Hossein Azizi Nadian

Mr. Hossein Azizi Nadian

University of Brescia, Brescia, Lombardy, Italy
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 October 2022 in River Research and Applications
Verified
Journal Article
Closed access
MSMaryam Shahabi
Maryam Shahabi
JAJavad Ahadiyan
Javad Ahadiyan
MGMehdi Ghomeshi
Mehdi Ghomeshi
MNMarjan Narimousa
Marjan Narimousa
CKChristos Katopodis
Christos Katopodis
HNHossein Azizi Nadian
Hossein Azizi Nadian

21 December 2024 in Water
Verified
Journal Article
Open access
PDF file
MSMohsen Sajjadi
Mohsen Sajjadi
SBSamireh Barihi
Samireh Barihi
Javad AhadiyanJavad Ahadiyan
Javad Ahadiyan
HNHossein Azizi Nadian
Hossein Azizi Nadian
MVMohammad Valipour
Mohammad Valipour
PKPoria Khedri
Poria Khedri
According to the World Health Organization (WHO), floods are one of the most important natural disasters in the world, resulting in the severe loss of human lives and intense destruction of infrastructure. The frequent floods in recent decades have caused most parts of Iran to be affected by periodic and destructive floods. Consequently, the casualties and financial losses of floods have increased significantly. The present study aims to investigate redesigning the fuse plug, emergency overflow, and flood system at Ramshir Dam, Iran. In this regard, using a two-dimensional mathematical model, floods with a return period of 10 and 100 years with different scenarios have been investigated. Four scenarios were analyzed, including the current situation, flood channel dredging scenario, flood channel overhaul scenario, and flood channel overhaul scenario with reservoir dredging. The results show the following: (1) The flood channel in its current state cannot even discharge flows lower than the design, i.e., 1400 m3/s, and the flow overflows from the embankments on its sides. (2) Also, the reservoir dredging prevents the failure of the second fuse plug in the 100-year return period (flow rate 4370 m3/s). (3) Discharge more than 2400 m3/s cubic meters led to the activation of the first fuse plug. (4) The present research findings are of particular and essential importance in flood management. (5) The results of this research were based on the rehabilitation and simulation of the diversion dam facilities in the control and conveyance of flood and on three factors of spillway, flood channel, and flood plain, and the correct function of the fuse plug was reviewed.

29 January 2024 in Results in Engineering
Verified
Journal Article
Open access
SHSaeed Hajialigol
Saeed Hajialigol
JAJavad Ahadiyan
Javad Ahadiyan
SSSeyed Mohsen Sajjadi
Seyed Mohsen Sajjadi
MHMohammad Azamathulla Hazi
Mohammad Azamathulla Hazi
ACAaron Anil Chadee
Aaron Anil Chadee
JKJames T. Kirby
James T. Kirby

6 December 2024 in Water
Verified
Journal Article
Open access
PDF file
MTMaryam Tahmasbipour
Maryam Tahmasbipour
HNHossein Azizi Nadian
Hossein Azizi Nadian
Javad AhadiyanJavad Ahadiyan
Javad Ahadiyan
Giuseppe OlivetoGiuseppe Oliveto
Giuseppe Oliveto
MSMohsen Sajjadi
Mohsen Sajjadi
AKAmir Mohammad Kiyani
Amir Mohammad Kiyani
Hydraulic jump is a phenomenon that occurs in open channels with a sudden and rapid transition of the flow regime from supercritical to subcritical. One of the common approaches in controlling the energy dissipation of hydraulic jumps aims to expand the section of the stilling basin with the development of T-jumps. However, T-jumps without additional baffle and terminal elements are unacceptable for thorough energy dissipation. Therefore, this study investigates the main characteristics of T-jumps in an abruptly expanding channel and in the presence of bed water jets and sinusoidal roughness elements. Such complex configurations are hardly found in the literature. Inflow Froude numbers from 6.2 to 10.85, five relative jet flow rates from 0.10 to 0.27, and three rough beds with roughness wave slopes from 0.33 to 0.60 were selected. Experimental results revealed that increasing the bed corrugation would decrease the length of the jump, the length of the roller, and the sequent depth ratio. The same results were found in presence of bed water jets and sinusoidal roughness elements, but the T-jump would appear to be better stabilized. In fact, it was also observed that increasing the relative flow rate of the jet had a significant effect in controlling the T-jump and reducing its relative length. The simultaneous presence of bed water jets and sinusoidal roughness elements decreased the relative length of the T-jump by about 81% and the tailwater depth by about 42% in comparison with the classic hydraulic jumps on smooth beds.

9 August 2024 in Water
Verified
Journal Article
Open access
PDF file
SCSaman Abbasi Chenari
Saman Abbasi Chenari
HNHossein Azizi Nadian
Hossein Azizi Nadian
Javad AhadiyanJavad Ahadiyan
Javad Ahadiyan
MVMohammad Valipour
Mohammad Valipour
Giuseppe OlivetoGiuseppe Oliveto
Giuseppe Oliveto
MSMohsen Sajjadi
Mohsen Sajjadi
This study investigates the problem of low efficiency and the lack of a water supply at the Hemmat Water Intake, in Iran, where severe sediment accumulation was observed at the intake mouth. The Flow-3D software was used to simulate the flow patterns under various scenarios of hydraulic regimentation works. The considered parameters include: (i) three alternative locations of the spur dike (i.e., a spur dike placed on the opposite side of the intake inlet and aligned with the upstream edge of the intake, to be regarded as a witness spur dike; a spur dike at a distance DS of 7 m downstream of the witness spur dike, which implies a dimensionless distance DS/bi1 of 1/3, with bi1 being the intake opening width; and a spur dike at a distance of 7 m upstream of the witness spur dike with a dimensionless distance, still, of 1/3); (ii) four spur dike lengths, LS/Br, with LS being the effective spur dike length and Br the approach river width; and (iii) five spur dike deviation angles of 75, 90, 105, 120, and 135 degrees (the deviation angle is the angle between the spur dike axis and the original river-bank line from which the spur dike extends). The results showed that, with the increase in the relative spur dike length (LS/Br), the velocity of the flow entering the water intake increases by 11%. A spur deviation angle of 135 degrees increases the flow depth at the intake inlet by 9% compared to a smaller deviation angle of 75 degrees. In addition, the spur dike increases the flow shear stresses at the intake inlet by up to 50%. Overall, the main flow of the river with the highest velocity and depth, and best directed towards the water intake, occurs for the placement of the longest spur dike (i.e., LS/Br = 0.46) in front of the inlet (i.e., witness spur dike) and for a spur dike deviation angle of 135 degrees. The spur dike increases the shear stress at the intake entrance by more than five times with respect to the case of its absence. In general, the presence of a spur dike on the opposite bank and with a deviation angle in the direction of the intake inlet well directs the main flow towards the canal intake. Moreover, it reduces the possibility of sedimentation in the canal inlet by increasing the flow velocity. Therefore, the results of this study could also be useful in increasing the hydraulic efficiency of lateral intakes by reducing the sedimentation phenomena.

1 September 2024 in Journal of Environmental Accounting and Management
Verified
Journal Article
Closed access
ISImiya Salahi
Imiya Salahi
JAJavad Ahadiyan
Javad Ahadiyan
YZYu-Hong Zeng
Yu-Hong Zeng
HNHossein Azizi Nadian
Hossein Azizi Nadian
MSMohsen Sajjadi
Mohsen Sajjadi