Xuhe Gao

Dr. Xuhe Gao

Key Laboratory of Highway Engineering in Special Region, Ministry of Education, Chang'an University
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 April 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Xuhe GaoXuhe Gao
Xuhe Gao
WTWei Ping TIAN
Wei Ping TIAN
ZZZhipei Zhang
Zhipei Zhang
The surrounding ground settlement and displacement control of an underground diaphragm wall during the excavation of a foundation pit are the main challenges for engineering safety. These factors are also an obstacle to the controllable and sustainable development of foundation-pit projects. In this study, monitoring data were analyzed to identify the deformation law and other characteristics of the support structure. A three-dimensional numerical simulation of the foundation-pit excavation process was performed in Midas/GTS NX. To overcome the theoretical shortcomings of parameter selection for finite-element simulation, a key data self-verification method was used. Results showed that the settlement of the surface surrounding the circular underground continuous wall was mainly affected by the depth of the foundation-pit excavation. In addition, wall deformation for each working condition showed linearity with clear staged characteristics. In particular, the deformation curve had obvious inflection points, most of which were located deeper than 2/3 of the overall excavation depth. The characteristics of the cantilever pile were not obvious in Working Conditions 3–9, but the distribution of the wall body offset in a D-shaped curve was evident. Deviation between the monitoring value of the maximal wall offset and the simulated value was only 4.31 %. The appropriate physical and mechanical parameters for key data self-verification were proposed. The concept of the circular-wall offset inflection point is proposed to determine the distribution of inflection-point positions and offset curves. The method provides new opportunities for the safety control and sustainable research of foundation-pit excavations.

18 January 2023 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
Xuhe GaoXuhe Gao
Xuhe Gao
WTWeiping Tian
Weiping Tian
JLJiachun Li
Jiachun Li
HQHongliang Qi
Hongliang Qi
SLShiyang Li
Shiyang Li
ZZZhipei Zhang
Zhipei Zhang
The stress and deformation response characteristics of the support structure in the process of excavation and support of circular sand foundation pit are complex. The existing research results lack a general analysis method for the mutual check between the field monitoring data and the numerical simulation results. This research relies on the excavation and support project of a circular foundation pit in the sandy soil layer of the west anchorage of Humen Second Bridge. The force and deformation characteristics of foundation pit soil are monitored and structure is supported during construction. A new method for checking simulation parameters based on the excursion monitoring data of the diaphragm wall is proposed. The modeling and calculation theory of foundation pit excavation and support process is established. The superposition calculation of pore water pressure is used to realize the foundation pit seepage-stress coupling. The effects of steady-state seepage conditions on the equivalent strain of foundation pit soil, the displacement of the diaphragm wall, and the axial force of the lining are compared and analyzed. The stress and deformation mechanism of the soil layer and supporting structure during the excavation and support of a circular foundation pit in the sand layer is obtained.

24 November 2023 in Scientific Reports
Verified
Journal Article
Open access
PDF file
Xuhe GaoXuhe Gao
Xuhe Gao
WTWeiping Tian
Weiping Tian
QPQinggang Pang
Qinggang Pang
JLJiachun Li
Jiachun Li
HQHongliang Qi
Hongliang Qi
ZZZhipei Zhang
Zhipei Zhang
Based on existing researches, field drillings and numerical simulations are carried out in this paper to analyze the problems of subsidence control in the goaf of multi-layer inclined coal seam. Midas/GTS NX is used to build a three-dimensional calculation model of the goaf. A new method of using borehole data to check simulation parameters is proposed. The whole process of goaf excavation, construction of roadbed (pile foundation) and grouting treatment is analyzed. Analysis theory of different subgrade construction schemes and grouting treatment process on goaf is established. Response characteristics of displacement and equivalent stress and strain of goaf in multilayer inclined coal seam are obtained. A new method for analyzing the characteristics of the stress and deformation of the rock strata before and after grouting in the goaf under the conditions of different foundation schemes on the surface is provided in this research.

