Andy J. Figueroa Avila

Mr. Andy J. Figueroa Avila

Universitat Politècnica de València, Valencia, Spain
orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
Andy J. Figueroa AvilaAndy J. Figueroa Avila
Andy J. Figueroa Avila
Raul PolerRaul Poler
Raul Poler
BNBeatriz Andres Navarro
Beatriz Andres Navarro
This work presents a mixed-integer linear programming (MILP) model to solve the production rescheduling problem in a job shop manufacturing system impacted by unexpected events, aiming to minimize production costs and disruptions to the initial schedule. The approach begins by generating an optimal production plan through batch assignments to machines. When unforeseen events, such as machine breakdowns or raw material shortages, occur, a dynamic rescheduling process is triggered, employing an iterative and reactive algorithm to adapt the plan to the real-time conditions on the shop floor. The results demonstrate that this rescheduling method efficiently adjusts to the new conditions while minimizing deviations from the original schedule, achieving solutions within acceptable computational times.


31 July 2026 in Computers & Industrial Engineering
Verified
Journal Article
Open access
Andy J. Figueroa AvilaAndy J. Figueroa Avila
Andy J. Figueroa Avila
BNBeatriz Andres Navarro
Beatriz Andres Navarro
Raul PolerRaul Poler
Raul Poler

31 December 2025 in Dirección y Organización
Verified
Journal Article
Open access
PDF file
Andy J. Figueroa AvilaAndy J. Figueroa Avila
Andy J. Figueroa Avila
Raul PolerRaul Poler
Raul Poler
BNBeatriz Andres Navarro
Beatriz Andres Navarro
This paper proposes a Mixed Linear Programming Model (MILP) to address the production rescheduling problem in a job shop type manufacturing system subject to unexpected events, with the objective of minimizing production costs and scheduling changes. Initially, an optimal production plan is calculated by assigning batches to machines. Subsequently, dynamic rescheduling is executed in response to events such as breakdowns or raw material shortages. In the event of a machine breakdown, parts of the plan are set to remain unchanged during rescheduling, ensuring that production of products already in progress is not affected. In case of raw material shortages, the option to defer production batches or make urgent material purchases is incorporated to avoid significant delays, thus adapting the plan to the current state of the shop floor through an iterative and reactive approach algorithm. The results show that rescheduling finds an efficient solution that adjusts to the new conditions, minimizing changes with respect to the initial plan in an acceptable computational time.

1 March 2026 in INTED Proceedings
Verified
Conference Paper
Closed access
PDF file
Andy J. Figueroa AvilaAndy J. Figueroa Avila
Andy J. Figueroa Avila
Raul PolerRaul Poler
Raul Poler
BNBeatriz Andres Navarro
Beatriz Andres Navarro
AGAna Isabel Mojica García
Ana Isabel Mojica García