Martin Evans

Mr. Martin Evans

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 February 2023 in Benchmarking: An International Journal
Verified
Journal Article
Closed access
HDHelen Dion
Helen Dion
MEMartin Evans
Martin Evans
Purpose: The issue of energy efficiency is becoming increasingly prevalent globally due to factors such as the expansion of the population, economic growth and excessive consumption that is not sustainable in the long run. Additionally, healthcare facilities and hospitals are facing challenges as their operational costs continue to rise. The research aim is to develop strategic frameworks for managing green hospitals, towards energy efficiency and corporate governance in hospitals and healthcare facilities.Design/methodology/approach: This research employs a qualitative case study approach, with a sample of ten hospitals examined through interviews with senior management, executives and healthcare facilities managers. Relevant data was also collected from literature and analysed through critical appraisal and content analysis. The research methodology is based on the use of grounded theory research methodologies to build theories from case studies.Findings: The research developed three integrated conceptual strategic frameworks for managing hospitals and healthcare facilities towards energy efficiency, green hospital initiatives and corporate governance. The research also outlined the concepts of green hospitals and energy efficiency management systems and best practices based on the conclusions drawn from the investigated case studies.Research limitations/implications: The study is limited to the initiatives and experiences of the healthcare facilities studied in the Middle East and North Africa (MENA) region.Originality/value: The research findings, conclusions, recommendations and proposed frameworks and concepts contribute significantly to the existing body of knowledge. This research also provides recommendations for hospital managers and policymakers on how to effectively implement and manage energy efficiency initiatives in healthcare facilities.

30 October 2020 in Benchmarking: An International Journal
Verified
Journal Article
Closed access
MEMartin Evans
Martin Evans
PFPeter Farrell
Peter Farrell
Purpose: The construction industry encounters substantial challenges in its evolution towards sustainable development and in the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This research aims to investigate the critical barriers encountered by key construction stakeholders in their efforts to integrate BIM and LC in the construction mega-projects.Design/methodology/approach: A two-round Delphi survey shaped the foundation of aggregating consensus between an expert panel that examined a set of 28 barriers resulting from a detailed analysis of the extant literature. Descriptive and inferential statistical tests were exploited for data analysis, and interrater agreement analysis was used to elaborated and validate results.Findings: The research concluded that the key barriers by descending order of significance are lack of mandatory BIM and LC industry standards and regulations by the government, resistance of the industry to change from traditional practices to LeanBIM, high cost of software licenses and training and running of BIM.Originality/value: The research findings and the proposed mitigation strategy will enhance the application of BIM and LC practices in construction mega-projects and allow project key stakeholders to place emphasis on tackling the crucial challenges and barriers identified in this research.

28 September 2021 in Benchmarking: An International Journal
Verified
Journal Article
Closed access
MEMartin Evans
Martin Evans
PFPeter Farrell
Peter Farrell
Emad ElbeltagiEmad Elbeltagi
Emad Elbeltagi
HDHelen Dion
Helen Dion
Purpose: Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction industry worldwide, including the management of construction megaprojects (CMPs). This research aims to develop a competency framework, for global integrated delivery (GID) transformative initiatives and future of work (FOW) global initiatives, to manage integration between lean construction (LC) practices and integrated project delivery (IPD) on CMPs in contemporary multinational engineering organisations.Design/methodology/approach: “Mixed research methods” involves a two-stage quantitative and qualitative research approach. In the context of CMPs, stage one consisted of a qualitative research methodology comprising a literature review to examine competencies, COVID-19 impacts, responses and key drivers (KDs) to integrate LeanIPD&GID; stage one outcomes propose a conceptualisation of LeanIPD&GID, a competency framework and future of work (FOW) global initiatives. Stage two involved an empirical questionnaire survey for a set of 30 KDs arranged into five-factor clusters (FCs), 226 respondents from 23 countries with an extensive cosmopolitan experience; analysis adopted structural equation modelling (SEM), descriptive and inferential statistics, percentage scoring analysis, principal component analysis (PCA) and eigenvalues.Findings: In the context of CMPs, stage one outcomes delivered a conceptualisation of LeanIPD&GID, a proposed competency framework and FOW global initiatives. Stage two concluded that the most significant KDs are “collaboration in design, construction works and engineering management,” “coordination and planning of construction work,” “senior organisational management support,” “boosting implementation of LC, and integrating project delivery” and “earlier and precise 3D visualisation of designs”. building information modelling (BIM) adoption in the MENA region is higher than LC; the second is still taking its first steps, while IPD has little implementation. LeanBIM is slightly integrated, while LeanIPD integration is almost not present.Originality/value: The research findings, conceptualised LeanIPD&GID principles, a proposed competency framework and FOW global initiatives, provided future research streams and directions; the study has provided a competency framework and FOW global initiatives for effective practical strategies for enhancing integration of LeanIPD&GID transformative initiatives on CMPs and will allow project key stakeholders to place emphasis on boosting LeanIPD&GID KDs.

