Gülçağ Albayrak

Dr. Gülçağ Albayrak

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 July 2020 in Iranian Journal of Science and Technology, Transactions of Civil Engineering
Verified
Journal Article
Closed access
PDF file
GAGülçağ Albayrak
Gülçağ Albayrak

1 January 2015 in Procedia Engineering
Verified
Journal Article
Open access
UAUğur Albayrak
Uğur Albayrak
MCMehmet Canbaz
Mehmet Canbaz
GAGülçağ Albayrak
Gülçağ Albayrak
Eskisehir is a city in the northwestern part of Turkey which is seismically quite active zone. For this reason, identifying and strengthening of the deficient buildings in northern part of Eskisehir city center is very important in terms of minimal loss of life and damage. The proposed methodology for seismic failure risk assessment in urban building stock is based on the techniques of the screening procedure developed by Sucuoğlu. Rapid street screening for potential seismic hazards is a simple and effective seismic risk assessment method. The procedure is applied to detect, inventory, and rank the most vulnerable buildings in specified region that may damage during a forthcoming earthquake. Applied method is based on the observations and giving score for the selected buildings, considering some selected parameters from the street walking. The risk assessment considered criteria as the age of building, number of stories, existence of soft story, short column, heavy overhangs, pounding affect, topographic effects, visual building construction quality and earthquake zone where the building was located. After the first step evaluation on site, determined performance score (Earthquake Risk Score–E.R.S) of each building was calculated and the most dangerous buildings in terms of earthquake safety were identified. In a large scale in-situ investigation a set of 1643 buildings within the northern part of Eskisehir were seismically assessed. According to the E.R.S. points, each inspected building was classified into one of three vulnerability classes which are high risk, moderate risk and low risk. The results revealed that total 218 among 1643 buildings were classified as high risk and more detailed evaluations of these buildings were recommended before confirming the building as earthquake risk

1 January 2014 in APCBEE Procedia
Verified
Journal Article
Open access
GAGülçağ Albayrak
Gülçağ Albayrak
UAUgur Albayrak
Ugur Albayrak
Organization's characteristic formed within the framework of the society, environment, law and norms is defined organization culture. The notion of culture may seem too far from construction works, but recently, it is often discussed and analyzed. The wholeness and acting together are observed in the firms whose organizational culture has already advanced is the main reason to attach importance to this issue. Thus, the performance of companies is increased by common goals and working harmoniously. Some attitudes as avoidance of risk, competition and entrepreneurship are frequently encountered in Turkey's construction industry. Because of the organizational culture has not been fully understood yet. In this study, “the organizational culture of the construction industry” which thought to be significant in order to make a sustainable contribution to the national economy is discussed. It also believed that organizational culture will boost the value of Turkey's construction sector in national and international context

31 August 2018 in Revista de la construcción
Verified
Journal Article
Open access
PDF file
GAGülçağ Albayrak
Gülçağ Albayrak
IÖİlKer Ödemir
İlKer Ödemir
Completion of the activities within optimal time and cost plays a significant role in construction projects. Recently, project managers have to decrease the total durations and costs of the projects more than before due to the competitive environment. Mostly, decision makers usually seek different alternatives which reduce time and cost. As well as being one of the most major topics of construction management, this problem called time-cost trade-off (TCTO) which is extremely difficult to solve with traditional mathematical methods. In recent years, metaheuristic algorithms are outstanding methods in this field due to their flexible and adaptable structure. This paper presents a new algorithm called F-PSO which consists of hybridizing Firefly Algorithm (FA) with Particle Swarm Optimization (PSO). In this method, the problem is modelled with various execution modes to select the optimal one for each activity. The applicability and validity of the proposed method is confirmed by performing 18-activity project as a benchmark problem. Comparison of numerical results with different metaheuristic algorithms demonstrates the effectiveness and efficiency of F-PSO with regard to optimality of time and cost outcomes.

30 October 2016 in Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
GAGülçağ Albayrak
Gülçağ Albayrak
UAUgur Albayrak
Ugur Albayrak
Ready-mixed concrete (RMC) is one of the most common building material for construction industry for nearly all developed and developing countries. Generally, because of the technical requirements, concrete must be mixed in a batch plant and transported to the construction site. There are two important factors affected the cost of RMC: raw material cost and transportation cost. Additionally, transportation cost is also included when determining the unit price of RMC. However, profitability affects adversely in the case of long distance between the plant and construction site. For these reason, distribution of RMC from supply to the demand points with minimum cost is aimed in this study. This work contributes to both modelling and dispatching of RMC as an optimization problem by applying linear and heuristic methods. For this purpose, as an example, an urban area which divided into 7 districts and contained 4 concrete batch plants is discussed. Linear programming and genetic algorithm were applied to solve this problem and compared each other under the same conditions. The result shows linear programming is more efficient for this application because of the limited constraints and variables.

1 January 2015 in Procedia Engineering
Verified
Journal Article
Open access
GAGülçağ Albayrak
Gülçağ Albayrak
MCMehmet Canbaz
Mehmet Canbaz
UAUğur Albayrak
Uğur Albayrak
Nowadays, the concrete admixtures are widely used in the construction projects. The main types of chemical admixtures can be summarized as plasticizers, accelerating/retarding agents, air entraining agents, waterproofing additives and others such as corrosion inhibitors and colouring agents etc. The benefits derived from the use of chemical admixtures include improved durability, strength, chemical resistance, colouring, reduction in water and cement requirement and enhanced working properties of concrete. Turkey is one of the major consumers in developing countries regarding chemical admixtures. Therefore, this study set out to determine general utilization and consciousness about admixtures through a survey in Eskisehir, Turkey. The survey was performed by 153 construction professionals. The questions about reasons for preference of admixtures, types of preferred admixtures and dosage, beneficial and adverse effects of admixtures, impacts on cost and judicious use of admixtures are included in the survey. A number of statistical analyses are carried out using SPSS on data obtained. According to results, chemical admixtures are used over 70% of the total annual concrete production. The initial expectation of the participants in the use of the admixtures is to improve the properties of the fresh concrete. Additionally, the most preferred admixtures are plasticizers. The ensuing types of admixtures are agents affecting the setting time of concrete. Although the participants’ interest to using chemical admixtures is very remarkable, the awareness on this subject is very deficient. The similar studies can be suggested to apply more comprehensively. Professionals, at any level in the construction sector, need to be informed about the accurate consumption of these agents in order to avoid inappropriate results