Kasun Gunasekara

Mr. Kasun Gunasekara

Centre for Smart Modern Construction, Western Sydney University, Australia
orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 November 2022 in Journal of Industrial Information Integration
Verified
Journal Article
Closed access
SPSrinath Perera
Srinath Perera
XJXiaohua Jin
Xiaohua Jin
PDPriyadarshini Das
Priyadarshini Das
Kasun GunasekaraKasun Gunasekara
Kasun Gunasekara
MSMarini Samaratunga
Marini Samaratunga

28 February 2023 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
Srinath PereraSrinath Perera
Srinath Perera
Xiaohua JinXiaohua Jin
Xiaohua Jin
Marini SamaratungaMarini Samaratunga
Marini Samaratunga
Kasun GunasekaraKasun Gunasekara
Kasun Gunasekara
The construction industry around the world has identified the significance of digitalisation, and a wide range of research has explored the drivers and barriers of digitalisation within the construction industry. However, none has compared the views of designers and builders separately. Hence, this research critically reviewed drivers and barriers that affect the digitalisation of construction for designers and builders with an in-depth cross analysis. A detailed survey was conducted to capture drivers and barriers to digitalisation impacting the building sector in NSW, Australia. The survey captured the views of 542 respondents (347 designers and 195 builders), enabling the interpretation of results at a 95% level of confidence. Descriptive statistics were interpreted and cross analysis between designers and builders, and within different organisation sizes were conducted using the Mann-Whitney U test and Kruskal-Wallis H test. The survey findings were further verified through a series of primary stakeholder interviews (designers, builders, and software service providers). The findings of the survey, the cross-analysis, and the interviews were triangulated and collectively discussed to derive an in-depth understanding of drivers and barriers. ‘Greater level of accuracy and trustworthiness’ was rated the most important driver by both designers and builders, despite having significantly different response profiles. On the other hand, ‘high cost of software’ was rated the greatest barrier to digitalisation by both parties, whereas their response profiles were similar according to the cross analysis. In contrast to the designers, all builders had rated the top barriers in a similar way, irrespective of the size of the organisations. The results provide a greater understanding on the diverse views of designers and builders on drivers and barriers to the digitalisation of construction in NSW. This will direct government programmes and policy decisions to avoid considering both designers and builders as a monolithic block, when aiming at improving the state of digitalisation and performance of the construction industry.

23 August 2021 in Buildings
Verified
Journal Article
Open access
PDF file
Kasun GunasekaraKasun Gunasekara
Kasun Gunasekara
Srinath PereraSrinath Perera
Srinath Perera
Mary HardieMary Hardie
Mary Hardie
Xiaohua JinXiaohua Jin
Xiaohua Jin
Selecting a better performing contractor at the procurement stage is crucial in achieving a successful outcome for a construction project. The construction industry lacks a systematic and purpose driven method to assess performance of contractors using objective metrics. There are many approaches to measuring construction performance, but most are complicated and have high dependency on data that is difficult to attain. This paper aims to create a model for evaluating construction contractors’ performance based on directly attributable measures that are quantitative and easy to gather. This makes such a model more attractive and easier to use. Initially, a detailed literature review revealed different categories of measures of performance (MoP) and corresponding critical measures of performance (CMoP). Through a series of Delphi-based expert forums, the set of measures were fine-tuned and shortlisted. Fuzzy analytic hierarchy process-based comparisons were then used for developing a contractors’ performance model to quantify their level of performance based on a limited set of organisation-specific and project-specific measures. The results indicate a shift from traditional measures and a higher preference towards non-price measures. The performance model can be further developed to systematically rank the prospective contractors at the procurement stage based on seven non-price measures.