This study aimed to determine whether the wind zone that characterizes a given area of the country in open area is reflected in the built-up area lying within the zone. Analysis included four Polish cities located in different wind zones. The two-parameter Weibull density distribution function was used to present the wind conditions at each location. Two 3 kW VAWT devices were selected to evaluate the productivity of wind turbines at the locations analyzed. It was shown that the wind zones characterizing the wind potential of a region in an open area have no significant influence on the wind conditions in the built-up area located in that area. It was determined that the study location’s did not exhibit wind potential that could be economically justified by a wind turbine. WTs in the city do not reach their nominal productivity. A decisive advantage of very light winds was observed (up to 2 m/s) and a large proportion of so-called atmospheric calms. It was shown that the installation of small wind turbines in an urbanized area requires a minimum of annual wind measurements at the exact location and height of each future turbine planned.
1 January 2015 in Polish Journal of Environmental Studies
This paper concerns choosing the best software for road noise simulation. Three independent parts of roads were analysed using three calculation programmes based on three mathematical models. The results of conducted measurements and analyses proved how important the selection of the right calculation programme for each numerical traffic noise simulation is. One should also be careful when choosing a calculation programme for rare traffic situations, such as bus terminals or transport bases. Despite striving to create an ideal calculation model for traffic noise considering the large number of changeable acoustic and non-acoustic parameters, engineers should also be informed about the criteria of usefulness of a programme (model) for a certain road situation.
The justification for the construction of a wind farm depends primarily on two factors. The first one is the availability of the area with significant windiness; the second one is the environmental conditions in the selected location. The aim of this paper was to demonstrate the need for parallel noise and energy analyses during the design of a turbine location and selection of its type on the wind farm. The noise analyses were performed according to ISO 9613-2. A detailed analysis of wind conditions in a given location is a basic activity to determine the profitability of a wind power plant foundation. The main environmental impact of WF is noise emission. The examples of wind turbines’ selection optimally utilizing wind resources in two particular locations are presented. Six wind turbines were analyzed for each location. The choice of a wind turbine for the examined location was determined by the parameters of the device, the results of annual wind measurements, and acceptable noise levels in the environment. The three devices that met the acoustic criteria and the most energy efficient ones are indicated. We describe how a proper process of selecting a type of WT for a specific location should proceed.