This experimental study proposes a conductive mortar to increase the efficiency of the sacrificial anode cathodic protection (SACP) system by decreasing resistivity and maintaining it for a long time. The resistivity characteristics of the mortar that contained electrically conductive admixtures and/or chemical agents were evaluated by the Brunauer–Emmett–Teller (BET) method and resistivity measurements. The conductive mortar with activated carbon and sodium hydroxide had the lowest resistivity. The SACP system was then designed to evaluate the cathodic protection (CP) performance with the proposed activated-carbon-based conductive mortar. The proposed conductive mortar contributed to lower CP potential and higher current density and depolarization potential than the general mortar.
This study explores the efficacy of a sacrificial anode cathodic protection (SACP) system with an activated carbon-based conductive mortar in bridge structures. In the previous Part 1 study, various admixtures were compared to identify a conductive mortar for enhancing the performance of the SACP system, assessed through electrical conductivity, resistivity, cathodic protection (CP) potential and current, and 4 h depolarization potential. Part 2 extends the investigation by applying the developed conductive mortar containing activated carbon to an SACP system on an actual bridge structure in which corrosion has already been initiated. Before CP installation, the physical properties of the conductive mortar were evaluated to satisfy the standard requirements for concrete structure maintenance. Subsequently, zinc mesh and bulk anodes were installed on the bridge pier, followed by the application of a conductive mortar with an admixture ratio of 5%. Over a four-year period, performance was measured through regular 4 h depolarization potential checks and visual inspections. The SACP system with the conductive mortar demonstrated superior CP performance compared to the general mortar, confirming the effectiveness of the developed conductive mortar. Visual inspection after four years confirmed the workability of the SACP system with conductive mortar.
28 February 2021 in Journal of Advanced Marine Engineering and Technology