Amr M. A. Moussa

Dr. Amr M. A. Moussa

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2021 in Engineering Structures
Verified
Journal Article
Closed access
Amr M. A. MoussaAmr M. A. Moussa
Amr M. A. Moussa
MFMohamed F.M. Fahmy
Mohamed F.M. Fahmy
ZWZhishen Wu
Zhishen Wu

3 December 2024 in Engineering Structures
Verified
Journal Article
Closed access
Amr M. A. MoussaAmr M. A. Moussa
Amr M. A. Moussa
HSHemdan O.A. Said
Hemdan O.A. Said
FKFarag Khodary
Farag Khodary
YHYahia A. Hassanean
Yahia A. Hassanean

16 March 2024 in Structures
Verified
Journal Article
Closed access
MMMaha R.I. Mahmoud
Maha R.I. Mahmoud
XWXin Wang
Xin Wang
MAMohamedelmujtaba Altayeb
Mohamedelmujtaba Altayeb
HAHaithm A.M. Al-Shami
Haithm A.M. Al-Shami
YAYahia M.S. Ali
Yahia M.S. Ali
Amr M. A. MoussaAmr M. A. Moussa
Amr M. A. Moussa

5 June 2025 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
Amr M. A. MoussaAmr M. A. Moussa
Amr M. A. Moussa
XWXin Wang
Xin Wang
MFMohamed F.M. Fahmy
Mohamed F.M. Fahmy
ZWZhishen Wu
Zhishen Wu
YAYahia M.S. Ali
Yahia M.S. Ali

12 October 2022 in Advances in Structural Engineering
Verified
Journal Article
Closed access
MFMohamed Fm Fahmy
Mohamed Fm Fahmy
Amr M. A. MoussaAmr M. A. Moussa
Amr M. A. Moussa
ZWZhishen Wu
Zhishen Wu
The aim of this paper is to make a comprehensive evaluation of existing works on precast bridge piers, considering several aspects including construction techniques, structural systems, and seismic response. The general classification of the construction techniques refers to five different construction systems, which can be fully precast (post-tensioned system, pre-tensioned system, non-prestressed system) or partially precast techniques (post-tensioned system, non-prestressed system). The details of columns, column-footing connection, and column-beam connection are carefully studied to provide a unified classification of the existing construction techniques. According to the available experimental research, the failure modes and seismic resisting mechanisms of the classified construction techniques are fully addressed. In the light of a new proposed mechanical model, the seismic response of 50 experimentally tested precast bridge piers (covering the five construction techniques) is evaluated to ensure the required resiliency under anticipated seismic hazards. The evaluation of the seismic response of the studied systems indicated that the fully precast post-tensioned system is a promising construction technique, which can ensure the resilience performance of bridge piers. Finally, performance levels of the five construction systems were extracted in view of the possibility to realize robust, redundant, and recoverable structure systems that can be a motivation for application in the construction of modern sustainable cities.

14 June 2024 in Structures
Verified
Journal Article
Closed access
YAYahia M.S. Ali
Yahia M.S. Ali
XWXin Wang
Xin Wang
GHGuo Huawei
Guo Huawei
SLShui Liu
Shui Liu
LDLi Da
Li Da
Amr M. A. MoussaAmr M. A. Moussa
Amr M. A. Moussa