Using solar photovoltaics (PV) to help a microgrid (MG) operator for cost reduction may not be a straightforward problem due to the intermittent nature of PV power generation and unpredictable load demands. One potential way to address this challenge is to use batteries that can store the surplus PV energy whenever possible and supply the energy back to the MG when needed. In this context, this paper proposes a battery energy management system (BEMS) for an MG, in which PVs and diesel generators (DGs) are the primary sources of electricity. The novelty of the proposed BEMS lies within the energy management of multiple types of batteries' characteristics and the reduction of DGs' operating hours simultaneously. Furthermore, the proposed BEMS also takes into account different characteristics of the batteries when controlling the charging and discharging decision to extend the battery lifetime. Real-world data of MG load and PV power generations are used to verify the effectiveness of the proposed BEMS. Through numerical simulation case studies, it is demonstrated that the proposed BEMS is capable of achieving the following: reduction in DGs' operating hours, reduction in PV power fluctuations, and concurrent management of multiple batteries of different characteristics and extension of battery lifetime by controlling battery charge and discharge rate.
Traditionally, the choices to balance the grid and meet its peaking power needs are by installing more spinning reserves or perform load shedding when it becomes too much. This problem becomes worse as more intermittent renewable energy resources are installed, forming a substantial amount of total capacity. Advancements in Energy Storage System (ESS) provides the utility new ways to balance the grid and to meet its peak demand by storing un-used off peak energy for peak usage. Large sized ESS—mega watt (MW) level—are installed by different utilities at their substations to provide the high speed grid stabilization to balance the grid to avoid installing more capacity or triggering any current load shedding schemes. However, such large sized ESS systems and their required inverters are costly to install, require much space and their efficacy could also be limited due to network fault current limits and impedances. In this paper, we propose a novel approach and trial for 3000+ homes in Singapore of achieving a large capacity of demand management by developing a smart distribution board (DB) in each home with the high speed metering sensors (>6 kHz sampling rate) and non-intrusive load monitoring (NILM) algorithm, that can assist home users to perform the load/appliance profile identification with daily usage patterns and allow targeted load interruption using the smart sockets/plugs provided. By allowing load shedding at device or appliance level, while knowing their usage profile and preferences, this can allow such an approach to become part of a new voluntary interruptible load management system (ILMS) that requires little user intervention, while minimizing disruption to them, allowing ease of mass participation and thus achieving the intended MW demand management capacities for the grid. This allows for a more cost effective way to better balance the grid without the need for generation capacity growth, large ESS investment while improving the way to perform load shedding without disruptions to entire districts. Simply, home users can now know and participate with the grid in interruptible load (IL) schemes to target specific home appliance, such as water heaters or air conditioning, allowing interruptions during certain times of the day, instead of the entire house, albeit with the right incentives. This allows utilities to achieve MW capacity load shedding with millions of appliances with their preferences, and most importantly, with minimal disruptions to their consumers quality of life. In our paper, we will also consider coupling a small sized Home Energy Storage System (HESS) to amplify the demand management capacity. The proposed approach does not require any infrastructure or wiring changes and is highly scalable. Simulation results demonstrate the effectiveness of the NILM algorithm and achieving high capacity grid demand management. This approach of taking user preferences for appliance level load shedding was developed from the results of a survey of 500 households that indicates >95% participation if they were able to control their choices, possibly allowing this design to be the most successful demand management program than any large ESS solution for the utility. The proposed system has the ability to operate in centralized as part of a larger Energy Management System (EMS) Supervisory Control And Data Acquisition (SCADA) that decide what to dispatch as well as in autonomous modes making it simpler to manage than any MW level large ESS setup. With the availability of high-speed sampling at the DB level, it can rely on EMS SCADA dispatch or when disconnected, rely on the decaying of the grid frequency measured at the metering point in the Smart DB. Our simulation results demonstrate the effectiveness of our proposed approach for fast grid balancing.