Ni Muyi

Prof. Dr. Ni Muyi

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2013 in Fusion Engineering and Design
Verified
Journal Article
Closed access
Ni MuyiNi Muyi
Ni Muyi
YWYongliang Wang
Yongliang Wang
BYBaoxin Yuan
Baoxin Yuan
JJJieqiong Jiang
Jieqiong Jiang
YWYican Wu
Yican Wu

1 April 2017 in Journal of Hazardous Materials
Verified
Journal Article
Closed access
BNBaojie Nie
Baojie Nie
Ni MuyiNi Muyi
Ni Muyi
SWShiping Wei
Shiping Wei

1 May 2015 in Fusion Engineering and Design
Verified
Journal Article
Closed access
Ni MuyiNi Muyi
Ni Muyi
CLChao Lian
Chao Lian
SZShichao Zhang
Shichao Zhang
BNBaojie Nie
Baojie Nie
JJJieqiong Jiang
Jieqiong Jiang

1 February 2019 in Environmental Pollution
Verified
Journal Article
Closed access
BNBaojie Nie
Baojie Nie
Ni MuyiNi Muyi
Ni Muyi
JLJinchao Liu
Jinchao Liu
ZZZhilin Zhu
Zhilin Zhu
ZZZuolong Zhu
Zuolong Zhu
FLFeng-Chen Li
Feng-Chen Li

1 March 2019 in Fusion Engineering and Design
Verified
Journal Article
Closed access
BNBaojie Nie
Baojie Nie
MJMan Jiang
Man Jiang
Ni MuyiNi Muyi
Ni Muyi
FLFeng-Chen Li
Feng-Chen Li

23 February 2019 in Energy Science & Engineering
Verified
Journal Article
Open access
PDF file
BNBaojie Nie
Baojie Nie
GRGuangming Ran
Guangming Ran
QZQin Zeng
Qin Zeng
HDHongfei Du
Hongfei Du
ZLZaixin Li
Zaixin Li
Fengchen LiFengchen Li
Fengchen Li
Commercial tritium resources available are too scarce to fully supply the future fusion reactors after International Thermonuclear Experimental Reactor (ITER). Tritium self‐sufficiency, ITER fails to fully validate, was regarded as one of the most important issues needed to be solved in the pathway of achieving fusion energy. After ITER, several concepts of fusion engineering test reactors and fusion demonstration reactors have been proposed worldwide, for example, Chinese Fusion Engineering Test Reactor (CFETR), Fusion Nuclear Science Facility (FNSF), DEMOnstration fusion reactor (DEMO) in European Union and Korea. CFETR is in the engineering design phase and would be hopefully completed around 2020. Tritium resources for the reactor start‐up and tritium self‐sufficiency are two primary issues besides the steady‐state operation for CFETR. The objectives of this work are as follows: (a) to introduce the preliminary fuel cycle concept and available tritium resources for CFETR, (b) to evaluate and discuss the tritium demand for CFETR start‐up (phase I: 200 MW) and the feasibility of DD start‐up, (c) to identify the possible pathways to tritium self‐sufficiency through sensitivity analysis based on the design baseline of CFETR, (d) to evaluate the consequences in case of failing tritium self‐sufficiency, and (e) to identify future R&D needed for tritium self‐sufficiency. It is expected to give insights into the question on how to start the reactor in a more economical way, into the feasibility of tritium self‐sufficiency, and into the question on what will happen in case of failing tritium self‐sufficiency.