Guanghua Wu

Mr. Guanghua Wu

Center for Mathematics and Physics, Weifang University of Science and Technology, Weifang, Shandong, China

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 June 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
HZHongli Zhu
Hongli Zhu
CLCongcong Liu
Congcong Liu
GWGuanghua Wu
Guanghua Wu
YGYanjun Gao
Yanjun Gao
This paper investigates the cold chain logistics network design in the first mile for fresh agricultural products with government subsidy, involving the capacity, location of cold storage facilities, and transportation from production areas to cold storage facilities after harvest. A bi-level programming model is formulated considering the quality degradation of fresh agricultural products. Based on the proposition and KKT conditions, a solution method is designed for reformulating the bi-level model into a single-level programming model. Numerical experiments are conducted to verify the proposed model. Experimental results show that the solution method efficiently solves the problem of the cold chain logistics network design for fresh agricultural products with subsidy, and sensitivity analysis provides managerial insights for decision-makers.

24 November 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
GWGuanghua Wu
Guanghua Wu
HZHongli Zhu
Hongli Zhu
In this paper, we investigate a rescheduling problem with rejection and an operator non-availability period on a single machine. An optimal original schedule with the objective of minimizing the total weighted completion time has been made in a deterministic production scheduling system without an unavailable interval. However, prior to the start of formal job processing, a time interval becomes unavailable due to the operator. No jobs can start or complete in the interval; nonetheless, a job that begins prior to this interval and finishes afterward is possible (if there is such a job, we call it a crossover job). In order to deal with the operator non-availability period, job rejection is allowed. Each job is either accepted for processing or rejected by paying a rejection cost. The planned original schedule is required to be rescheduled. The objective is to minimize the total weighted completion time of the accepted jobs plus the total penalty of the rejected jobs plus the weighted maximum tardiness penalty between the original schedule and the new reschedule. We present a pseudo-polynomial time dynamic programming exact algorithm and subsequently develop it into a fully polynomial time approximation scheme.

1 January 2024 in Computer Modeling in Engineering & Sciences
Verified
Journal Article
Open access
PDF file
ZBZiqiang Bai
Ziqiang Bai
Wenzhen QuWenzhen Qu
Wenzhen Qu
GWGuanghua Wu
Guanghua Wu
In the past decade, notable progress has been achieved in the development of the generalized finite difference method (GFDM). The underlying principle of GFDM involves dividing the domain into multiple sub-domains. Within each sub-domain, explicit formulas for the necessary partial derivatives of the partial differential equations (PDEs) can be obtained through the application of Taylor series expansion and moving-least square approximation methods. Consequently, the method generates a sparse coefficient matrix, exhibiting a banded structure, making it highly advantageous for large-scale engineering computations. In this study, we present the application of the GFDM to numerically solve inverse Cauchy problems in two- and three-dimensional piezoelectric structures. Through our preliminary numerical experiments, we demonstrate that the proposed GFDM approach shows great promise for accurately simulating coupled electroelastic equations in inverse problems, even with 3% errors added to the input data.