Hafiz Kamran Jalil Abbasi

Mr. Hafiz Kamran Jalil Abbasi


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 July 2024 in Journal of Arid Environments
Verified
Journal Article
Closed access
HKHussain Masood Khan
Hussain Masood Khan
MAMuhammad Fahim Aslam
Muhammad Fahim Aslam
MWMuhammad Waseem
Muhammad Waseem
Hafiz Kamran Jalil AbbasiHafiz Kamran Jalil Abbasi
Hafiz Kamran Jalil Abbasi
AIAli Iftikhar
Ali Iftikhar
FHFaraz Ul Haq
Faraz Ul Haq

17 December 2021 in Hydrology
Verified
Journal Article
Open access
PDF file
MSMuhammad Kaleem Sarwar
Muhammad Kaleem Sarwar
Muhammad Atiq Ur Rehman TariqMuhammad Atiq Ur Rehman Tariq
Muhammad Atiq Ur Rehman Tariq
Rashid FarooqRashid Farooq
Rashid Farooq
Hafiz Kamran Jalil AbbasiHafiz Kamran Jalil Abbasi
Hafiz Kamran Jalil Abbasi
FHFaraz ul Haq
Faraz ul Haq
Nitin MuttilNitin Muttil
Nitin Muttil
Shock waves are generated downstream of spillways during flood operations, which have adverse effects on spillway operations. This paper presents the physical model study of shock waves at the Mohmand Dam Spillway project, Pakistan. In this study, hydraulic analysis of shock waves was carried out to investigate its generation mechanism. Different experiments were performed to analyze the rooster tail on a flat spillway chute and to examine the factors affecting the characteristics of the rooster tail. The study results show that shock wave height is influenced by spillway chute slope, pier shape, and flow depth. Moreover, the height of the shock wave can be minimized by installing a semi-elliptical pier on the tail part of the main pier. Further modifications in the geometry of the extended tail part of the pier are recommended for the elimination of the shock wave. Based on observed data collected from the model study, an empirical equation was developed to estimate the shock wave height generated on the flat slope spillway chutes (5° to 10°).