Muaz O. Ahmed

Dr. Muaz O. Ahmed

orcid
Ph.D. | M.ASCE | Construction Engineering and Management

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2016 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Muaz O. AhmedMuaz O. Ahmed
Muaz O. Ahmed
Islam H. El-adawayIslam H. El-adaway
Islam H. El-adaway
KCKalyn T. Coatney
Kalyn T. Coatney
MEMohamed S. Eid
Mohamed S. Eid
In the construction industry, competitive bidding has long been used as a method for contractor selection. Because the true cost of construction is not known until the completion of the project, adverse selection is a major concern. Adverse selection is when the winner of the contract has underestimated the project’s true cost. Thus, the winning contractor will most likely earn negative or at least below normal profits. The winner’s curse is when the winning bidder submits an underestimated bid and is thus cursed by being selected to undertake the project. In the multistage bidding environment, where subcontractors are hired by a general contractor, the winner’s curse may be compounded. In general, contractors suffer from the winner’s curse for a variety of reasons including inaccurate estimates of project cost; new contractors entering the construction market; minimizing losses in case of recession of the construction industry; strong competition within the construction market; differential oppor...

1 December 2020 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
RARayan Assaad
Rayan Assaad
Islam H. El-adawayIslam H. El-adaway
Islam H. El-adaway
AHAyman H. El Hakea
Ayman H. El Hakea
MPMatthew J. Parker
Matthew J. Parker
THTyler I. Henderson
Tyler I. Henderson
Muaz O. AhmedMuaz O. Ahmed
Muaz O. Ahmed
Although building information modeling (BIM) is experiencing substantial development and use in the construction industry, its legal and business structures lag far behind. While many research efforts have been devoted to promoting the implementation of BIM in the construction industry, very few of them have actually attempted to explore its contractual environment. In fact, previous studies reported the lack of, and need for, a holistic understanding of BIM contractual requirements. To fill this gap, this paper assists the various project parties in better understanding BIM contractual integration and utilization in the construction industry at different key levels: contractual incorporation of BIM addenda/exhibits, priority of contract documents, roles and obligations, copyright ownership and intellectual property rights, standard of care, discrepancies in or between models, compensation and information establishment, BIM management and collaboration, use of models, and indemnity. Within the context of documents developed by the American Institute of Architects and ConsensusDocs, the authors used a three-step research methodology that comprised (1) reviewing and analyzing essential clauses, protocols, and addenda; (2) highlighting law cases that are related to BIM contracting in practice; and (3) comparing the different BIM implementation procedures and processes. To this end, the paper presents 20 contractual recommendations to help project parties better manage BIM-based projects from a contractual point of view. To verify/validate the usefulness and benefits of the performed analysis, the authors shared the paper’s recommendations with leading experts in BIM and digital/virtual construction. Some of the specific research recommendations offered in this paper include: preparation of a list of project participants that have incorporated BIM contractual documents into their agreements to provide reasonable evidence that BIM provisions have been included in the main and affiliated contracts, and the prohibition on disclosing any received BIM data to any third party except as required by law or a court order to avoid issues with copyright ownership and intellectual property rights. This research adds to the body of knowledge by providing an enhanced understanding of various BIM contractual aspects on construction projects.

1 September 2023 in Journal of Management in Engineering
Verified
Journal Article
Closed access
Muaz O. AhmedMuaz O. Ahmed
Muaz O. Ahmed
Islam H. El-adawayIslam H. El-adaway
Islam H. El-adaway

1 January 2021 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
RARayan Assaad
Rayan Assaad
Muaz O. AhmedMuaz O. Ahmed
Muaz O. Ahmed
Islam H. El-adawayIslam H. El-adaway
Islam H. El-adaway
AEAmr Elsayegh
Amr Elsayegh
VNVenkata Sriram Siddhardh Nadendla
Venkata Sriram Siddhardh Nadendla
Although previous research efforts have developed models to assist contractors in different bidding decisions, there is a lack of research work that investigates the impact of integrating learning algorithms into the construction bidding decision-making process. As such, this paper develops a simulation framework to determine the bid decision that would result in the optimal outcomes in the long run. To this end, the authors used a research methodology based on an algorithmic game theory approach. First, data was collected for 982 US public construction projects. Second, a framework was formulated to represent the bidding decision-making process. Third, a comparison between three learning algorithms was performed, including the multiplicative weights, the exponential weights, and the Roth-Erev. Fourth, two bidding strategies were simulated: the first strategy aims to win more projects while the second strategy aims to reduce the cases the contractor might fall prey to negative profits (known as the winner’s curse). The outcomes of this study demonstrated that integrating learning into construction bidding decision-making process (1) gives contractors competitive advantage over their competitors by either doubling their chance of winning more projects or reducing losses in the long run, and (2) benefits owners by ending-up paying less for their projects in the long run. Ultimately, this study adds to the body of knowledge by equipping contractors with a practical bidding framework that can be used in their bidding decision-making process to overcome the inherent complexities and uncertainties in the competitive construction bidding environment.

