Adel Francis

Prof. Dr. Adel Francis


Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2017 in Journal of Construction Engineering and Management
Verified
Journal Article
Open access
Adel FrancisAdel Francis
Adel Francis
&S& Sol; Spanph& Period; D& Period;<& Sol; Span
& Sol; Spanph& Period; D& Period;<& Sol; Span
The more complex a project, the more attractive nontraditional project delivery methods like design-build or fast-tracking become with these delivery methods and uncertainty has to be explicitly integrated into the network calculations. Uncertainties assess levels of compliance with various constraints. This paper contributes to the existing body of knowledge by modeling diverse types of execution uncertainties, such as construction operation, execution process, and work with doubtful results, and by extending the traditional logic and modeling uncertainties using the chronographic time-scaled, point-to-point relations, production-based dynamic relations, and function dependencies between in-progress activities. The dependencies between activities can be related to the external scale (usually representing time) or an internal scale (usually representing quantity). Using the Monte Carlo simulation, the paper simulates the impact of construction operations, execution processes, and work with doubtful results. For companies, this approach represents scheduling constraints in a flexible manner and provides a feasible solution for modeling the complexity of real-world projects.

1 April 2020 in Automation in Construction
Verified
Journal Article
Closed access
TMThibault Mazars
Thibault Mazars
Adel FrancisAdel Francis
Adel Francis

1 December 2006 in Canadian Journal of Civil Engineering
Verified
Journal Article
Closed access
Adel FrancisAdel Francis
Adel Francis
EMEdmond Miresco
Edmond Miresco
Generally, the utilization of traditional scheduling methods represents a complex and cumbersome task for most project managers. Using the existing tools often requires long preparation, and the quality of the graphical output of the planning job is suboptimal. The lack of accuracy in the representation of the execution process diminishes the reliability of the schedule. This article proposes a new planning approach that that can simulate the real conditions of projects. The concepts of graphical scheduling models are analyzed to position the new chronographic approach among other graphical scheduling techniques. The theoretical concept, the mathematical model, and the graphical approach for this new planning method are summarized. Among other features, the proposed chronographic method allows the internal division of activities and relationships as a function of quantities, and new realistic types of floats are proposed. The output may be represented on numerous levels of hierarchical detail or as a combination of these levels. The result is modeling that produces improved visual clarity, increased flexibility, and more adaptability to changes for construction projects.Key words: planning, scheduling, modeling, time-scaled, chronographic method, Gantt, critical path method, precedence.

5 August 2020 in Frontiers in Built Environment
Verified
Journal Article
Open access
PDF file
FAFabian Ardila
Fabian Ardila
Adel FrancisAdel Francis
Adel Francis
Recently, new methods and technologies, including building information modeling (BIM) and lean management, have been introduced to the construction industry. Their objectives are to increase collaboration, ensure smooth flows of information, improve productivity, reduce different types of waste, and stabilize production. These constraints have forced the industry to gradually change by applying more adapted operational processes and contractual models that focus on value and by integrating the design, construction, and operation phases. Traditional scheduling methods based on activities modeling have become less adapted to this new reality. As a result, complementary concepts have emerged, particularly the Last Planner system, takt time, space planning, and spatiotemporal scheduling. This paper presents an extensive review and an assessment of the state of the art of the spatiotemporal planning of construction projects. The paper categorizes the research efforts, presents a timeline of the most significant scientific developments in this domain, and addresses their possible impacts on the construction industry.

2 April 2019 in Frontiers in Built Environment
Verified
Journal Article
Open access
PDF file
Adel FrancisAdel Francis
Adel Francis
The arrival of building information modeling and four-dimensional (4D) simulation is forcing the construction industry to adapt its contractual, operational, and technical modes. Currently, the 4D simulation model is either a bar chart or a linear diagram. Both methods are unsuitable for modeling building projects, as showing the work sequence, circulation, and supply flow between sites is difficult. Spatiotemporal planning is more suitable as a scheduling model, as it considers activities, resources, and spaces simultaneously. However, most of the optimization process based on space planning uses deterministic or stochastic optimization techniques, and these techniques are not viable enough to apply to building construction schedules. The number of parameters is too important for one to consider using algorithmic optimization only. Therefore, this paper proposes a hybrid solution based on spatiotemporal techniques that combine graphical, procedural, and algorithmic aspects. The integration of spaces and operations ensures the continuity of use of spaces and teams, as well as linear production. An approach that prioritizes the critical space on the critical path of activities is proposed.