BABATUNDE OLUWASEUN AJAYI

Dr. BABATUNDE OLUWASEUN AJAYI

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 March 2024 in Heliyon
Verified
Journal Article
Open access
AIAdemola Ilesanmi
Ademola Ilesanmi
TITaiwo O. Ilesanmi
Taiwo O. Ilesanmi
BABATUNDE OLUWASEUN AJAYIBABATUNDE OLUWASEUN AJAYI
BABATUNDE OLUWASEUN AJAYI
Convolutional neural networks (CNNs) assume pivotal roles in aiding clinicians in diagnosis and treatment decisions. The rapid evolution of imaging technology has established three-dimensional (3D) CNNs as a formidable framework for delineating organs and anomalies in medical images. The prominence of 3D CNN frameworks is steadily growing within medical image segmentation and classification. Thus, our proposition entails a comprehensive review, encapsulating diverse 3D CNN algorithms for the segmentation of medical image anomalies and organs. This study systematically presents an exhaustive review of recent 3D CNN methodologies. Rigorous screening of abstracts and titles were carried out to establish their relevance. Research papers disseminated across academic repositories were meticulously chosen, analyzed, and appraised against specific criteria. Insights into the realm of anomalies and organ segmentation were derived, encompassing details such as network architecture and achieved accuracies. This paper offers an all-encompassing analysis, unveiling the prevailing trends in 3D CNN segmentation. In-depth elucidations encompass essential insights, constraints, observations, and avenues for future exploration. A discerning examination indicates the preponderance of the encoder-decoder network in segmentation tasks. The encoder-decoder framework affords a coherent methodology for the segmentation of medical images. The findings of this study are poised to find application in clinical diagnosis and therapeutic interventions. Despite inherent limitations, CNN algorithms showcase commendable accuracy levels, solidifying their potential in medical image segmentation and classification endeavors.

10 February 2022 in Frontiers in Built Environment
Verified
Journal Article
Open access
BABATUNDE OLUWASEUN AJAYIBABATUNDE OLUWASEUN AJAYI
BABATUNDE OLUWASEUN AJAYI
TCThanwadee Chinda
Thanwadee Chinda
Project delay has been a phenomenon contending with the construction sector opposing time, cost, and quality. This study develops a model, which is a combination of two mathematical decision-making methods DEMATEL and system dynamics modeling, to investigate the impact of the factors on the entire project schedule. The simulation results reveal the importance of minimizing design error to reduce the project delay at the beginning (or preconstruction stage) of the project. Rework, design changes, and change orders must also be closely monitored during the construction to ensure work productivity and on-time project completion. The results also reveal that experienced designers and the use of updated design technology help reduce design errors, thus enhancing work performance in the long term. As shown in the simulation results, the actual project completion time and magnitude of delay steadily reduce with the project series. This explains the fact that the more the consistency and effectiveness in handling the delay factors as similar projects are performed in turns, the better the project performance in terms of time. Therefore, careful consideration of the delay factors reduces the time lag and delay magnitude in construction projects. Other improvements, such as effective supervision during construction which is a function of experienced supervisors, good project management, and cooperation among key stakeholders, including owners, consultants, and contractors, also assist in reducing the construction delay in the long term.

1 April 2019 in Defect and Diffusion Forum
Verified
Journal Article
Closed access
PDF file
KAK.S. Adegbie
K.S. Adegbie
DSDamilare Samuel
Damilare Samuel
BABATUNDE OLUWASEUN AJAYIBABATUNDE OLUWASEUN AJAYI
BABATUNDE OLUWASEUN AJAYI
This study extends previous investigation on ohmic heating of magnetohydrodynamic viscous fluid flow over a continuous moving plate to include radiative heat-loss, viscous dissipation and buoyancy effects. The mathematical formulation representing the modified physical model involves a system of three partial differential equations, which are transformed into a system of two coupled non-linear ordinary differential equations using suitable dimensionless variables. Thereafter, the resulting dimensionless system of equations governing modified model are solved via Homotopy Analysis Method (HAM). The accuracy and convergence of solutions are validated by comparing the results obtained with those in literature and they are in good agreement. Parametric study is performed to illustrate the effects of emerging parameters on fluid velocity and temperature, skin friction coefficient and Nusselt number. It is found that the impacts of pertinent parameters due to the extensions are significant and these are presented in graphs and tables. The results indicate that the skin friction coefficient and the heat transfer rate increase with the increasing values of thermal radiation and decrease with the increasing value of viscous dissipation parameter.

