A bilevel stochastic programming problem (BSPP) model of the decision-making of an energy hub manager is presented. Hub managers seek ways to maximize their profit by selling electricity and heat. They have to make decisions about: (1) the level of involvement in forward contracts, electricity pool markets, and natural gas networks and (2) the electricity and heat offering prices to the clients. These decisions are made under uncertainty of pool prices, demands as well as the prices offered by rival hub managers. On the other hand, the clients try to minimize the total cost of energy procurement. This two-agent relationship is presented as a BSPP in which the hub manager is placed in the upper level and the clients in the lower one. The bilevel scheme is converted to its equivalent single-level scheme using the Karush-Kuhn-Tucker optimality conditions although there are two bilinear products related to electricity and heat. The heat bilinear product is replaced by a heat price-quota curve and the electricity bilinear product is linearized using the strong duality theorem. In addition, conditional value at risk is used to reduce the unfavorable effects of the uncertainties. The effectiveness of the proposed model is evaluated in various simulations of a realistic case study.
29 October 2023 in International Journal of Electrical Power & Energy Systems
High‐impact, low‐probability events that cause significant annual damages seriously threaten the health of distribution networks. The effects of these events have made the expansion planning for distribution systems something beyond the traditional reliability criteria, so there is an ever‐increasing need for modifications in current planning approaches and focusing on the resilience in the expansion planning of distribution networks. The new attitude dealing with resilience and distributed generation sources in distribution networks necessitates a fundamental reconsidering of traditional distribution network planning methods. Here, by modelling common natural disasters such as floods and storms, an appropriate index is introduced to evaluate the distribution network resilience in the presence of distributed generation (DG) sources, including conventional gas‐fired and photovoltaic sources. Then, by presenting an appropriate model for load and photovoltaic production, the problem of comprehensive distribution network planning, including substations, feeders, and DG sources, is mathematically formulated as a multi‐objective optimization problem to improve resilience and optimize costs. Furthermore, a non‐dominated sorting genetic algorithm is used to solve the problem of comprehensively planning a resilient distribution network. Implementation of the proposed model on the IEEE 54‐bus sample network shows that network resilience can be improved with minimum cost by optimal network planning.
One of the essential aspects of power system planning is generation expansion planning (GEP). The purpose of GEP is to enhance construction planning and reduce the costs of installing different types of power plants. This paper proposes a method based on a genetic algorithm (GA) for GEP in the presence of wind power plants. Since it is desirable to integrate the maximum possible wind power production in GEP, the constraints for incorporating different levels of wind energy in power generation are investigated comprehensively. This will allow the maximum reasonable amount of wind penetration in the network to be obtained. Besides, due to the existence of different wind regimes, the penetration of strong and weak wind on GEP is assessed. The results show that the maximum utilization of wind power generation capacity could increase the exploitation of more robust wind regimes. Considering the growth of the wind farm industry and the cost reduction for building wind power plants, the sensitivity of GEP to the variations of this cost is investigated. The results further indicate that for a 10% reduction in the initial investment cost of wind power plants, the proposed model estimates that the overall cost will be minimized.
This study presents a bi‐level model for expansion planning of generation systems. The proposed model endogenously determines the incentive to invest (guaranteed purchase contract) for wind and storage units. In the upper level of the proposed model, wind turbines and compressed air storage systems focus on maximising their profits by presenting a strategic offering, while at the lower level, there is an independent system operator with the purpose of increasing social welfare run the market clearing equations. In solving the bi‐level model, the Karush–Kuhn–Tucker conditions are used to develop the mathematical program with equilibrium constraints. The problem was first linearised and then solved by GAMS software. The outputs of this problem are the installation time and capacity of the wind and storage units and the price of the purchase contract. The obtained results were compared with other existing studies for verification purposes.
Utilization of active power filters (APFs) is the most efficient method to reduce harmonic pollution in distribution networks. Previous approaches utilized APFs in integrated control schemes based on broad data-gathering systems. Since a broad data-gathering system is not available in most practical distribution networks, previously proposed approaches may not readily be implemented. This paper presents the utilization of stand-alone controlled APFs (SACAPFs) in radial distribution networks. Utilizing APFs with a stand-alone control system decreases implementation costs and complexity by making them autonomous and independent of integrated control systems, which are complicated and expensive in practical applications. In this paper, a single SACAPF is modeled as a dependent current source where its injection current is equal in amplitude but opposite in phase compared to the harmonic content of the current passing through the point of common coupling (reference current). Due to the presence of both linear and nonlinear loads in the distribution network, the reference current changes after injection by SACAPF, so it is necessary to modify the injection current until reaching a constant value in the reference current. This is considered via an iterative procedure in the modeling scheme. Operation of multiple SACAPFs is handled using a backward procedure based on a priority list. Simulation results on an IEEE 18-bus test system show the proper operation of the stand-alone control systems for both single and multiple SACAPF implementation. Furthermore, optimal allocation of the proposed SACAPFs is performed in an IEEE 33-bus test network and a 9-bus test network, and the results are discussed and compared with the allocation of integrated control system APFs.