Felipe T. Muñoz

Dr. Felipe T. Muñoz

Dept. of Industrial Engineering, University of Bío-Bío, Concepción, Biobío, Chile
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 September 2024 in IEEE Access
Verified
Journal Article
Open access
MRMario Ramos
Mario Ramos
FMFelipe T. Muñoz
Felipe T. Muñoz
PMPablo Mora
Pablo Mora
Diego VenegasDiego Venegas
Diego Venegas
The production planning problem in the Pinus radiata sawmill industry revolves around determining how to cut a set of logs of different diameters to obtain pieces with a rectangular base, typically of the same length as the original log. The primary objective is often to maximize the volumetric yield or the ratio between the total volume of the produced pieces and the available volume of the logs. Given the scarcity of timber forests, small-and medium-sized (SME) sawmills must optimize their operations to maximize the volumetric yield of logs, usually procured from third parties and may vary in quality and dimensions. In this context, the absence of decision support tools directly contributes to inefficient raw material utilization, consequently impacting the business’s profit. This study introduces a multi-objective mixed-integer linear programming model incorporating log availability and product demand as input parameters. The objective functions aim to minimize the total volumetric loss of utilized logs and the surplus quantity associated with products exceeding demand. The model integrates cutting patterns pre-determined for each log diameter as an additional input. The Cutlog© software was used to identify all the optimal cutting patterns. The ε-constraint method, implemented in the CPLEX© solver, was employed to solve the model. The model was validated using representative instances designed to emulate the challenges faced by SME sawmills. Real industry data, surveys, and commercial records from SME sawmills in southern Chile were utilized. The results confirm the effectiveness of the proposed model in addressing the multi-objective challenges encountered by these businesses. The model successfully identifies multiple solutions on the Pareto frontier, offering valuable insights for decision-making.

28 May 2025 in Mathematics
Verified
Journal Article
Open access
PDF file
FMFelipe T. Muñoz
Felipe T. Muñoz
JUJuan Ulloa-Navarro
Juan Ulloa-Navarro
This study addresses the multi-period, multi-item, single-stage capacitated lot sizing problem (CLSP) in a parallel machine environment with machine eligibility constraints under a make-to-order production policy. A mixed-integer linear programming (MILP) model is developed to minimize total operational costs, including production, overtime, extra shifts, inventory holding, and backorders. The make-to-order setting introduces additional complexity by requiring individualized customer orders, each with specific due dates and product combinations, to be scheduled under constrained capacity and setup requirements. The model’s performance is evaluated in the context of a real-world production planning problem faced by a manufacturer of cold-formed steel profiles. In this setting, parallel forming machines process galvanized sheets of cold-rolled steel into a variety of profiles. The MILP model is solved using open-source optimization tools, specifically the HiGHS solver. The results show that optimal solutions can be obtained within reasonable computational times. For more computationally demanding instances, a runtime limit of 300 s is shown to improve solution quality while maintaining efficiency. These findings confirm the viability and cost-effectiveness of free software for solving complex industrial scheduling problems. Moreover, experimental comparisons reveal that solution times and performance can be further improved by using commercial solvers such as CPLEX, highlighting the potential trade-off between cost and computational performance.

30 September 2020 in Mathematical Programming
Verified
Journal Article
Closed access
PDF file
JCJosé R. Correa
José R. Correa
FMFelipe T. Muñoz
Felipe T. Muñoz

1 March 2022 in RAIRO - Operations Research
Verified
Journal Article
Open access
PDF file
FMFelipe T. Muñoz
Felipe T. Muñoz
APAlejandro A. Pinochet
Alejandro A. Pinochet
We study the worst case performance guarantee of locally optimal solutions for the problem of scheduling jobs on uniformly related parallel machines with the objective of minimizing the total weighted completion time. The quality of locally optimal solutions under the jump neighborhood is analyzed, which consists of iteratively moving a single job from one machine to another, improving the total weighted completion time in each iteration and stopping once improvement is no longer possible. We propose an upper bound for the total weighted completion time for the solutions obtained by this local search, and upper and lower bounds for the performance guarantee of the obtained locally optimal solutions. Additionally, the case of identical parallel machines is analyzed.

12 March 2024 in RAIRO - Operations Research
Verified
Journal Article
Open access
FMFelipe T. Muñoz
Felipe T. Muñoz
MPMarco A. Parra
Marco A. Parra
This article investigates the efficiency of Nash equilibria in a utilitarian scheduling game, where each job, acting as an agent, strategically selects a machine for its processing. The study focuses on a uniform parallel machine environment, employing the Weighted Shortest Processing Time rule as the local policy and the total weighted completion time as the social goal. We establish upper and lower bounds for the Price of Anarchy, offering valuable insights for this scheduling game.

19 December 2023 in Mathematics
Verified
Journal Article
Open access
PDF file
FMFelipe T. Muñoz
Felipe T. Muñoz
GLGuillermo Latorre-Núñez
Guillermo Latorre-Núñez
MRMario Ramos
Mario Ramos
This study investigates the worst-case performance guarantee of locally optimal solutions to minimize the total weighted completion time on uniformly related parallel machines. The investigated neighborhood structure is Jump, also called insertion or move. This research focused on establishing the local optimality condition expressed as an inequality and mapping that maps a schedule into an inner product space so that the norm of the mapping is closely related to the total weighted completion time of the schedule. We determine two new upper bounds for the performance guarantee, which take the form of an expression based on parameters that describe the family of instances: the speed of the fastest machine, the speed of the slowest machine, and the number of machines. These new bounds outperform the parametric upper bound previously established in the existing literature and enable a better understanding of the performance of the solutions obtained for the Jump neighborhood in this scheduling problem, according to parameters that describe the family of instances.