1 January 2020
Verified
Journal Article
Closed access
PDF file
MEMartin Evans
Martin Evans
P.Peter ..
Peter ..
E.Emad ..
Emad ..
A.Ayman ..
Ayman ..
AEAshraf Elhendawi
Ashraf Elhendawi
AMAyman Mashali
Ayman Mashali
Construction mega-projects are typically associated with cost overruns and time delays due to conflicts of interest between diverse stakeholders. This research investigates the influence of the partnering approach and the adoption of Design and Build (D-B) contractual agreement on the behaviour of stakeholders on mega-projects. Through a case study, the significant factors that influence stakeholder management are appraised, such as cooperation, developing trust, and a dearth of communication. The research concluded that mutual trust, transparency, leadership, the well-defined scope of work, a clear definition of responsibilities, collaboration, and training are the main success factors of partnering projects. The research also emphasised that Building Information Modelling (BIM) plays a vital role to secure the mentioned key successful factors for partnering. Furthermore, BIM facilitates achieving project objectives with the adoption of D-B contracts. This research contributes to the developing body of knowledge addressing the application of partnering in construction. The outcomes of this research will be beneficial for clients, contractors, project managers, and contract managers when taking into account future execution plans for D-B projects. Forthcoming studies can develop a framework to combine various stakeholders to obtain optimum satisfaction.

17 January 2023 in Benchmarking: An International Journal
Verified
Journal Article
Closed access
MEMartin Evans
Martin Evans
PFPeter Farrell
Peter Farrell
Purpose: The modern construction industry is highly competitive and cost driven, with tangible adversarial relationships between projects' contractual parties at individual and organisational levels; there are conflict of interest as people to survive. Accordingly, team leaders on construction megaprojects (CMPs) in multinational engineering organisations strive to survive in such competitive markets. The research’s aim is to investigate relationships between team leaders' tenure and management styles towards professional subordinates on CMPs and elaborate how corporate governance can optimally address this conflict of interest and adversarial relationships.Design/methodology/approach: The research methodology adopted processes of inducting theory using case studies. A qualitative approach was adopted as a primary data collection and analysis source. It involved case studies through primary data collection in semi-structured face-to-face interviews with 38 professional subordinates (interviewees) to discuss impacts of team leaders' tenure on their management style (a five-team leader, case studies). The research methodology is based on building theories from case study grounded theory research methodologies.Findings: The research introduced the notion that team leader survival syndrome is pronounced and evidenced by adversarial reactions towards new or experienced professional subordinates where team leaders perceive professional subordinates, especially at senior technical levels, as potential risks that jeopardise their positions and employment survival possibilities. The syndrome is proven based on real-life case studies; it is constant, tangible and serious disorder of attitudes and behaviours. Longer tenure stimulates and accelerates these phenomena and syndrome, with 58% of team leaders exhibiting such syndromes. Optimum employee tenure is between 7 and 10 years. Corporate governance provides good resolution practices.Research limitations/implications: The research implications are useful to construction industry and academia. However, the analysis is limited to the case studies considered in Canada and Qatar. Due to small sample size for both case studies and respondents to the questionnaire survey, it is recommended for future exploration to expand the scope of research to larger sample size and various demographic and geographical locations.Practical implications: Corporates should acknowledge the presence of team leader survival syndromes. They should thoroughly investigate sociopolitical relationships behind it and seek to understand consequences on professional subordinates. Corporates should also adopt a 360-degree feedback system; they should limit trust given to team leaders in this regard to responsible trust, to eliminate manipulation. Team leaders are perceived as being not always truthful and misrepresent capabilities and performance of their professional subordinates to senior managers. Corporate governance holistic multidimensional perspectives are required to provide resolutions of team leader survival syndromes.Originality/value: The research has discovered a phenomenon that team leaders on CMPs in architecture, engineering and construction (AEC) organisations, prompted by virtue of long tenure in corporates or by power of their managerial level in organisations, perceive their professional subordinates, especially senior technical employees, as potential risks. It is thought promoting them would put their own positions and security of tenure at risk. Hence, team leaders act adversarially, to enhance their own survival prospects. This research introduced the novel team leader survival syndrome and introduced analyses, practical implications and recommendations.