Esmaeil Nejatyan

Dr. Esmaeil Nejatyan


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Esmaeil NejatyanEsmaeil Nejatyan
Esmaeil Nejatyan
Hadi SarvariHadi Sarvari
Hadi Sarvari
SHSeyed Abbas Hosseini
Seyed Abbas Hosseini
HJHassan Javanshir
Hassan Javanshir
Proper planning and management of construction projects have long been regarded as a necessity. The ability to make sound decisions and solve problems using appropriate performance reports related to the project implementation process are the two most key factors in controlling the performance of construction project management. Even though these factors considerably contribute to controlling precise project performance, previous research has failed to investigate them to their fullest potential. Therefore, this research seeks to fill the existing gap by determining the influential factors on construction project management performance through earned value-based value engineering strategy. In this line, a comprehensive literature analysis was undertaken to extract the influential factors on construction project management performance. Then, three rounds of a Delphi survey were conducted to consolidate the influential factors. There were a total of 39 factors that were grouped into four categories. The identified influential factors were then evaluated through the analysis of quantitative data. The findings showed that the dimension of “Engineering economics” was ranked first in terms of importance, followed by “Project management performance”, “Value engineering approach”, and “Earned value management” at the second to fourth ranks, respectively. The overall ranking of the factors placed “Project Stakeholder Management” in the first position and “Project Management Software” in the bottom place. It is anticipated that the key findings and effective recommendations of this study will considerably contribute to the improvement of decisions on project planning and improve the performance of construction project management while enhancing different stakeholders’ understanding of the most influential factors on the performance of construction project management.

24 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Esmaeil NejatyanEsmaeil Nejatyan
Esmaeil Nejatyan
Hadi SarvariHadi Sarvari
Hadi Sarvari
SHSeyed Abbas Hosseini
Seyed Abbas Hosseini
HJHassan Javanshir
Hassan Javanshir
This study was carried out to rank and prioritize the aspects that have been shown to have an impact on the improvement of construction project management (CPM) performance based on value engineering. This analysis was carried out with the Iranian construction industry’s current situation in mind. The respondents and the Delphi panel were chosen from among Iranian managers and project management professionals with a focus on building projects. These professionals had more than 20 years of experience working on international projects, and in addition to their expertise in project management, they also understood the principles of earned value analysis and value engineering. Thus, the components extracted from the literature review were used as the basis for designing a structured interview based on 39 important effective components previously determined as identified factors. The questionnaires were distributed among the experts, and the returned questionnaires were analysed using the SWARA technique to rank the weight and importance of the factors. Using the SWARA method, the opinions of the expert panel members consisting of 20 engineers and a semi-structured questionnaire was used to gather expertise in project management and managers, with a focus on Iranian CPM. As shown by the results, stakeholder management, time value of money, and worth, allocated the first to the third rank to themselves with respective weights of 0.104, 0.103, and 0.087. The sub-criteria of cost objective, function objective, and value objective were in the 37th to 39th ranks with respective weights of 0.00050, 0.00033, and 0.00021.