Benmadi Milad

Dr. Benmadi Milad

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2020 in Energies
Verified
Journal Article
Open access
PDF file
BMBenmadi Milad
Benmadi Milad
SGSayantan Ghosh
Sayantan Ghosh
RSRoger M. Slatt
Roger M. Slatt
KMKurt Marfurt
Kurt Marfurt
MFMashhad Fahes
Mashhad Fahes
Optimal upscaling of a high-resolution static geologic model that reflects the flow performance of the reservoir is important for reasons such as time and calculation efficiency. In this study, we demonstrate that honoring reservoir heterogeneity is critical in predicting accurate production and reducing the time and cost of running reservoir flow simulations for the Hunton Group carbonate. We integrated three-dimensional (3D) seismic data, well logs, thin sections, outcrops, multiscale fracture studies, discrete fracture networks, and geostatistical methods to create a 100 × 150 × 1 ft gridded representative geologic model. We calibrated our gridded porosity and permeability parameters, including the evaluation of fractures, by history matching the simulated production rate and cumulative production volumes from a baseline fine-scale model generated from petrophysical and production data obtained from five wells. We subsequently reperformed the simulations using a suite of coarser grids to validate our property upscaling workflow. Compared to our baseline history matching, increasing the horizontal grid cell sizes (i.e., horizontal upscaling) by factors of 2, 4, 8, and 16 results in cumulative production errors ranging from +0.5% for two time (2×) coarser to +74.22% for 16× coarser. The errors associated with vertical upscaling were significantly less, i.e., ranging from +0.5% for 2× coarser to +10.8% for 16× coarser. We observed higher production history matching errors associated with natural fracture size. Results indicate that greater connectivity provided by natural fracture length has a larger effect on production compared to the higher permeability provided by larger apertures. We also estimated the trade-off between accuracy and run times using two methods: (a) using progressively larger grid cell sizes; (b) applying 1, 5, 10, and 20 parallel processes. Computation time reduction in both scenarios may be described by simple power law equations. Observations made from our case study and upscaling workflow may be applicable to other carbonate reservoirs.

22 August 2023 in Fuel
Verified
Journal Article
Open access
BMBenmadi Milad
Benmadi Milad
RMRouzbeh Moghanloo
Rouzbeh Moghanloo
NHNicholas W. Hayman
Nicholas W. Hayman

18 June 2024 in Energy & Fuels
Verified
Journal Article
Closed access
BMBenmadi Milad
Benmadi Milad
ATAli Tinni
Ali Tinni
PLPapa Adama Lo
Papa Adama Lo
RERamadan Eljadi
Ramadan Eljadi

1 January 2018
Verified
Conference Paper
Closed access
RSRoger M. Slatt
Roger M. Slatt
HGHenry Galvis-Portillo
Henry Galvis-Portillo
DBDaniella Becerra-Rondon
Daniella Becerra-Rondon
IEIfunanya C. Ekwunife
Ifunanya C. Ekwunife
RBRichard Brito
Richard Brito
BMBenmadi Milad
Benmadi Milad