Jiawen Ye

Ms. Jiawen Ye


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 June 2025 in Mathematics
Verified
Journal Article
Open access
PDF file
JYJiawen Ye
Jiawen Ye
XMXulai Meng
Xulai Meng
Haiying WangHaiying Wang
Haiying Wang
QZQingdao Zhou
Qingdao Zhou
SASiwei An
Siwei An
Diego RossoDiego Rosso
Diego Rosso
Improving urban wastewater treatment efficiency and quality is urgent for most cities. The accurate wastewater flowrate forecast of a wastewater treatment plant (WWTP) is crucial for cutting energy use and reducing pollution. In this study, two hybrid models are proposed: ARIMA–Markov and ARIMA–LSTM–Transformer. Using 5 min-interval inlet flowrate data from a WWTP in 2024, the two models were verified and compared. Forecasts for 1 day, 7 days, and 2 months ahead were made, and model accuracies were compared. Ten repetitions with the same dataset assess stability, and ARIMA–LSTM–Transformer, with better performance, were selected. Then, the Whale Optimization Algorithm (WOA), Particle Swarm Optimization (PSO) algorithm, and Sparrow Search Algorithm (SSA) were used for optimization, with the WOA excelling in accuracy and stability. Experimental results show that compared to the single model Transformer, WOA–ARIMA–LSTM–Transformer did better in forecasting wastewater flowrate. The combined model enables efficient and accurate wastewater flowrate forecasting, highlighting the combined model’s application potential.