David Oloke

Prof. David Oloke

orcid

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2012 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
EIElias Ikpe
Elias Ikpe
FHFelix Hammon
Felix Hammon
DODavid Oloke
David Oloke
Construction is the most dangerous land-based work sector in Europe and the United States The cost of accidents has received much attention in the recent past, and online interactive tools were developed to assess the cost of accidents to organizations. Online tools and other sources of information on costs of accidents in the construction industry were a useful development but failed to support the decision-making process in regard to construction health and safety measures. A cost-benefit analysis (CBA) methodology is presented that would enable contractors to assess the true cost of accidents prevention and the associated benefits of accident prevention as part of pre- and postcontract project evaluation. The research investigated the cost and benefit of accident prevention, with a view to drawing attention to the economic consequences of effective/ineffective management of health and safety by contractors. A quantitative research methodology was employed in investigating these costs and benefi...

26 January 2021 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
DADahiru Abdullahi
Dahiru Abdullahi
SRSuresh Renukappa
Suresh Renukappa
SSSubashini Suresh
Subashini Suresh
DODavid Oloke
David Oloke
Purpose: Despite the abundant renewable energy potential in the Nigeria, the power-sector stakeholder has not paid attention to the prospect of the natural resources that can be accrued when it is properly harnessed. Although a very negligible fraction of the population has invested in solar photovoltaics (PVs) for home solution, the initiative was only made public commercialised under the public-private partnership (PPP) and the objectives of the Power Sector Reform Act. 2005. It is, therefore, aimed to investigate the causes and insight of the barriers that are responsible for the slow implementation of the solar energy initiative in the Nigeria.Design/methodology/approach: An empirical study was performed in the Nigeria. The study was conducted qualitatively, through semi-structured face-to-face interviews of 25 participants. The interviews were recorded, transcribed, interpreted, coded, categorised into themes and analysed by content analysis.Findings: The study reveals technological, financial, political and social barriers have been the reason for slowing down solar energy development in Nigeria. While the technical barrier is a challenge to the solar energy implementation, socio-cultural issues have also been an obstacle to the implementation process. It is suggested that, the stakeholders of the initiative endeavour to proffer sustainable policies to enable public and private promoters to be able to generate and distribute electricity through solar PV and to complement the inadequate conventional electricity sources from the grids.Originality/value: The paper provides a richer insight into the understanding and awareness of barriers for implementing solar energy strategies in Nigeria.

1 August 2017 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
DAD Abdullahi
D Abdullahi
SSSubashini Suresh
Subashini Suresh
SRSuresh Renukappa
Suresh Renukappa
DODavid Oloke
David Oloke
Nigeria, potentially, has abundant sunshine throughout the year, making it full thirst for solar energy generation. Even though, the country's solar energy projects have not realised a fair result over the years, due to many barriers associated with initiatives implementation. Therefore, the entire power sector remains incapacitated to generate, transmit and distribute a clean, affordable and sustainable energy to assist economic growth. The research integrated five African counterpart's solar energy initiatives, barriers, policies and strategies adopted as a lesson learned to Nigeria. Inadequate solar initiative's research, lack of technological knowhow, short-term policies, lack of awareness and political instability are the major barriers that made the implementation of solar initiatives almost impossible in Nigeria. The shock of the barriers therefore, constitutes a major negative contribution to the crippling of the power sector in the state. Future research will concentrate on initiatives for mitigating solar and other renewable energy barriers.

9 May 2020 in Journal of Engineering, Design and Technology
Verified
Journal Article
Closed access
TMTochukwu Moses
Tochukwu Moses
DHDavid Heesom
David Heesom
DODavid Oloke
David Oloke
Purpose: The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects.Design/methodology/approach: To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework.Findings: Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information.Practical implications: This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required.Originality/value: By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented.

1 November 2002 in International Journal of Project Management
Verified
Journal Article
Closed access
FSFemi Sonuga
Femi Sonuga
OAObi Aliboh
Obi Aliboh
DODavid Oloke
David Oloke

14 July 2021
Verified
Conference Paper
Closed access
PDF file
JGJosé A. Marte Gómez
José A. Marte Gómez
EDEmmanuel I. Daniel
Emmanuel I. Daniel
YFYanqing Fang
Yanqing Fang
DODavid Oloke
David Oloke
LGLouis Gyoh
Louis Gyoh