25 July 2025 in Scientific Reports
Verified
Journal Article
Open access
BABATUNDE OLUWASEUN AJAYIBABATUNDE OLUWASEUN AJAYI
BABATUNDE OLUWASEUN AJAYI
MBMayowa Emmanuel Bamisaye
Mayowa Emmanuel Bamisaye
HMHugo Miguel Magalhães Macedo
Hugo Miguel Magalhães Macedo
ISIssara Sereewatthanawut
Issara Sereewatthanawut
The construction sector's substantial contribution to climate change has raised significant environmental concerns, particularly regarding building demolitions-a major source of environmental degradation. As a critical phase within the construction lifecycle, the demolition process involves numerous interrelated variables, such as housing units, and demolition tools employed. Therefore, a comprehensive analysis of these factors is crucial for mitigating environmental impact. This study integrates System Dynamics (SD) modeling with the Random Forest (RF) algorithm to analyze the relationships among key variables and assess the overall environmental impacts of different demolition tool combinations (OEIC1, OEIC2, OEIC3, and OEIC4). The RF algorithm validates the SD model, while sensitivity analysis enhances robustness. The RF model shows strong predictive accuracy, with R-squared values of 0.9776 to 0.9990 and mean squared errors between 0.0003 and 0.0356. Among the combinations, OEIC4-comprising a demolition robot and hydraulic splitter-proves to be the most environmentally sustainable, producing impacts up to four times lower than the others. The analysis also finds that shorter demolition durations substantially reduce environmental impact. This integrated framework provides a novel method for assessing demolition-related environmental impacts. This approach contributes to circular economy principles, reduces pollution and waste, and aligns with global climate change mitigation goals.

15 July 2025 in Resources, Conservation & Recycling Advances
Verified
Journal Article
Open access
MBMayowa Emmanuel Bamisaye
Mayowa Emmanuel Bamisaye
BABATUNDE OLUWASEUN AJAYIBABATUNDE OLUWASEUN AJAYI
BABATUNDE OLUWASEUN AJAYI
ISIssara Sereewatthanawut
Issara Sereewatthanawut

1 June 2022 in Engineering Management in Production and Services
Verified
Journal Article
Open access
PDF file
BABATUNDE OLUWASEUN AJAYIBABATUNDE OLUWASEUN AJAYI
BABATUNDE OLUWASEUN AJAYI
TCThanwadee Chinda
Thanwadee Chinda
Project completion behind schedule is a struggle for the construction sector, affecting time, cost, and quality. This investigation has been necessitated by the lingering nature of project delay risks despite many extant analyses. This study collated expert opinions from the Thai construction sector on salient construction delay variables and their influence on each other for DEMATEL-SD analysis. The collated data were analysed and found consistent with a Cronbach’s alpha of 0.939. Then, the DEMATEL technique was used to establish the influence weight of factors for the System dynamics (SD) analysis. It was discovered that minimising the design error at the preconstruction stage significantly reduces the magnitude of delay. Increasing values of design error and change order increase the rework profile. Besides, the project delivery within the scheduled 232 weeks can be ensured by minimising the threat of design error, design change, change order, rework, productivity problem, and by improving project management. This study adopted a hybrid mathematical system to holistically examine the construction delay risk by comprehensively exploring the dynamics of influencing variables and investigating their impact on the project scheme. The system helps project stakeholders to arrive at an effective decision in overcoming delay risks, thus minimising the cost overrun and improving the project quality.