Rita Lavikka

Dr. Rita Lavikka

orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 June 2018 in Construction Management and Economics
Verified
Journal Article
Closed access
RLRita Lavikka
Rita Lavikka
JKJohanna Kallio
Johanna Kallio
TCThomas Casey
Thomas Casey
MAMiimu Airaksinen
Miimu Airaksinen
Decision-makers in the architecture, engineering and construction (AEC) industry lack knowledge about the implementation of digitalization to generate value. We applied a scenario planning method developed by Schoemaker and Mavaddat to provide decision-makers with information for using digital data and technologies to create value for customers. We aim to theoretically understand how the scenario planning process helps AEC decision-makers to make sense of the future. Our findings show that boundary spanners are needed for steering the discussions among industry actors towards shared knowledge about the technological, social, economic and political changes needed at the industry level to optimize the benefits of digitalization. Our findings also show that boundary spanners apply scenario figures as boundary objects to cross knowledge boundaries. Based on our findings, we theoretically conceptualize scenario planning as a boundary-spanning activity that enables AEC decision-makers from different fields to share tacit knowledge and to cross knowledge boundaries. The practical implication is that scenario planning provides a method for AEC decision-makers to make sense of the changes needed to realize the preferred future for the industry.

9 March 2015 in Supply Chain Management: An International Journal
Verified
Journal Article
Closed access
RLRita Lavikka
Rita Lavikka
RSRiitta Smeds
Riitta Smeds
MJMiia Jaatinen
Miia Jaatinen
Purpose: – The paper aims to compare the coordination of supply chain networks in contractually different complex construction projects.Design/methodology/approach: – A comparative case study of the coordination of collaborative work in two successful hospital construction projects was conducted. One of the projects applied multiple dyadic contracts, whereas the other project applied one multi-party contract between the parties. The projects were located in the USA. Data were collected by observing the coordination on the construction sites for six weeks and by conducting 72 interviews.Findings: – The paper shows that depending on the contract type, the timing and extent of complementary procedural coordination differs during projects. Compared with one multi-party contract, the dyadic contracts needed to be complemented during the design phase with three additional procedural coordination mechanisms: organizational design, processes for collaborative work and integrated concurrent engineering sessions. Additionally, common rules of conduct were taken into use during the construction phase. However, regardless of the contract type, procedural coordination mechanisms, such as co-located working, collaborative decision-making in inter-organizational meetings, a liaison role and shared project goals were needed throughout the projects.Practical implications: – If multiple dyadic contracts are applied, procedural coordination mechanisms have to be co-created by all supply chain parties at the beginning of the project.Originality/value: – The paper provides an understanding on successful contractual and complementary procedural coordination mechanisms of supply chain networks in complex construction projects.

16 August 2023 in Sustainable Cities and Society
Verified
Journal Article
Open access
SPSatu Paiho
Satu Paiho
NWNina Wessberg
Nina Wessberg
MDMaria Dubovik
Maria Dubovik
RLRita Lavikka
Rita Lavikka
SNSami Naumer
Sami Naumer

1 August 2020 in The Journal of Technology Transfer
Verified
Journal Article
Open access
PDF file
PUPetri Uusitalo
Petri Uusitalo
RLRita Lavikka
Rita Lavikka
The demand for affordable, high-quality homes and premises has increased as society has evolved. Construction companies have shown that an industrialised housebuilding (IHB) platform strategy is an effective way of meeting exacting customer requirements. We decided to apply a managerial perspective and consider the IHB platform as a technological solution when investigating technology transfer (TT) in a construction context. Drawing on a meta-analysis of the literature and a qualitative case study at an IHB company, this work examines how two construction companies participate in TT. The results show that the IHB platform strategy can help a company overcome uncertainties associated with the TT process. Furthermore, the platform strategy supports the transferability of IHB to different markets, which, in turn, provides unique opportunities for companies from other contexts to enter the construction market. Our findings also revealed that CEOs from three construction companies were not only interested in TT due to potential profit improvements, but also considered how the process could benefit their employees and the community. This may be a result that is specific to Nordic culture or insight into a unique characteristic of the broad construction industry. This study contributes knowledge to the scarce research field of TT in a construction context. It provides evidence for how further cases of TT may disrupt the construction industry in terms of new business models or companies from the diverse field entering the market.

8 March 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MVMaarit Vehviläinen
Maarit Vehviläinen
RLRita Lavikka
Rita Lavikka
SRSeppo Rantala
Seppo Rantala
MPMarko Paakkinen
Marko Paakkinen
JLJanne Laurila
Janne Laurila
TVTerttu Vainio
Terttu Vainio
The city of Tampere in Finland aims to be carbon-neutral in 2030 and wanted to find out how the electrification of public transport would help achieve the climate goal. Research has covered topics related to electric buses, ranging from battery technologies to lifecycle assessment and cost analysis. However, less is known about electric city buses’ performance in cold climatic zones. This study collected and analysed weather and electric city bus data to understand the effects of temperature and weather conditions on the electric buses’ efficiency. Data were collected from four battery-electric buses and one hybrid bus as a reference. The buses were fast-charged at the market and slow-charged at the depot. The test route ran downtown. The study finds that the average energy consumption of the buses during winter was 40–45% higher than in summer (kWh/km). The effect of cabin cooling is minor compared to the cabin heating energy needs. The study also finds that infrastructure needs to have enough safety margins in case of faults and additional energy consumption in harsh weather conditions. In addition, appropriate training for operators, maintenance and other personnel is needed to avoid disturbances caused by charging and excessive energy consumption by driving style.

10 May 2019 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
RLRita Lavikka
Rita Lavikka
Riikka KyröRiikka Kyrö
Riikka Kyrö
APAntti Peltokorpi
Antti Peltokorpi
ASAnna Särkilahti
Anna Särkilahti
Purpose: Hospital construction projects often suffer from relatively late changes in the project lifecycle, which disrupt the project execution and impact project productivity. The purpose of this paper is to explore the root causes of changes in hospital construction projects. The paper aims to propose ways to prepare for the changes. Design/methodology/approach: The study focuses on changes during the construction of new hospital facilities. An explorative, case study research design is utilised. Five case projects from Finland, Sweden and the USA were selected for in-depth analysis. The primary data comprise semi-structured interviews, supported by secondary evidence such as change order documents. Findings: The findings reveal eight categories for change sources: contracts, and equipment and systems are reflective of the fast-paced healthcare technology and changing user requirements, while external environment comprises changes caused by both regulatory and physical environment. Changes in operations are reflected in the continuous development of treatment methods and processes. The user, owner, designer and contractor initiated changes represent the stakeholder influence. The paper makes a connection between these change sources and project complexity dimension. A framework for change dynamics is introduced, and product and process flexibility is suggested as a suitable method to prepare for and manage changes. Originality/value: The paper is the first to link construction changes to project complexity factors. The paper argues that changes, when managed appropriately, are not only necessary but also beneficial to large construction projects in a quickly changing environment. The findings guide project stakeholders in implementing project flexibility, in the product and process dimensions, which is a balancing force to project complexity.