes the technical and economic possibilities of integrating distributed energy resources (DERs) and energy-storage systems (ESSs) into a virtual power plant (VPP) and operating them as a single power plant. The purpose of the study is to assess the economic efficiency of the VPP model, which is influenced by several factors such as energy price and energy production. Ten scenarios for the VPP were prepared on the basis of the installed capacities of a hydropower plant (HPP), rooftop solar photovoltaic (PV), and energy-storage system (ESS), as well as weather conditions, in Poland. On the basis of technical conditions, it was assumed that the maximum power capacity of the ESS equaled 1.5 MW. The economic efficiency analysis presented in this paper demonstrated that, in seven years, the VPP will achieve a positive value of the net present value (NPV) for a scenario with 0.5 MW battery storage and rainy summers. Furthermore, sensitivity analysis was conducted on price factors and DER production volume. The price variable had a major impact on the NPV value for all scenarios. The scenario with a 0.5 MW battery and typical summers was highly sensitive to all factors, and its sensitivity decreased as the ESS capacity grew from 0.5 to 1.5 MW.

9 June 2023 in IEEE Access
Verified
Journal Article
Open access
MAMuhammad Jamshed Abbass
Muhammad Jamshed Abbass
RLRobert Lis
Robert Lis
ZMZohaib Mushtaq
Zohaib Mushtaq
The modern electrical power system relies on digital communications to detect, react, and ideally prevent power outages and other disruptions. In this study, an artificial neural network is trained on both complete and incomplete data to make a prediction about the voltage stability of a power grid network consisting of four nodes arranged in a star configuration. In addition, the missing input data are then forecasted and applied to the problem of maintaining the Voltage stability of the power grid. Accuracy, mean squared error, and mean absolute error are some of the performance evaluation metrics that have been utilized in the context of binary classification. Other metrics include mean absolute error. The evaluation procedure was completed successfully and the model delivers a result of 98.73% precision after going through the testing process.

2 March 2023 in Energies
Verified
Journal Article
Open access
PDF file
MAMuhammad Jamshed Abbass
Muhammad Jamshed Abbass
RLRobert Lis
Robert Lis
FSFaisal Saleem
Faisal Saleem
The antlion optimizer (ALO) algorithm is used in this article for maximum power point tracking (MPPT) of a solar array. The solar array consists of a single module, while there are 20 cells in the module. The voltage and current ratings of each cell are 2 V and 2.5 A, making a 100 W array in ideal condition. However, the voltage and current characteristics of the PV cell are unable to achieve maximum power. Therefore, the ALO was used for MPPT. The results of the ALO are compared with the traditional metaheuristic approaches, perturb and observe (P&O) and flower pollination (FP) algorithms. Comparison of the ALO with the stated algorithms is conducted for two cases: when solar irradiance is 1000 W/m2 and when it drops to 200 W/m2 at first then reaches 1000 W/m2. The change of irradiance is performed to simulate the partial shading condition. The simulation results depict that maximum power for the first case using the ALO reaches 91.3 W in just 0.05 s, while the P&O and PFA reach 90 W after 0.64 and 2 s, respectively. For the case of partial shading, maximum power using the ALO drops to 55 W when irradiance decreases to 200 W/m2 and then increases with the increase in irradiance reaching 91.3 W which clearly shows that the ALO outperforms the P&O and FPA.

19 August 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MAMuhammad Jamshed Abbass
Muhammad Jamshed Abbass
RLRobert Lis
Robert Lis
WRWaldemar Rebizant
Waldemar Rebizant
The stability of the operation of the power system is essential to ensure a continuous supply of electricity to meet the load of the system. In the operational process, voltage stability (VS) should be recognized and predicted as a basic requirement. In electrical systems, deep learning and machine learning algorithms have found widespread applications. These algorithms can learn from previous data to detect and predict future scenarios of potential instability. This study introduces long short-term memory (LSTM) technology to predict the stability of the nominal voltage of the power system. Based on the results, the recommended LSTM technology achieved the highest accuracy target of 99.5%. In addition, the LSTM model outperforms other machine learning (ML) and deep learning techniques, i.e., support vector machines (SVMs), Naive Bayes (NB), and convolutional neural networks (CNNs), when comparing the accuracy of the VS forecast. The results show that the LSTM method is useful to predict the voltage of an electrical system. The IEEE 33-bus system indicates that the recommended approach can rapidly and precisely verify the system stability category. Furthermore, the proposed method outperforms conventional assessment methods that rely on shallow learning.

23 April 2024 in Energies
Verified
Journal Article
Open access
PDF file
MAMuhammad Jamshed Abbass
Muhammad Jamshed Abbass
RLRobert Lis
Robert Lis
MAMuhammad Awais
Muhammad Awais
TNTham Nguyen
Tham Nguyen
The maintenance of an uninterrupted electricity supply to meet demand is of paramount importance for maintaining the stable operation of an electrical power system. Machine learning and deep learning play a crucial role in maintaining that stable operation. These algorithms have the ability to acquire knowledge from past data, enabling them to efficiently identify and forecast potential scenarios of instability in the future. This work presents a hybrid convolutional long short-term memory (ConvLSTM) technique for training and predicting nodal voltage stability in an IEEE 14-bus microgrid. Analysis of the findings shows that the suggested ConvLSTM model exhibits the highest level of precision, reaching a value of 97.65%. Furthermore, the ConvLSTM model has been shown to perform better compared to alternative machine learning and deep learning models such as convolutional neural networks, k-nearest neighbors, and support vector machine models, specifically in terms of accurately forecasting voltage stability. The IEEE 14-bus system tests indicate that the suggested method can quickly and accurately determine the stability status of the system. The comparative analysis obtained the results and further justified the efficiency and voltage stability of the proposed model.