17 February 2022 in Geomatics, Natural Hazards and Risk
Verified
Journal Article
Open access
Xuhe GaoXuhe Gao
Xuhe Gao
WTWei-Ping Tian
Wei-Ping Tian
JLJiachun Li
Jiachun Li
QHQi Hongliang
Qi Hongliang
ZZZhipei Zhang
Zhipei Zhang
Shiyang LiShiyang Li
Shiyang Li
Aiming at the problem of fuzzy selection basis of dual-structure slope simulation calculation parameters and the complicated force and deformation of the slope body in the supporting process. The study relies on the treatment project of the right side slope of the K5 + 220-K5 + 770 section of the TJ1A section of the Jiangwen Expressway. The slope is a gravel soil-weathered bedrock dual structure slope, which is referred to as Hetangba slope in the study. Use Midas/GTS NX to build a trial calculation model. A new method for checking simulation parameters of deep displacement monitoring data is proposed. The superposition calculation method of pore water pressure is proposed to realize the slope stress-seepage coupling. The analysis method of slope excavation and support process is put forward. The analysis shows that the most dangerous working condition in the slope excavation and support process is the second-level excavation. When there is a local displacement and plastic strain concentration area on the slope, the reference significance of the extreme value and the safety factor is reduced. Compared with the application of pore water pressure and no pore water pressure, there is no obvious change in the position of the extreme value of horizontal displacement and plastic strain in working conditions 2–8, but the extreme value changes are different. The slope safety factor of working conditions 2–8 is reduced. The continuous distribution zone of plastic strain inside the slope disappeared in condition 7. There is a very small unstable area on the top of the third-level slope of working conditions 9–11. The research results have great theoretical guiding significance for the measurement and control simulation and early warning analysis of the dual structure slope construction process.

1 October 2020 in Water
Verified
Journal Article
Open access
PDF file
Xuhe GaoXuhe Gao
Xuhe Gao
BCBaocheng Cheng
Baocheng Cheng
WTWei Ping TIAN
Wei Ping TIAN
ZZZhipei Zhang
Zhipei Zhang
JLJiachun Li
Jiachun Li
QHQi Hongliang
Qi Hongliang
The selection of calculation parameters for slope excavation support design and the analysis of seepage stability is a significant challenge. This difficulty also hinders the development of slope support engineering. This study examined the right binary structure slope engineering of the K5 + 220–K5 + 770 section of the TJ1A mark of the Jiangkou-Weng’an Highway in Guizhou province. In this study, we propose and use the deep displacement monitoring data and p value test method to check the simulation parameters. Furthermore, the superposition calculation method for steady-state seepage analysis of slope geotechnical structure is proposed. A comparative analysis of the displacement, strain, stress, and safety factor of the slope after the application of pore water pressure was carried out for three slope conditions. The analysis showed that steady-state seepage has a significant effect on the displacement of the slope during the completion of excavation. As a result, a continuous distribution of strain arises on the slope along the interface between the potential sliding surface and the rock–soil layer, and then forms a continuous sliding zone. Additionally, steady-state seepage has a significant effect on the position of the displacement distribution during the initial support of the slope, leading to a significant increase in the extreme value of the shear outlet displacement of the potential slip surface of the slope and in the extreme value of equivalent strain. Finally, steady-state seepage reduces the displacement and equivalent strain upon construction of the secondary slope support. The steady-state seepage has a limited effect on the stress concentration, but reduces the safety factor calculated using the strength reduction method, in all three stages of slope excavation and support. This study enriches the analysis methods for determining the stability of a dual-structure slope during the rainy season, and provides new ideas for the safety and control of slope support projects.

1 January 2021 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
Xuhe GaoXuhe Gao
Xuhe Gao
WTWeiping Tian
Weiping Tian
JLJiachun Li
Jiachun Li
HQHongliang Qi
Hongliang Qi
ZZZhipei Zhang
Zhipei Zhang
The establishment of the prestressed cable loss prediction model is a difficult problem faced by the popularization and use. This article aims at the problem of the loss of anchor cable prestress over time in the soil‐rock dual‐structure slope. We relied on the soil‐rock dual‐structure slope treatment project of section K5 + 220‐K5 + 770 of Jiangwen Expressway and monitored the prestress loss of the anchor cable in the slope through the anchor cable meter with built‐in vibrating wire sensor. Using regression analysis and segmented modelling methods, we established a comprehensive mathematical improvement model, analyzed the applicability of the improved model, and obtained the error range, 0.04%–8.9%. This work offers a new approach for predicting anchor cable prestress loss, which has certain practical value for the use of prestressed anchor cables.