1 November 2021 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
Muaz O. AhmedMuaz O. Ahmed
Muaz O. Ahmed
MNMohamad Abdul Nabi
Mohamad Abdul Nabi
Islam H. El-adawayIslam H. El-adaway
Islam H. El-adaway
DCDustin Caranci
Dustin Caranci
JEJackson Eberle
Jackson Eberle
RSRoss Sparrow
Ross Sparrow
Integrated project delivery (IPD) was originally developed to overcome the challenges associated with increased project complexity, high fragmentation levels of the construction industry, and inadequate interoperability among the different stakeholders. Despite its documented benefits on project performance, IPD adoption is still witnessing a slow uptake in the US. Recent research studies have tied such slow adoption—in part—to the lack of contractual understanding and implementation of IPD. This paper addresses this critical research need. To this end, the authors used an interdependent research methodology consisting of (1) selection of IPD agreements; (2) identification of the main contractual IPD issues of concern that may lead to conflicts, claims, and/or disputes between the contracting parties through analysis of seven various IPD case study projects; and (3) reviewing and analyzing the contractual provisions, relevant to the identified IPD issues of concern, under the most pertinent national IPD standard forms of contracts. It is worth noting that in order to assure the scientific rigor of this research, the authors consulted throughout all methodological steps and verified research outcomes with the construction group of a leading legal firm. Results show that the major areas of concern in relation to contractual management of IPD processes include risks and incentives; liabilities and indemnification; suspension and termination; insurance; data sharing; and, dispute resolution. This study contributes to the body of knowledge by providing (1) a comparative analysis showing how these issues have been tackled under leading IPD standard forms of contracts; and (2) contractual guidelines to promote better understanding of effective and efficient IPD practices. As such, this research offers substantial practical implications through furnishing insightful information about causes of disputes in IPD agreements as well as how the most popular IPD contracts in the US handle them, and finally, checklist questions to serve as a reference for the contracting parties in negotiating the terms governing their IPD projects. Ultimately, this research should better support changing the contracting culture to better enable and facilitate broader and wider adoption of IPD practices in the US.

1 October 2021 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
Muaz O. AhmedMuaz O. Ahmed
Muaz O. Ahmed
RKRamy Khalef
Ramy Khalef
GAGasser G. Ali
Gasser G. Ali
Islam H. El-adawayIslam H. El-adaway
Islam H. El-adaway
Tunnels are an integrated part of the transportation infrastructure. Structural evaluation and inspection of tunnels are vital tasks to assess the deterioration of tunnels and maintain their level of service. Researchers have developed many predictive models that describe the deterioration of various infrastructure systems using data from formal inspections. However, there is a lack of research that developed predictive models of deterioration of tunnels in the US. Therefore, this paper investigated the feasibility of using various machine learning techniques to develop a computational data-driven decision support tool that predicts the deterioration of tunnels in the US. An ex ante framework for predicting the deterioration of tunnels in the US was developed. The research methodology comprised (1) collecting, cleaning, and standardizing data for tunnels in the US from the Federal Highway Administration (FHWA); (2) identifying the best subset of variables that allow predicting the deterioration of tunnels; (3) utilizing existing machine learning algorithms, namely k -nearest neighbors (KNN), random forest (RF), artificial neural networks (ANNs), and support vector machine (SVM), to develop classification models that predict the deterioration of tunnels; (4) optimizing the accuracy of the developed models by determining the best set of hyperparameters that result in the most accurate performance; (5) comparing the performance of the developed models and selecting the best performing model to be used as a decision support tool; and (6) evaluating and validating the performance of the selected model. The results identified 18 variables that greatly affect the deterioration of tunnels, with the tunnel width having the greatest impact on the prediction of deterioration of tunnels. Results indicated that the RF algorithm reached an accuracy of 85.38%, which was the highest accuracy, compared with KNN, ANN, and SVM, which reached an accuracy of 80.12%, 56.14%, and 56.73%, respectively. In addition, the entropy criterion function with a maximum of five features and 500 estimators successfully constructed the best hyperparameters for the selected RF model. Therefore, the developed decision support tool can be used by transportation entities to estimate the overall condition of tunnels based on specific tunnel parameters with reasonable prediction accuracy. It also can aid decision makers in developing, optimizing, and prioritizing maintenance plans and allocation of funding.