Jian Wu

Dr. Jian Wu


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 March 2020 in Water
Verified
Journal Article
Open access
PDF file
MLMingwei Li
Mingwei Li
ZZZhifang Zhou
Zhifang Zhou
CZChao Zhuang
Chao Zhuang
YXYawen Xin
Yawen Xin
MCMeng Chen
Meng Chen
JWJian Wu
Jian Wu
The Xiluodu Dam is a concrete double-curvature arch dam with a crest elevation of 610 m and a height of 285.5 m. Since the impoundment of the Xiluodu reservoir, remarkable river valley contractions (RVCs) have been observed upstream and downstream of the reservoir, potentially threatening the safety of the dam. However, the cause of these RVCs remains unclear. Based on an analysis of hydrogeological conditions, the RVCs were determined a result of the expansion of the aquifer, within which the effective stress decreased due to an increase in the hydraulic head after reservoir impoundment. Referring to the hydrostatic seasonal time (HST) model, a groundwater hydrostatic seasonal (GHS) model is proposed for simulating and predicting the development of the RVCs. Unlike the HST model, the GHS model can provide information on aquifer hydraulic diffusivity. The calibration results illustrate that the GHS model can accurately fit the observed RVCs data. The calculation results revealed that the RVCs were mainly affected by the hydraulic head of the confined aquifer, and that seasonal effects gave rise to less than 10% of the total RVCs. Finally, the development of RVCs were predicted using the GHS model. The prediction results demonstrated that the RVCs of most monitoring lines in the Xiluodu reservoir would gradually approach a convergence condition after 6 February 2021. Until the deadline of the prediction on 1 May 2035, there is still one monitoring line that has not reached a convergence condition (whose RVCs are 157.6 mm, and where the RVC growth rate will decrease to 0.005 mm/d by that time). Considering the large amount of RVCs, we think the safety of the dam requires closer consideration.

10 September 2021 in Hydrogeology Journal
Verified
Journal Article
Closed access
PDF file
JWJian Wu
Jian Wu
ZZZhifang Zhou
Zhifang Zhou
CZChao Zhuang
Chao Zhuang

5 May 2023 in Acta Geotechnica
Verified
Journal Article
Closed access
PDF file
JWJian Wu
Jian Wu
ZZZhifang Zhou
Zhifang Zhou

7 October 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
JWJian Wu
Jian Wu
ZZZhifang Zhou
Zhifang Zhou
Numerical simulations have been widely used to predict groundwater inflow into tunnels during excavations. An appropriate geometric size of a numerical model is crucial for reducing the simulation time and ensuring the accuracy of numerical results. However, to the best of our knowledge, no information concerning the scale effect of the model extent on the seepage characteristics of tunnels under drained conditions has been published. This study evaluates how the model extent affects the tunnel inflow, drawdown, and water pressure via the Signorini type variational inequality formulation. A series of two-dimensional finite element models are conducted with various combinations of tunnel parameters, including tunnel radius, initial groundwater level, lining thickness, and relative permeability. Subsequently, a comprehensive function to yield the optimum model extent within an allowable error is proposed. Interestingly, the optimum model extent for both tunnel inflow and water pressure decreases with an increase in the relative permeability, whereas that of the drawdown exhibits the opposite pattern. A model extent of no less than 200 times the tunnel radius is recommended to acquire accurate model results and is verified with existing analytical methods. This study therefore not only highlights the drainage effect of the tunnel but also provides universal suggestions for engineering practice.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
JWJian Wu
Jian Wu
ZZZhifang Zhou
Zhifang Zhou
WXWenjun Xia
Wenjun Xia
HWHaixiao Wang
Haixiao Wang
ZFZhongqiang Fang
Zhongqiang Fang
The cut‐and‐cover technique is widely used in the field of tunnel engineering owing to its simple construction technology, high working efficiency, and low cost. However, the safety of the foundation pit and the environmental impact during excavation are of great concern, especially for tunnels that pass through lakes and/or rivers. In this paper, a novel excavation and construction method is presented for the Taihu tunnel, which is the longest lake‐crossing tunnel in China. In this method, a cofferdam of double‐row steel sheet piles (DSSPs) was designed in order to divide the overlying excavation into several closed zones. During the construction, four zones were regarded as a unit, and different construction steps were carried out simultaneously in each zone. Therefore, an assembly line for the tunnel excavation was established to accelerate the construction speed. The most distinctive advantage of this method is that the excavation did not cut off the normal flow of the lake water and the shipping routes, with low environmental impact. To investigate the tunnel deformation during excavation, a finite element analysis combined with field monitoring data was adopted, indicating that the magnitude of the tunnel deformation was notably less than those reported from other excavation projects. Moreover, the effect of groundwater on the piles and the safety of the foundation pit was revealed using numerical modelling. This study provides a new idea for the design and construction of tunnel engineering, especially for extra‐long underwater tunnels in soft deposits.

9 October 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JWJian Wu
Jian Wu
ZZZhifang Zhou
Zhifang Zhou
HWHao Wang
Hao Wang
BCBo Chen
Bo Chen
JWJinguo Wang
Jinguo Wang
Various hydrogeological problems like groundwater inflow, water table drawdown, and water pressure redistribution may be encountered in the construction of hydraulic projects. How to accurately predict the occurrence of groundwater inflow and assess the drainage effect during construction are still challenging problems for engineering designers. Taking the Jinzhai pumped storage power station (JPSPS) of China as an example, this paper aims to use different methods to calculate the water inflow rates of an underground powerhouse and evaluate the drainage effect caused by tunnel inflow during construction. The methods consist of the analytical formulas, the site groundwater rating (SGR) method, and the Signorini type variational inequality formulation. The results show that the analytical methods considering stable water table may overestimate the water inflow rates of caverns in drained conditions, whereas the SGR method with available hydro-geological parameters obtains a qualitative hazard assessment in the preliminary phase. The numerical solutions provide more precise and reliable values of groundwater inflow considering complex geological structures and seepage control measures. Moreover, the drainage effects, including a seepage-free surface, pore water pressure redistribution, and hydraulic gradient, have been accurately evaluated using various numerical synthetic cases. Specifically, the faults intersecting on underground caverns and drainage structures significantly change the groundwater flow regime around caverns. This comparative study can not only exactly identify the capabilities of the methods for cavern inflow in drained conditions, but also can comprehensively evaluate the drainage effect during cavern construction.