Process optimization and improvement strategies applied in a crushing plant are coupled with the measurement of such improvements, and one of the indicators for improvements is the mass flow at different parts of the circuit. The estimation of the mass flow using conveyor belt power consumption allows for a cost-effective solution. The principle behind the estimation is that the power draw from a conveyor belt is dependent on the load on the conveyor, conveyor speed, geometrical design, and overall efficiency of the conveyor. Calibration of the power-based belt scale is carried out periodically to ensure the accuracy of the measurement. In practical implementation, certain conveyors are not directly accessible for calibration to the physical measurement as these conveyors have limited access or it is too costly to interrupt the ongoing production process. For addressing this limitation, a better strategy is needed to calibrate the efficiency of the power-based belt scale and maintain the reliability of such a system. This paper presents the application of an optimization method for a data collection system to calibrate and maintain accurate mass flow estimation. This includes calibration of variables such as the efficiency of the power-based belt scale. The optimization method uses an error minimization optimization formulation together with the mass balancing of the crushing plant to determine the efficiency of accessible and non-accessible conveyors. Furthermore, a correlation matrix is developed to monitor and detect deviations in the estimation for the mass flow. The methods are applied and discussed for operational data from a full-scale crushing plant.
There is a need within the production industry for digitalization and the development of meaningful functionality for production operation. One such industry is aggregate production, characterized by continuous production operation, where the digital transformation can bring operational adaptability to customer demand. Dynamic process simulations have the ability to capture the change in production performance of aggregate production over time. However, there is a need to develop cost-efficient methodologies to integrate calibrations and validation of models. This paper presents a method of integrating an experimental and data-driven approach for calibration and validation for crushing plant equipment and a process model. The method uses an error minimization optimization formulation to calibrate the equipment models, followed by the validation of the process model. The paper discusses various details such as experimental calibration procedure, applied error functions, optimization problem formulation, and the future development needed to completely realize the procedure for industrial use. The validated simulation model can be used for performing process planning and process optimization activities for the crushing plant’s operation.
Operational flexibility in an aggregate production process is required to adapt to changes in customer demands. Excessive demand for a particular product fraction can lead to operational alteration wherein re-crushing of the existing larger-sized product fraction is necessary. The choice of re-crushing existing product fractions results in feed condition changes to the crusher. One common approach to producing the desired product is by varying the operation settings of a crusher in a crushing plant. However, knowledge of differences in operational performance for changing feed conditions in the circuit is required. This potentially leads to a problem of performance optimization based on the desired target product, available feed material and capability of the crusher. The paper presents an application of a multi-objective optimization method to generate multiple operational settings for the dynamic change in the operation condition in a crushing plant. Controlled experimental survey data with varying feed conditions are used to calibrate the crusher model using an unconstrained optimization problem solved using a gradient-based algorithm (Quasi-Newton method). Trade-off curves between various performance indicators of the crushing plant using a dynamic simulation platform are generated using multi-objective optimization using a non-gradient-based algorithm (genetic algorithm). The results of the application can help the operators and plant managers to make proactive decisions to steer the operation of the crushing plant towards the desired needs of the operation.
A comminution process is a material size reduction and separation process which is primarily used in the aggregates and the minerals processing industry. Knowledge related to equipment’s operation, raw material properties, operational strategies, control system, maintenance, etc. is needed to design a capable plant. New needs are arising from the industry for existing operational crushing plants such as investigation for improvements, upscaling, and downscaling of the capacity. The paper presents an application of simulation-driven development for a crushing plant in an existing gold processing plant. Due to the change in ore characteristics and the need for optimizing the cost of operation, it is required to investigate the opportunities for improvement and alternative options for downscaling the capacity of the plant. A systematic process for configuring, developing, and evaluating alternative concepts using a process simulation tool is presented. The results show the process of generating knowledge for alternative crushing plant operation settings and how the choices can be selected and eliminated using boundary conditions. The evaluation presents possible improvements and alternative concepts with their opportunities and pitfalls.
The dynamics of milling circuits, particularly those involving Semi-Autogenous Grinding (SAG) mills, are not adequately studied, despite their critical importance in mineral processing. This paper aims to investigate the dynamic behavior of an SAG mill pebble recycling circuit under varying feed ore conditions, focusing on both uncontrollable parameters (such as ore hardness) and controllable parameters (including circuit layout and pebble crusher configurations). The study is carried out with Simulink dynamic simulations. Our findings reveal several key insights. Firstly, plant designs based solely on static simulations may not be adequate for large or complex circuits, as they fail to account for the dynamic nature of milling processes. Second, incorporating stockpiles after pebble crushing can effectively mitigate the impact of dynamic fluctuations, leading to more stable circuit performance. Third, different circuit layouts can facilitate easier maintenance and operational flexibility. Notably, finer pebble crushing can enhance circuit throughput by 5% to 10%.