Michał Wichliński

Dr. Michał Wichliński


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2013 in Archives of Environmental Protection
Verified
Journal Article
Open access
PDF file
MWMichał Wichliński
Michał Wichliński
Rafal KobyleckiRafal Kobylecki
Rafal Kobylecki
ZBZbigniew Bis
Zbigniew Bis
This paper presents the results of the investigation associated with the determination of mercury content in Polish hard coal and lignite samples. Those coals are major fuels used for electricity generation in Poland. The results indicated that the average content of mercury in the coal samples was roughly about 100 ng/g. Apart from the determination of the mercury contents a detailed ultimate and proximate analysis of the coal samples was also carried out. The relationships between the mercury content and ash, as well as fixed carbon, volatile matter, sulfur, and high heating value of the coal samples were also established. Furthermore, the effect of coal enrichment was also investigated, and it was found that the enrichment process enabled the removal of up to 75% of the coal mercury from the samples.

13 August 2018 in E3S Web of Conferences
Verified
Conference Paper
Open access
MWMichał Wichliński
Michał Wichliński
JSJanusz Staszkiewicz
Janusz Staszkiewicz
Photovoltaic installations are becoming an increasingly important player in the global renewable energy production market. The biggest disadvantage of photovoltaic installations is their high price, and relatively low efficiency. Photovoltaic cells achieve a theoretical efficiency of 30%, but in real conditions this efficiency is much lower at roughly 15%. Photovoltaic installations are particularly recommended in locations where the amount of solar radiation is high and where photovoltaic installations will be able to work at full capacity for most of the year. The paper presents an analysis of the work of a photovoltaic installation built for a roofed car park located in eastern Cairo, the capital of Egypt. The installation is built for a car park located at the Schlumberger company. The installation is built of 1344 Hanwha Q.Power L-G325 silicon polycrystalline cell modules, each module has a power of 325 Wp, and the total area of the installation is 2,611 m2. Effective irradiance on collectors is 1922 kWh/m2. The array’s nominal produced energy was 840 MWh/year, the amount of electricity injected into the grid was 587 MWh/year, which means that the calculated performance ratio was 0.62.

15 March 2017
Verified
Conference Paper
Open access
PDF file
MWMichał Wichliński
Michał Wichliński
GWGrzegorz Wielgosz
Grzegorz Wielgosz
Rafal KobyleckiRafal Kobylecki
Rafal Kobylecki
E3S Web of Conferences, open access proceedings in environment, energy and earth sciences

17 October 2016
Verified
Conference Paper
Open access
PDF file
MWMichał Wichliński
Michał Wichliński
Rafal KobyleckiRafal Kobylecki
Rafal Kobylecki
ZBZbigniew Bis
Zbigniew Bis
E3S Web of Conferences, open access proceedings in environment, energy and earth sciences