The framework of energy transition poses significant challenges in subtransmission network development, where the increased renewable energy generation is collected, in order to efficiently convey power production, avoiding limitations in a range of operating conditions. In this paper, a method to evaluate possible margins for further renewable penetration due to electric network development is assessed, by means of scenario evaluation for the concretisation of renewable initiatives, combined producibility analysis, and load flow studies, accounting for operation islands in subtransmission network organisation, carried out in N and N-1 conditions. The method is applied to a provisional model of the southern part of the Italian power system.
6 October 2020 in IEEE Open Access Journal of Power and Energy
Long-term transmission expansion planning has to face the energy transition in a restructured electricity market environment. Increased transmission capacity within and between Member States is likely to play an essential role in maintaining the secure and economic operation of the whole European power system and ensuring the integration of growing renewable generation. This paper proposes a novel iterative methodology aimed at assessing an optimal level of interconnection between relevant bidding zones, simultaneously investigating different potential alternatives. Starting from a reference grid, a multi-criteria analysis is adopted to select the additional transmission capacities to be tested in each iteration via network and market simulations in order to confirm that transmission expansion benefits outweigh the estimated realization costs. The proposed approach is applied to the Italian case in two contrasting energy scenarios for the mid-term 2030 and very-long-term 2040 horizons: different development strategies are derived, and the least regret criterion is applied to define the most cost-effective as the target development strategy for the Transmission System Operator (TSO). Furthermore, sensitivity analyses on relevant input data variation are performed to test the robustness of the results obtained.
A growing interest in offshore wind energy in the Mediterranean Sea has been recently observed thanks to the potential for scale-up and recent advances in floating technologies and dynamic cables: in the Italian panorama, the offshore wind connection requests to the National Transmission Grid (NTG) reached almost 84 GW at the end of September 2024. Starting from a realistic estimate of the offshore wind power plants (OWPPs) to be realized off the southern coasts in a very long-term scenario, this paper presents a novel optimization procedure for meshed AC offshore network configuration, aiming at minimizing the offshore wind generation curtailment based on the DC optimal power flow approximation, assessing the security condition of the whole onshore and offshore networks. The reactive power compensation aspects are also considered in the optimization procedure: the optimal compensation sizing for export cables and collecting stations is evaluated via the AC optimal power flow (OPF) approach, considering a combined voltage profile and minimum short circuit power constraint for the onshore extra-high voltage (EHV) nodes. The simulation results demonstrate that the obtained meshed network configuration and attendant re-active compensation allow most of the offshore wind generation to be evacuated even in the worst-case scenario, i.e., the N1 network, full offshore wind generation output, and summer line rating, testifying to the relevance of the proposed methodology for real applications.
8 October 2020 in IEEE Transactions on Power Delivery
The employment of High-Voltage Direct Current (HVDC) transmission in modern power systems is mainly driven by requirements of increasing power transfer over high distances in a cost-efficient and controllable way. HVDC control can ensure fast and accurate power flow control to improve the whole system performance as well as increased flexibility to manage flows from remote renewable generation and towards load centers, especially in a zonal market configuration. However, in the network planning phase the implications of a new HVDC connection, both on the steady-state and on dynamic operation of a power system, must be carefully evaluated with particular reference to possible outage events, depending on the operating conditions and on the exploited control schemes. In this paper, a real HVDC project within the Italian transmission network is considered in both the Voltage Source Converter (VSC) and Line Commutated Converter (LCC) technologies. The study implies a methodology to analyze the impact on steady-state and dynamic performances in the presence of faults, with a focus on grid security and on market efficiency. The behavior of the interconnected Italian power system is simulated in a development planning viewpoint by means of software tools exploited by the system operator.